ML22251A171 | 7 September 2022 | 10 CFR 50 Appendix E Evacuation Time Estimate Analysis for the Monticello and Prairie Island Nuclear Generating Plants | Pandemic Coronavirus |
L-MT-22-026, Changes to the Emergency Plan | 19 July 2022 | Changes to the Emergency Plan | Health Physics Network High Radiation Area Met Tower Design basis earthquake Severe Accident Management Guideline Earthquake Minimum staff |
ML22161A915 | 10 June 2022 | and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Response to a Request for Additional Information Xcel Energy Amendment Request to Create a Common Emergency Plan and Emergency Operations. | Safe Shutdown Health Physics Network Offsite Dose Calculation Manual Earthquake Minimum staff Fire Protection Program Grace period |
ML21320A226 | 15 November 2021 | License Amendment Request: Standard Emergency Plan and Consolidated Emergency Operations Facility for the Monticello Nuclear Generating Plant and the Prairie Island Nuclear Generating Plant | |
ML21160A105 | 9 June 2021 | Enclosure 1: Summary of Changes | Reactor Vessel Water Level FLEX Design basis earthquake B.5.b Mitigating Strategies Earthquake |
L-MT-21-036, Enclosure 2: New Revision 55 of Emergency Plan | 9 June 2021 | Enclosure 2: New Revision 55 of Emergency Plan | |
ML18302A255 | 26 October 2018 | Procedure Change Summary Analysis and Revision 7 to FP-EP-PLAN-01, Offsite Nuclear Emergency Plan | |
ML18299A084 | 26 October 2018 | Submittal of Offsite Nuclear Emergency Plan Revision | |
L-MT-18-044, Changes to the Monticello Nuclear Generating Plant (MNGP) Emergency Plan | 28 August 2018 | Changes to the Monticello Nuclear Generating Plant (MNGP) Emergency Plan | Health Physics Network High Radiation Area Design basis earthquake Severe Accident Management Guideline Earthquake Minimum staff |
L-MT-18-024, Changes to the Monticello Nuclear Generating Plant (MNGP) Emergency Plan | 24 April 2018 | Changes to the Monticello Nuclear Generating Plant (MNGP) Emergency Plan | Safe Shutdown Health Physics Network High winds Reactor Vessel Water Level High Radiation Area Operating Basis Earthquake Design basis earthquake Severe Accident Management Guideline Earthquake Pressure Boundary Leakage Minimum staff |
L-MT-17-080, Submittal of Changes to the Monticello Nuclear Generating Plant (MNGP) Emergency Plan | 6 December 2017 | Submittal of Changes to the Monticello Nuclear Generating Plant (MNGP) Emergency Plan | |
L-MT-17-048, Submittal of Change to the Monticello Nuclear Generating Plant (MNGP) Emergency Plan | 15 June 2017 | Submittal of Change to the Monticello Nuclear Generating Plant (MNGP) Emergency Plan | |
L-MT-17-029, Changes to the Monticello Nuclear Generating Plant (MNGP) Emergency Plan | 18 April 2017 | Changes to the Monticello Nuclear Generating Plant (MNGP) Emergency Plan | Health Physics Network High Radiation Area Design basis earthquake Severe Accident Management Guideline Earthquake Fuel cladding Pressure Boundary Leakage Integrated Public Alert and Warning System Siren |
L-MT-17-012, License Amendment Request to Revise Emergency Action Level Scheme: Emergency Action Level Matrix, Hot Conditions (Attachment 5) | 31 March 2017 | License Amendment Request to Revise Emergency Action Level Scheme: Emergency Action Level Matrix, Hot Conditions (Attachment 5) | |
ML17095A121 | 31 March 2017 | License Amendment Request to Revise Emergency Action Level Scheme: Emergency Action Level Matrix, Cold Conditions (Attachment 5) | |
ML17095A112 | 31 March 2017 | License Amendment Request to Revise Emergency Action Level Scheme: Attach. 1, EAL Comparison Matrix Document (Deviations & Differences) and Attachments 2 & 3, Red-Line & Clean Versions of EAL Technical Bases Document | Safe Shutdown Time of Discovery High winds Reactor Vessel Water Level Ultimate heat sink Offsite Dose Calculation Manual Fire Barrier Safe Shutdown Earthquake Post Accident Monitoring Hydrostatic Probabilistic Risk Assessment Operating Basis Earthquake Operator Manual Action Design basis earthquake Spent Fuel Pool Instrumentation Severe Accident Management Guideline Safeguards Contingency Plan Battery sizing Earthquake Fuel cladding Pressure Boundary Leakage Fire Protection Program Grace period Backfit Unidentified leakage Failure to Scram |
L-MT-17-010, License Amendment Request: Revision to Emergency Plan Staff Augmentation Response Times | 24 March 2017 | License Amendment Request: Revision to Emergency Plan Staff Augmentation Response Times | Severe Accident Management Guideline Fuel cladding Minimum staff Fire Protection Program |
ML16125A435 | 3 May 2016 | Ltr. 05/03/16 Monticello Nuclear Generating Plant - Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection (Mxg) | |
L-MT-16-021, Changes to the Emergency Plan, Revision 47 | 29 April 2016 | Changes to the Emergency Plan, Revision 47 | Safe Shutdown Health Physics Network Reactor Vessel Water Level High Radiation Area Design basis earthquake Severe Accident Management Guideline Earthquake Fuel cladding Pressure Boundary Leakage |
L-MT-16-011, Changes to the Emergency Plan, Including Revision 19 to Emergency Preparedness Training Program Description | 25 February 2016 | Changes to the Emergency Plan, Including Revision 19 to Emergency Preparedness Training Program Description | Severe Accident Management Guideline |
ML13281A826 | 4 October 2013 | License Amendment Request: Change to the MNGP Emergency Plan to Remove the Radwaste Operator as a 60 Minute Responder | Severe Accident Management Guideline Fuel cladding |
L-MT-12-078, License Amendment Request: Modification to the MNGP Emergency Plan Concerning a Revision to the Emergency Action Level Setpoint for the Turbine Building Normal Waste Sump Monitor | 21 December 2012 | License Amendment Request: Modification to the MNGP Emergency Plan Concerning a Revision to the Emergency Action Level Setpoint for the Turbine Building Normal Waste Sump Monitor | Safe Shutdown Offsite Dose Calculation Manual Fuel cladding |
L-MT-12-095, Emergency Preparedness (EP) Communications Assessment Requested by NRC Letter, Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Fo | 29 October 2012 | Emergency Preparedness (EP) Communications Assessment Requested by NRC Letter, Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force | FLEX Fukushima Dai-Ichi |
L-HU-07-021, Units 1 and 2, Request for Approval of a Combined Nuclear Management Company Emergency Plan | 7 August 2007 | Units 1 and 2, Request for Approval of a Combined Nuclear Management Company Emergency Plan | Safe Shutdown Health Physics Network Offsite Dose Calculation Manual Emergency Lighting Design basis earthquake Severe Accident Management Guideline Earthquake |
ML040990086 | 2 April 2004 | Rev. 25 to Monticello Emergency Plan | |