Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20205L842 | 31 March 1999 | Rev 2 to EMF-96-125, LaSalle Unit 2 Cycle 8 Reload Analysis | Anticipated operational occurrence Feedwater Controller Failure Fuel cladding |
ML20205L839 | 22 March 1999 | Rev 2 to 960103, Neutronics Licensing Rept for LaSalle Unit 2,Cycle 8 | Shutdown Margin |
ML20134P891 | 18 February 1997 | Assessment of LaSalle County Nuclear Station | Fire Protection Program |
ML20135E695 | 30 September 1996 | Rev 2,Addendum 1 to Safety Review for LaSalle County Station Unit 1 & 2 Safety/Relief Valves Reduction & Setpoint Tolerance Relaxation Analyses | |
ML20129D414 | 23 September 1996 | Foam Transport in La Salle Svc Water Tunnel | Probabilistic Risk Assessment |
ML20129D408 | 23 September 1996 | Final Rept on Foam Morphology & Transport Tests for La Salle Nuclear Plant | |
ML20116B601 | 2 July 1996 | Rev 0 to Addendum a to Piping Stress Rept, for Unit 1 | Earthquake |
ML20107K828 | 31 March 1996 | County Station PRA Summary Document | Safe Shutdown Reactor Vessel Water Level Internal Flooding Probabilistic Risk Assessment Earthquake Maintenance Rule Program |
ML20100L355 | 29 February 1996 | RPV Surveillance Matls Testing & Analysis | |
ML20135E688 | 29 February 1996 | Safety Review for LaSalle County Station Units 1 & 2 Safety Relief Valves Reduction & Setpoint Tolerance Relaxation Analyses | Unanalyzed Condition Shutdown Margin Reactor Vessel Water Level Anticipated operational occurrence Fuel cladding Power Uprate |
B130178, Demonstration of Compliance W/10CFR50,App G for LaSalle Unit 2 Plate Matl | 29 February 1996 | Demonstration of Compliance W/10CFR50,App G for LaSalle Unit 2 Plate Matl | |
ML20096D118 | 22 December 1995 | Course of Action Progress Rept | High Radiation Area B.5.b Scram Discharge Volume |
ML20091S088 | 10 August 1995 | Rept of Walkdown to Verify Adequacy of Ms Drain Line & Condenser for Use as Alternate MSIV Leakage Treatment Sys | Safe Shutdown Earthquake Seismically rugged Design basis earthquake Earthquake |
ML20091P902 | 10 August 1995 | Rept of Walkdown to Verify Adequacy of Ms Drain Line & Condenser for Use as Alternate MSIV Leakage Treatment Sys for Lasalle County Nuclear Station Unit 1 | Safe Shutdown Earthquake Seismically rugged Design basis earthquake Earthquake |
ML20085K230 | 30 June 1995 | Rev 1 to GE Rept GE-NE-523-A166-1294, LaSalle Unit 1 RPV Surveillance Matls Testing & Analysis | |
ML20083K679 | 31 May 1995 | Course of Action Progress Rept May 1995 | Packing leak High Radiation Area Fire Barrier Stroke time Zebra Mussel Scram Discharge Volume |
ML20083K675 | 30 April 1995 | Course of Action (Formerly Mgt Overview) Revised to Include Issue Ref Numbers Apr 1995 | High Radiation Area Hydrostatic Probabilistic Risk Assessment Foreign Material Exclusion B.5.b Mitigating Strategies Power change |
ML20087H794 | 31 March 1995 | Nonproprietary Safety Review for LSCS Unit 1 & 2 SRVs Reduction & Setpoint Tolerance Relaxation Analyses | Unanalyzed Condition Shutdown Margin Reactor Vessel Water Level Anticipated operational occurrence Fuel cladding |
ML20081J864 | 22 March 1995 | RPV Surveillance Matls Testing & Analysis | |
ML20029D673 | 29 April 1994 | County Station IPE Submittal Rept. | Reactor Vessel Water Level Mission time Fire Barrier Internal Flooding Probabilistic Risk Assessment Earthquake Turbine Missile |
ML20105C720 | 30 September 1992 | Draft Rev 3 to 10CFR50.59 Evaluation for CRD Housing Support Clearance,Lasalle County Station | |
ML20105C713 | 15 September 1992 | Rev 5 to 10CFR50.59 Safety Evaluation,Lasalle Station,Mod/ Minor Plant Change M1-1-90-009 & M1-2-90-007 | Overtravel Turbine Missile |
ML20097F099 | 21 May 1992 | Rev 1 to Licensing Rept for Capacity Expansion of LaSalle County Station Unit 1 | High Radiation Area Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake Nondestructive Examination Finite Element Analysis Design basis earthquake Earthquake Fuel cladding |
ML20091J089 | 20 December 1991 | Final Technical Evaluation Rept,Lasalle County Station, Units 1 & 2,Station Blackout Evaluation | Safe Shutdown Reactor Vessel Water Level |
ML20100Q191 | 31 October 1991 | Safety Evaluation for LaSalle Nuclear Station NF500 Cylindrical Refueling Mast | |
ML20082A693 | 31 March 1991 | Structural Evaluation of Com Ed BWR Reactor Pressure Vessel Head Stud Cracking | Hydrostatic |
ML20011D968 | 31 December 1989 | Core Operating Limits Rept for LaSalle County Station Unit 1,Reload 3 (Cycle 4). | |
ML17347B462 | 31 December 1989 | App a to USI A-46 & Generic Ltr 87-02. | Safe Shutdown Safe Shutdown Earthquake Probabilistic Risk Assessment Operating Basis Earthquake Earthquake Backfit |
ML19325D329 | 2 October 1989 | Comm Ed Rept of LaSalle Unit 2 Trip,890826. | Scram Discharge Volume |
ML20246D687 | 14 August 1989 | Rev 1 to Criticality Analysis of Byron & Braidwood Station High Density Fuel Racks | |
ML19327B401 | 31 July 1989 | Safety Evaluation for Byron/Braidwood Stations Units 1 & 2 Transition to Westinghouse 17 X 17 Vantage 5 Fuel. | |
ML18008A031 | 31 July 1989 | NTH-TR-01 Decrease in Heat Removal by Secondary Sys. | Safe Shutdown Rod Drop Event |
ML20246D671 | 30 June 1989 | Criticality Analysis of Byron/Braidwood Fresh Fuel Racks | |
ML20247H071 | 30 June 1989 | Description & Verification Summary of Computer Program, Gappipe | Earthquake |
ML20247H079 | 22 June 1989 | App to Description & Verification Summary of Computer Program,Gappipe | |
ML20247N062 | 31 May 1989 | Production Training Dept,Braidwood,Malfunctions & Initial Conditions | |
ML20247K301 | 12 May 1989 | Leak-Before-Break Evaluation for Carbon Steel Piping | Safe Shutdown Earthquake Hydrostatic Finite Element Analysis Earthquake Flow Induced Vibration |
ML20247L184 | 12 May 1989 | Leak-Before-Break Evaluation for Stainless Steel Piping, Byron & Braidwood Nuclear Power Stations Units 1 & 2 | Packing leak Safe Shutdown Earthquake Liquid penetrant Flow Induced Vibration |
ML18094A355 | 30 April 1989 | Assessment of Impacts of Salem & Hope Creek Generating Stations on Kemps Ridley (Lepidochelys Kempi) & Loggerhead (Carretta Caretta) Sea Turtles. | Safe Shutdown Earthquake |
ML20247F132 | 23 March 1989 | Post-Tensioning Sys Evaluation,Callaway Unit 1 Containment & Wolf Creek Unit 1 Containment | |
ML17251A481 | 28 February 1989 | Ultrasonic Indication Sizing Technique Development. Related Info Encl | Hydrostatic |
ML20005G421 | 28 February 1989 | Reactor Vessel Heatup & Cooldown Limit Curves for Normal Operation. | Hydrostatic |
ML20206C745 | 30 November 1988 | ATWS Mitigation Sys Specific Design for Byron/Braidwood Stations, Rev 5 | |
ML20205T750 | 4 November 1988 | Detection & Skin Dose Evaluation for Characteristic X-Ray in Activation Product Contamination | |
ML20206K310 | 31 October 1988 | Rev 1 to Impact of Reg Guide 1.99,Rev 2 on Limerick Generating Station Unit 1 | |
ML20206K302 | 31 October 1988 | Rev 1 to Impact of Reg Guide 1.99,Rev 2 on Peach Bottom Atomic Power Station Unit 3 | |
ML20154N608 | 30 September 1988 | Rev 1 to Identification of Unisolable Piping & Determination of Insp Locations | Nondestructive Examination |
ML20154K209 | 9 September 1988 | Rev 0 to Response to NRC Bulletin 88-005,Nonconforming Matls Supplied by Piping Supplies,Inc at Folsom,Nj & West Jersey Mfg Co.... Proprietary Procedure 1404.1, Leeb Hardness Testing (Equotip).... Encl.Procedure Withheld | |
ML20245B418 | 17 August 1988 | Investigation Rept,Design & Operation of Sampling Sys for Analysis of High Purity Water | Grab sample |
ML17347A797 | 16 June 1988 | Seismic Hazard Data Prepared for Resolution of USI A-46. | Earthquake |