Issue date | Title | Topic | |
---|---|---|---|
ML24011A100 | 10 January 2024 | March 2024 Emergency Preparedness Program Inspection - Request for Information | |
ML23334A161 | 30 November 2023 | NRR E-mail Capture - Palo Verde 1, 2, and 3 - RAIs Associated with License Renewal Commitment for Pressurizer Surge Line Welds Inspection Program to Manage Environmentally Assisted Fatigue | Aging Management License Renewal |
ML23334A007 | 29 November 2023 | NRR E-mail Capture - Palo Verde 1, 2, and 3 - Official RAIs for LAR That Revises TSs 3.5.1, SITs - Operating; 3.5.2, SIT Shutdown; 3.6.5, Containment Air Temperature; and SRs for TS 3.5.1, SITs Operating | |
ML23298A123 | 25 October 2023 | NRR E-mail Capture - Palo Verde, Unit 1 - RAIs for Relief Request 70, Proposed Alternatives for Pressurizer Lower Shell Temperature Nozzle | |
ML23243B008 | 31 August 2023 | NRR E-mail Capture - Action: Opportunity to Review and Comment on a New NRC Information Collection, 10 CFR Part 50.55a, Codes and Standards (3150-XXXX) | |
ML23233A013 | 18 August 2023 | NRR E-mail Capture - Palo Verde 1, 2, and 3 - Acceptance Review of License Renewal Commitment for Pressurizer Surge Line Welds Inspection Program to Manage Environmentally Assisted Fatigue | |
ML23220A051 | 3 August 2023 | NRR E-mail Capture - Re Palo Verde 1, 2, and 3 - SUNSI Review of UFSAR, Rev. 22 | |
ML23202A016 | 20 July 2023 | NRR E-mail Capture - Palo Verde 1, 2, and 3 - Acceptance Review of LAR to Revise TSs 3.5.1, SITs - Operating; 3.5.2, SIT Shutdown; 3.6.5, Containment Air Temperature; and SRs for TS 3.5.1, SITs Operating | |
ML23143A133 | 23 May 2023 | NRR E-mail Capture - Palo Verde 1, 2, and 3 - Acceptance Review of LAR Revising TS 3.3.11 to Adopt TSTF-266-A, Rev. 3, Eliminate the Remote Shutdown System Table of Instrumentation and Controls | |
ML23130A013 | 10 May 2023 | NRR E-mail Capture - Palo Verde 1, 2, and 3 - Acceptance Review for Authorized Use of Mururoa Supplied Air Suits (Models V4F1 and MTH2) Pursuant to 10 CFR 20.1703 and 10 CFR 20.1705 | Mururoa |
ML23017A093 | 17 January 2023 | NRR E-mail Capture - Palo Verde - Acceptance of License Amendment Request Regarding Adoption of TSTF-107, Separate Control Rods That Are Untrippable Versus Inoperable (L-2022-LLA-0181) | |
ML23013A063 | 13 January 2023 | NRR E-mail Capture - Palo Verde Unit 1 -Request for Additional Information - U1R23 Inspection Summary Report for Steam Generator Tubing | |
ML22348A167 | 14 December 2022 | March 2023 Emergency Preparedness Exercise Inspection - Request for Information | |
ML22339A237 | 5 December 2022 | NRR E-mail Capture - Palo Verde Unit 1 Request for Additional Information - U1R23 Inspection Summary Report for Steam Generator Tubing | |
ML22173A068 | 17 June 2022 | Email Concurrence on SE Input for Columbia Pltr LAR | |
ML22167A187 | 16 June 2022 | NRR E-mail Capture - Palo Verde 1, 2, and 3 - Revised Acceptance Review of LAR to Adopt TSTF-567, Add Containment Sump TS to Address GSI-191 Issues | |
ML22136A092 | 16 May 2022 | NRR E-mail Capture - Palo Verde 1, 2, and 3 - Acceptance Review of LAR to Adopt TSTF-487-A, Revision 1, Relocate DNB Parameters to the COLR | |
ML22075A190 | 16 March 2022 | NRR E-mail Capture - Palo Verde 1, 2, and 3 - Acceptance Review of LAR to Adopt TSTF-567, Add Containment Sump TS to Address GSI-191 Issues | |
ML22055A584 | 24 February 2022 | NRR E-mail Capture - Palo Verde, Unit 3 - Final RAIs for 22nd Refueling Outage (Spring 2021) Steam Generator Tube Inservice Inspection Report | |
ML22034A013 | 2 February 2022 | NRR E-mail Capture - Palo Verde, Unit 2 - Verbal Approval of RR-69 to Extend Containment Tendon Inspection from 2/8/22 to 6/8/22 | Pandemic COVID-19 |
ML22032A031 | 31 January 2022 | NRR E-mail Capture - Palo Verde 1, 2, and 3 - Acceptance Review for an Exemption Regarding Elimination of Dafas Using RIPE Process | Exemption Request |
ML22025A401 | 3 January 2022 | March 2022 Emergency Preparedness Program Inspection - Request for Information | |
ML21333A198 | 19 November 2021 | NRC Review of PVNGS Training Needs Analysis and Training Required by Condition I of the Confirmatory Order EA-20-054 | |
ML21306A188 | 18 October 2021 | NRR E-mail Capture - Palo Verde 1, 2, and 3 - Second Pre-submittal Meeting for the Proposed Exemption to Eliminate Dafas Using RIPE Process | Probabilistic Risk Assessment Operator Manual Action Exemption Request |
ML21272A059 | 28 September 2021 | NRR E-mail Capture - Palo Verde 1, 2, and 3 - SUNSI Review of UFSAR, Rev. 21 | |
ML21264A135 | 17 September 2021 | NRR E-mail Capture - Palo Verde 1, 2 and 3 - Acceptance Review of LAR Associated with Permanent Extension of Containment ILRT Frequency to 15 Years (Type a) and CIV Leak Rate Test Frequency to 75 Months (Type C) | |
ML21237A076 | 25 August 2021 | NRR E-mail Capture - Palo Verde 1, 2, and 3 - Acceptance Review of RR-67, Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection | |
ML21228A008 | 16 August 2021 | NRR E-mail Capture - Palo Verde 1, 2, and 3 - Acceptance Review of an LAR for Administrative Changes to Technical Specifications | |
ML21228A104 | 12 August 2021 | RR-67, Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (EPID L-2021-LLR-0050) (Email) | Coronavirus |
ML21237A517 | 10 August 2021 | Email to PV Licensee and Palo Verde Nuclear Generating Station, Units 1, 2 and 3 - Notification of Inspection of the Licensees Implementation Industry Initiative Associated with the Open Phase Condition (NRC Bulletin 2012-01) and Request Fo | Open Phase Condition Time Critical Operator Action Coronavirus |
ML21160A144 | 9 June 2021 | NRR E-mail Capture - Palo Verde 1 and, 2 - Acceptance Review for Order Approving Transfers of Control of Licenses for Minority Interests Subject to Expiring Leases | |
ML21154A008 | 26 May 2021 | NRR E-mail Capture - Palo Verde 1, 2 and 3 - Official RAIs for LAR Associated with Permanent Extension of Containment ILRT Frequency to 15 Years (Type a) and CIV Leak Rate Test Frequency to 75 Months (Type C) | Incorporated by reference |
ML21146A334 | 14 May 2021 | ISFSI - Final Package for an Order Associated with Indirect Transfers of Control of Licenses from Pnm to Avangrid | |
ML21132A237 | 12 May 2021 | NRR E-mail Capture - Palo Verde 1, 2, and 3, and ISFSI - Final Package for an Order Associated with Indirect Transfers of Control of Licenses from Pnm to Avangrid | |
ML21103A363 | 13 April 2021 | NRR E-mail Capture - Palo Verde 1, 2, and 3 - Acceptance Review for Indirect Transfer of Control of Licenses Pursuant to 10 CFR 50.80 and 10 CFR 72.50 | |
ML21091A026 | 31 March 2021 | E-mail for Approval of Proprietary Withholding for Magnastor Amendment 9 Submittal and RAI Response | |
ML21064A237 | 3 March 2021 | ISI Request for Information Rls | Boric Acid Nondestructive Examination Pandemic Scaffolding |
ML21053A026 | 22 February 2021 | NRR E-mail Capture - Palo Verde 1, 2 and 3 - Acceptance Review of LAR Associated with Permanent Extension of Containment ILRT Frequency to 15 Years (Type a) and CIV Leak Rate Test Frequency to 75 Months (Type C) | |
ML21043A146 | 11 February 2021 | NRR E-mail Capture - Palo Verde 1, 2, and 3 - Official RAI for an Order Associated with Indirect License Transfer from Public Service Company of New Mexico to Avangrid, Inc | |
ML21023A021 | 13 January 2021 | PVNGS PI&R Request for Information RA | Temporary Modification Pandemic |
ML20366A168 | 31 December 2020 | NRR E-mail Capture - Palo Verde 1, 2, and 3, and ISFSI - Acceptance Review of an Order Associated with Indirect Transfers of Control of Licenses | |
ML21005A271 | 29 December 2020 | 102-08208 PVNGS Communication Required by Confirmatory Order EA-20-054 | Finite Element Analysis COVID-19 |
ML20325A039 | 19 November 2020 | NRR E-mail Capture - Palo Verde 2 - Verbal Authorization of RR 66 to Extend Containment Tendon Inspection by One Year Based on 10 CFR 50.55a(Z)(2) | Pandemic COVID-19 |
ML20316A016 | 9 November 2020 | NRR E-mail Capture - Palo Verde 2 - Acceptance Review of RR 66, Request Containment Post-Tensioning System Inspection One-Time by One Year Due to COVID-19 Pandemic | Pandemic COVID-19 |
ML20295A491 | 21 October 2020 | NRR E-mail Capture - Palo Verde 1, 2, and 3 - Acceptance Review of LAR Associated with Adopting TSTF-501, Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control | |
ML20265A098 | 21 September 2020 | NRR E-mail Capture - Palo Verde 1, 2, and 3 - Acceptance Review of License Amendment Associated with Making Necessary Administrative Changes to Technical Specifications | |
ML20177A379 | 23 June 2020 | Email from L. Cox, North Carolina Department of Health and Human Services to NRC Regarding Exemption Request for Duke Energy'S McGuire Nuclear Station | Exemption Request COVID-19 |
ML20108E946 | 16 April 2020 | NRR E-mail Capture - (External_Sender) Clarification to PVNGS Part 26 Exemption Request (ML20105A481) | Exemption Request Pandemic COVID-19 |
ML20091K075 | 31 March 2020 | NRR E-mail Capture - Palo Verde 2 - Acceptance Review of RR 65, Request for Relief from RPV Bottom Mounted Instrumentation Nozzles and a Pressurizer Surge Line Weld Overlay Examination | Weld Overlay Pandemic COVID-19 |