Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML17292B2644 March 1998Performance Self Assessment,WNP-2.High Radiation Area
Half scram
Offsite Dose Calculation Manual
Temporary Modification
Condition Adverse to Quality
Systematic Assessment of Licensee Performance
Severe Accident Management Guideline
Fire Protection Program
Power change
ML17292A39230 June 1996WNP-2 Ten Mile EPZ Evacuation Time Estimate Study.High winds
ML17291B29331 December 1995Adjustable-Speed Drive Retrofit for Ormond Beach Fd Fans.
ML17291B1406 July 1995Technical Evaluation Rept,Wppss Plant No 2,Pump & Valve Ist,Rev 0,Second Ten-Yr Interval.Safe Shutdown
Reactor Vessel Water Level
Ultimate heat sink
Stroke time
Anticipated operational occurrence
Post Accident Monitoring
Nondestructive Examination
Temporary Modification
Scram Discharge Volume
Earthquake
Power-Operated Valves
Power change
ML17291A94230 June 1995Rev 0 to IPE of External Events WNP2.
ML17291A5697 December 1994Simulator Facility Certification.Shutdown Margin
Loop seal
Half scram
Stroke time
Scram Discharge Volume
Overtravel
Earthquake
Fuel cladding
Coast down
ML17291A44813 October 1994WNP-2 Response to Request for Addl Info on Emergency Classification.Safe Shutdown
Reactor Vessel Water Level
Grab sample
Offsite Dose Calculation Manual
Power change
ML17290A91827 December 1993Justification for Revised Tornado Design Criteria,Rev 1.High winds
Tornado Generated Missile
ML17290A6908 October 1993Revised Significant Hazards Consideration Assessment for WNP-2 Power Uprate W/Elll.
ML17290A68627 September 1993Rev 1 to Evaluation of Sources of Radioactive Matl Found in Cooling Tower Sediments at Washington Nuclear Plant 2.Chernobyl
ML17290A38318 May 1993Rept R-R8-111 Re Flaw in Reactor Recirculation Piping
ML17289B07523 November 1992Rev 0 to Technical Memorandum Tm 2025, Secondary Containment/Standby Gas Treatment Design Basis.Hot Short
Emergency Lighting
ML17289A9887 October 1992Containment Atmosphere Control Sys (CAC) Summary Issues.Hot Short
Loop seal
Stroke time
Temporary Modification
ML17289A72530 June 1992Institutional Custody Fiduciary Svcs.
ML17289A72330 June 1992Institutional Custody Fiduciary Svcs.
ML17289A92824 June 1992WNP-2 Simulator Certification NRC Form 474 Supporting Documentation.Shutdown Margin
Half scram
Stroke time
Scram Discharge Volume
Overtravel
Fuel cladding
Coast down
ML17289A53511 May 1992App B, 8X8 Extended Burnup, of EMF-92-040, WNP-2 Cycle 8 Reload Analysis.Anticipated operational occurrence
Power change
ML17286B02120 August 1991Root Cause Analysis Summary, Unsatisfactory Licensed Operator Requalification Program, Reflecting Causes of Operators Continued Inability to Respond to Severe Accident ConditionsEarthquake
Unidentified leakage
ML17286A91530 June 1991Asset Summary 910630.
ML17286A91430 June 1991Summary of Transactions for 900630-910630.
ML17347B46231 December 1989App a to USI A-46 & Generic Ltr 87-02.Safe Shutdown
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Operating Basis Earthquake
Earthquake
Backfit
ML17285A96327 December 1989Feedwater Nozzle Insp Rept for Refueling Outage RF89A Spring 1989.Coatings
Dissimilar Metal Weld
ML17285A88714 August 1989Rev 0 to Commercial Grade Dedication Project for Wppss Contract C-30298.Commercial Grade Dedication
ML20246D68714 August 1989Rev 1 to Criticality Analysis of Byron & Braidwood Station High Density Fuel Racks
ML19327B40131 July 1989Safety Evaluation for Byron/Braidwood Stations Units 1 & 2 Transition to Westinghouse 17 X 17 Vantage 5 Fuel.
ML17285A64131 July 1989Instrument Air Sys Review Response to Generic Ltr 88-14. W/Six Oversize FiguresWeld Overlay
ML18008A03131 July 1989NTH-TR-01 Decrease in Heat Removal by Secondary Sys.Safe Shutdown
Rod Drop Event
ML20247H07130 June 1989Description & Verification Summary of Computer Program, GappipeEarthquake
ML20246D67130 June 1989Criticality Analysis of Byron/Braidwood Fresh Fuel Racks
ML20247H07922 June 1989App to Description & Verification Summary of Computer Program,Gappipe
ML20247N06231 May 1989Production Training Dept,Braidwood,Malfunctions & Initial Conditions
ML20247L18412 May 1989Leak-Before-Break Evaluation for Stainless Steel Piping, Byron & Braidwood Nuclear Power Stations Units 1 & 2Packing leak
Safe Shutdown Earthquake
Liquid penetrant
Flow Induced Vibration
ML20247K30112 May 1989Leak-Before-Break Evaluation for Carbon Steel PipingSafe Shutdown Earthquake
Hydrostatic
Finite Element Analysis
Earthquake
Flow Induced Vibration
ML18094A35530 April 1989Assessment of Impacts of Salem & Hope Creek Generating Stations on Kemps Ridley (Lepidochelys Kempi) & Loggerhead (Carretta Caretta) Sea Turtles.Safe Shutdown
Earthquake
ML20247F13223 March 1989Post-Tensioning Sys Evaluation,Callaway Unit 1 Containment & Wolf Creek Unit 1 Containment
ML20005G42128 February 1989Reactor Vessel Heatup & Cooldown Limit Curves for Normal Operation.Hydrostatic
ML17251A48128 February 1989Ultrasonic Indication Sizing Technique Development. Related Info EnclHydrostatic
ML17285A19714 December 1988Feedwater Nozzle Insp Rept for Refueling Outage RF88A, Spring,1988.Nondestructive Examination
Dissimilar Metal Weld
ML20206C74530 November 1988ATWS Mitigation Sys Specific Design for Byron/Braidwood Stations, Rev 5
ML20205T7504 November 1988Detection & Skin Dose Evaluation for Characteristic X-Ray in Activation Product Contamination
ML20206K31031 October 1988Rev 1 to Impact of Reg Guide 1.99,Rev 2 on Limerick Generating Station Unit 1
ML20206K30231 October 1988Rev 1 to Impact of Reg Guide 1.99,Rev 2 on Peach Bottom Atomic Power Station Unit 3
ML20154N60830 September 1988Rev 1 to Identification of Unisolable Piping & Determination of Insp LocationsNondestructive Examination
ML20154K2099 September 1988Rev 0 to Response to NRC Bulletin 88-005,Nonconforming Matls Supplied by Piping Supplies,Inc at Folsom,Nj & West Jersey Mfg Co.... Proprietary Procedure 1404.1, Leeb Hardness Testing (Equotip).... Encl.Procedure Withheld
ML20245B41817 August 1988Investigation Rept,Design & Operation of Sampling Sys for Analysis of High Purity WaterGrab sample
ML17347A79816 June 1988Radiological Data Prepared for Resolution of USI A-46.Safe Shutdown Earthquake
Earthquake
Backfit
ML17347A79716 June 1988Seismic Hazard Data Prepared for Resolution of USI A-46.Earthquake
ML20150F29431 May 1988Rev 4 to, ATWS Mitigation Sys Specific Design for Byron/ Braidwood Stations
ML20196L62820 May 1988Rev 2 to ATWS Mitigation Sys Actuation Circuitry (Amsac)Anticipated operational occurrence
ML20196L6426 May 1988ATWS Mitigation Sys Actuation Circuitry Response to Unit Transients