L-MT-17-080, Submittal of Changes to the Monticello Nuclear Generating Plant (MNGP) Emergency Plan

From kanterella
Jump to navigation Jump to search
Submittal of Changes to the Monticello Nuclear Generating Plant (MNGP) Emergency Plan
ML17340A962
Person / Time
Site: Monticello  Xcel Energy icon.png
Issue date: 12/06/2017
From: Church C
Northern States Power Company, Minnesota, Xcel Energy
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
Shared Package
ML17345A005 List:
References
L-MT-17-080
Download: ML17340A962 (1)


Text

2807 West County Road 75 Monticello, MN 55362 800.895.4999 (l Xcel Energy*

xcelenergy.com RESPONSIBLE BY NATURE41>

December 6, 2017 L-MT-17-080 10CFR 50.54(q)(5) 10CFR 72.44(f)

ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Monticello Nuclear Generating Plant Docket 50-263 Renewed Facility Operating License No. DPR-22 Independent Spent Fuel Storage Installation Docket No. 72-58 Changes to the Monticello Nuclear Generating Plant (MNGP) Emergency Plan Pursuant to 10CFR 50.54(q)(5) and 10CFR 72.44(f), Northern States Power Company, a Minnesota corporation (NSPM), doing business as Xcel Energy, submits a summary of changes to the Monticello Emergency Plan as Enclosure 1. The new revisions to the Emergency Plan documents are provided in . The changes have been reviewed and do not result in a reduction in the effectiveness of the Emergency Plan.

Summary of Commitments commitments and no revisions to existing commitments in this letter.

IGtJ-S'"'votr f2r C. (kar~

Christophe urch Site Vice e ide t, Monticello Nuclear Generating Plant Northern Sta es Power Company- Minnesota Enclosures (2) cc: Emergency Response Coordinator, Region Ill, USNRC (with Enclosures)

Resident Inspector, MNGP, USNRC (with Enclosure 1)

Administrator, Region Ill, USNRC (w/o Enclosures)

Chief, Plant Support Branch, Division of Reactor Safety, Region Ill, USNRC (with Enclosure 1)

Director, Division of Spent Fuel Management, Office of Nuclear Material Safety and Safeguards (with Enclosure 1)