Issue date | Title | Topic | |
---|---|---|---|
ML20217P635 | 29 September 1999 | Non-proprietary Rev 6 to HI-982083, Licensing Rept for Spent Fuel Rack Installation at Byron & Braidwood Nuclear Stations | Safe Shutdown Earthquake Operating Basis Earthquake Earthquake |
ML20207H762 | 28 June 1999 | Pressure Temp Limits Rept (Ptlr) | Hydrostatic Pressure and Temperature Limits Report |
ML20207H756 | 28 June 1999 | Pressure Temp Limits Rept (Ptlr) | Hydrostatic Pressure and Temperature Limits Report |
ML20204H994 | 3 March 1999 | Non-proprietary Rev 4 to HI-982083, Licensing Rept for Spent Fuel Rack Installation at Byron & Braidwood Nuclear Stations | Safe Shutdown Boric Acid High Radiation Area Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake Nondestructive Examination Earthquake Control of Heavy Loads Fuel cladding Liquid penetrant Overexposure Affidavit Depleted uranium |
ML20207H767 | 5 October 1998 | Rv Weld Chemistry & Initial Rt Ndt | |
ML20195D122 | 31 August 1998 | DSAR, for Zion Station | Fitness for Duty High winds Offsite Dose Calculation Manual Operating Basis Earthquake Design basis earthquake Process Control Program Frazil ice Earthquake Maintenance Rule Program Fuel cladding Fire Protection Program |
ML20236U475 | 23 July 1998 | SG Eddy Current Insp Rept Cycle 7 Refueling Outage (B2R07) | Hydrostatic |
ML20198J564 | 7 January 1998 | Unit 2 Pressure & Temp Limits Rept | Hydrostatic Pressure and Temperature Limits Report |
ML20198J553 | 7 January 1998 | Unit 1 Pressure & Temp Limits Rept | Hydrostatic Pressure and Temperature Limits Report |
ML20198J520 | 7 January 1998 | Pressure Temp Limits Rept (Ptlr) | Hydrostatic Pressure and Temperature Limits Report |
ML20198J506 | 7 January 1998 | Pressure Temp Limits Rept (Ptlr) | Hydrostatic Pressure and Temperature Limits Report |
ML20198P659 | 31 December 1997 | .0 Volt IPC Full Cycle Operation Technical Basis Supplement to 'Braidwood Unit 1 Cycle 7 Interim Plugging Criteria Rept,Aug 1997.' | |
ML20202F145 | 3 December 1997 | Independent Investigation Team Rept on Safety Conscious Work Environment at Zion Station | |
ML20199E880 | 3 November 1997 | Revised Byron Unit 2 Pressure Temperature Limits Rept (PTLR) | Hydrostatic Pressure and Temperature Limits Report |
ML20199E875 | 3 November 1997 | Revised Byron Unit 1 Pressure Temperature Limits Rept (Ptlr) | Hydrostatic Pressure and Temperature Limits Report |
ML20210P861 | 31 August 1997 | Cycle 7 Interim Plugging Criteria Rept | |
ML20216E804 | 31 July 1997 | Evaluation of Paint Chip Head Loss on Vertically Oriented Zion Station Strainer Screen July 1997 Test Phases. W/Two Oversize Drawings | High Radiation Area Scaffolding |
ML20217G617 | 22 July 1997 | Operability Assessment Process Form | |
ML20141K043 | 21 May 1997 | Pressure & Temp Limits Rept | Hydrostatic Pressure and Temperature Limits Report |
ML20141K037 | 21 May 1997 | Pressure & Temp Limits Rept | Hydrostatic Pressure and Temperature Limits Report |
ML20141K024 | 21 May 1997 | Pressure & Temp Limits Rept | Hydrostatic Pressure and Temperature Limits Report |
ML20141K018 | 21 May 1997 | Pressure & Temp Limits Rept | Hydrostatic Pressure and Temperature Limits Report |
ML20148P881 | 16 May 1997 | Spent Fuel Rack Criticality Analysis Using Soluble B Credit | Boric Acid Safe Shutdown Earthquake Earthquake |
ML20141G636 | 15 May 1997 | Interim Plugging Criteria Return to Power Rept | |
ML20141F714 | 15 May 1997 | Operability Assessment Process Form | |
ML20138H000 | 28 April 1997 | Locked Tube Tts Circumferential Indication Root Cause Determination Evaluation | |
ML20140G527 | 18 April 1997 | Results of Level I Investigation at Zion Station,970221 Reactivity Mgt Investigation | Safe Shutdown Fitness for Duty |
ML20134P371 | 18 February 1997 | Independent Self Assessment Team for Zion Nuclear Power Station | Emergency Lighting Fire Protection Program |
ML20138K045 | 22 January 1997 | Sys Matls Analysis Dept Rept on Evaluation of Level Coatings in Zion Station Unit 2 Containment | Coatings |
ML20133B382 | 30 December 1996 | IPEEE for Severe Accident Vulnerabilities Submittal Rept Zion Nuclear Generating Station Units 1 & 2 | Safe Shutdown High winds Shutdown Margin Fire Barrier Safe Shutdown Earthquake Probabilistic Risk Assessment Seismically rugged Design basis earthquake Earthquake Weak link |
ML20134M313 | 13 November 1996 | Revised SG Tube Rupture Analysis for Byron/Braidwood | |
ML20134N313 | 31 October 1996 | Sys Design Description for Containment Spray | Safe Shutdown Boric Acid Ultimate heat sink Safe Shutdown Earthquake Coatings Operating Basis Earthquake Earthquake |
ML20134N801 | 31 October 1996 | Spent Fuel Rack Criticality Analysis W/Credit for Soluble Boron | |
ML20129F892 | 30 September 1996 | Circumferential Indication Summary Rept | |
ML20129G388 | 31 August 1996 | Unit-1 EOC 7B Interim Plugging Criteria Rept | |
ML20116H146 | 1 August 1996 | Cycle Length Assessment Rept Addendum | Nondestructive Examination |
ML20113B095 | 30 June 1996 | Interim Plugging Criteria Return to Power Rept | |
ML20112B852 | 17 May 1996 | Cycle Length Assessment Rept Suppl | |
ML20117J049 | 8 May 1996 | At&T Round Cell Nuclear Util User'S Council Charter | |
ML20106G589 | 30 April 1996 | Training Dept Braidwood Simulator 1996 Certification Rept | |
ML20101E765 | 31 March 1996 | Unit - 1 EOC 7A Interim Plugging Criteria Rept | |
ML20100R737 | 29 February 1996 | Cycle 6 Interim Plugging Criteria 90 Day Rept | |
ML20095G069 | 31 December 1995 | Interim Plugging Criteria Return to Power Rept | |
ML20094K610 | 30 November 1995 | Interim Plugging Criteria Return to Power Rept | |
ML20093G717 | 12 October 1995 | Rev 0 to PSA-B-95-18, RELAP5M3 Comparison of Model Boiler 2 MSLB from Hzp Test | |
ML20093G882 | 11 October 1995 | Rev 0 to PSA-B-95-17, Calculation of Byron 1/Braidwood 1 D4 SG Tube Support Plate Loads w/RELAP5M3 | |
ML20092A973 | 1 September 1995 | Independent Verification of Byron/Braidwood D4 SG Tube Support Plate Differential Pressures During Mslb | |
ML20091M871 | 25 August 1995 | Rept of Independent Assessment of Calculation of TSP Forces | |
ML20084V210 | 9 June 1995 | Interim Plugging Criteria 90 Day Rept | Boric Acid |
ML20078P155 | 6 February 1995 | Probability of Detection by Bobbin Insp |