05000293/FIN-2016011-062017Q1PilgrimDesign Change Not Appropriately Reviewed by Entergy
05000293/FIN-2016011-012017Q1PilgrimFailure to Identify All Root Causes of a Significant Condition Adverse to Quality
05000293/FIN-2016011-022017Q1PilgrimFailure to Establish Corrective Actions to Preclude Repetition of a Significant Condition Adverse to Quality
05000293/FIN-2016011-032017Q1PilgrimFailure to Issue Appropriate Corrective Actions to Preclude Repetition for the Causes of the September 2016 Scram
05000293/FIN-2016011-042017Q1PilgrimProgrammatic Issue with Implementation of the Operability Determination Process
05000293/FIN-2016011-072017Q1PilgrimFailure to Report Condition Prohibited by Technical Specifications and a Safety System Functional Failure
05000293/FIN-2016011-052017Q1PilgrimFailure to Establish Corrective Actions to Address Scope of Procedure Quality Issues
05000293/FIN-2016011-082017Q1PilgrimFailure to Adequately Monitor the Performance of Maintenance Rule Scoped Components
05000293/FIN-2016011-092017Q1PilgrimIneffective Corrective Actions to Address Conditions Adverse to Quality Regarding Components in Contact with or Close Proximity to the Drywell Liner
05000293/FIN-2016011-102017Q1PilgrimFailure to Promptly Correct a Condition Adverse to Quality for the Residual Heat Removal System
05000293/FIN-2016011-112017Q1PilgrimFailure to Adequately Develop and Implement Targeted Performance Improvement Plans
05000293/FIN-2016009-012016Q2PilgrimFailure to Correct a Condition Adverse to Quality Associated with the Salt Service Water System
05000313/FIN-2016007-022016Q1Arkansas NuclearInadequate Effectiveness Reviews for Corrective Actions to Prevent Recurrence
05000293/FIN-2016008-012016Q1PilgrimFailure to Promptly Identify and Correct Core Spray System Leakage
05000368/FIN-2016007-102016Q1Arkansas NuclearFailure to Develop an Operability Decision-Making Issue for Degraded Condition on Safety Injection Tank
05000313/FIN-2016007-112016Q1Arkansas NuclearPressurizer Block Valve Not Installed in the Qualified Environmental Configuration
05000313/FIN-2016007-122016Q1Arkansas NuclearFailure to Perform Predictive Maintenance on Safety-Related Medium-Voltage Switchgear
05000313/FIN-2016007-152016Q1Arkansas NuclearFailure to Maintain Structural Design Clearances inside the Unit 1 and 2 Reactor Containment Buildings
05000368/FIN-2016007-052016Q1Arkansas NuclearFailure to Include Unit 2 Service Water Pump Supports in the ASME Code Section XI Inservice Inspection Program
05000368/FIN-2016007-072016Q1Arkansas NuclearFailure to Maintain Service Water Design Cooling to the Unit 2 High Pressure Safety Injection Pump Seal and Bearing Coolers
05000368/FIN-2016007-082016Q1Arkansas NuclearInadequate Flow Monitoring of Unit 2 Service Water to Emergency Feedwater Pump Suction Supply
05000313/FIN-2016007-142016Q1Arkansas NuclearFailure to Properly Implement the Corrective Action Program
05000313/FIN-2016007-012016Q1Arkansas NuclearFailure to Complete Extent of Condition Reviews for the Stator Drop Significant Condition Adverse to Quality Event
05000313/FIN-2016007-162016Q1Arkansas NuclearFailure to Properly Calibrate Unit 1 Reactor Building Atmospheric Particulate Radiation Monitor RE-7460
05000313/FIN-2016007-132016Q1Arkansas NuclearFailure to Update Probabilistic Risk Assessment Model in a Timely Manner Results in Failure to Submit Complete and Accurate Information
05000313/FIN-2016007-092016Q1Arkansas NuclearEmergency Feedwater Pump Casing Wall Loss Not Monitored
05000313/FIN-2016007-062016Q1Arkansas NuclearFailure to Correct Degraded Unit 2 Train B Emergency Diesel Generator Heat Exchangers Service Water Flow and Degraded Unit 1 Containment Coatings
05000313/FIN-2016007-172016Q1Arkansas NuclearDetermine Impact of Modifying Fire Seals for Flood Protection
05000313/FIN-2016007-042016Q1Arkansas NuclearInadequate Control of Monitoring for Wall Loss in the Service Water System
05000313/FIN-2016007-032016Q1Arkansas NuclearInadequate Operating Experience Evaluations
05000259/FIN-2013011-092013Q2Browns FerryFailure to control a modification to the seismically mounted control room ceiling light diffusers
05000259/FIN-2013011-022013Q2Browns FerryFailure to Follow Procedure during Implementation of Plant Modifications to the Residual Heat Removal and Core Spray Systems
05000259/FIN-2013011-032013Q2Browns FerryFailure to Perform 10 CFR 50.59 Evaluation Intergranular Stress Corrosion Cracking Examination on ASME Code Class 1 Piping Weld
05000259/FIN-2013011-042013Q2Browns FerryTwo BFN Assistant Unit Operators Closed and Danger Tagged the A1 RHRSW Pump Manual Discharge Valve Instead of the Required A2 RHRSW Pump Discharge Valve
05000259/FIN-2013011-062013Q2Browns FerryConduct of Operations Procedure Violation
05000259/FIN-2013011-162013Q2Browns FerryFailure to Establish Qualified Ultrasonic Examination Procedures
05000259/FIN-2013011-152013Q2Browns FerryDeficient Design Control for RHR Service Water Freeze Protection
05000259/FIN-2013011-142013Q2Browns FerryFailure to Implement an Adequate Test Program for RHRSWS and EECS
05000259/FIN-2013011-132013Q2Browns FerryFailure To Translate The Design Into Procedure 3-SR-3.3.8.2.1(B)
05000259/FIN-2013011-122013Q2Browns FerryDeficient Acceptance Criteria for Main Battery Bank 1
05000259/FIN-2013011-112013Q2Browns FerryInadequate Corrective Actions to Address Programmatic Procedure Quality Issue
05000259/FIN-2013011-102013Q2Browns FerryRequirements for Concurrent Verification, Independent Verification, and Peer Checks
05000259/FIN-2013011-082013Q2Browns FerryFailure to Manage Emergent Risk Condition during A1 and A2 RHRSW Inoperability
05000259/FIN-2013011-072013Q2Browns FerryFailure to Adequately Implement Procedure 3-SR-3.3.8.2.1(B)
05000259/FIN-2013011-012013Q2Browns FerryFailure to Perform Evaluation of Nonconforming Material during Commercial Grade Dedication of Safety-Related Bearings
05000259/FIN-2013011-052013Q2Browns FerryMaintenance Personnel Not Following Clearance Procedure Violation
05000285/FIN-2012011-032012Q4Fort CalhounFailure to Ensure that Adequate Equipment was Available to Measure River Level Locally to be Able to Comply with an Abnormal Operating Procedure
05000259/FIN-2011012-012011Q4Browns FerryDegraded Electrolytic Capacitor Test Results Not Entered into Corrective Action Program
05000259/FIN-2011011-012011Q3Browns FerryFailure to Implement Requirements of the Inservice Testing Program
05000259/FIN-2011011-022011Q3Browns FerryFailure to Reestablish Motor Operated Valve Design Basis Capability after Performing Modifications to the Valves