ML24011A10010 January 2024March 2024 Emergency Preparedness Program Inspection - Request for Information
ML23334A16130 November 2023NRR E-mail Capture - Palo Verde 1, 2, and 3 - RAIs Associated with License Renewal Commitment for Pressurizer Surge Line Welds Inspection Program to Manage Environmentally Assisted FatigueAging Management
License Renewal
ML23334A00729 November 2023NRR E-mail Capture - Palo Verde 1, 2, and 3 - Official RAIs for LAR That Revises TSs 3.5.1, SITs - Operating; 3.5.2, SIT Shutdown; 3.6.5, Containment Air Temperature; and SRs for TS 3.5.1, SITs Operating
ML23298A12325 October 2023NRR E-mail Capture - Palo Verde, Unit 1 - RAIs for Relief Request 70, Proposed Alternatives for Pressurizer Lower Shell Temperature Nozzle
ML23243B00831 August 2023NRR E-mail Capture - Action: Opportunity to Review and Comment on a New NRC Information Collection, 10 CFR Part 50.55a, Codes and Standards (3150-XXXX)
ML23233A01318 August 2023NRR E-mail Capture - Palo Verde 1, 2, and 3 - Acceptance Review of License Renewal Commitment for Pressurizer Surge Line Welds Inspection Program to Manage Environmentally Assisted Fatigue
ML23220A0513 August 2023NRR E-mail Capture - Re Palo Verde 1, 2, and 3 - SUNSI Review of UFSAR, Rev. 22
ML23202A01620 July 2023NRR E-mail Capture - Palo Verde 1, 2, and 3 - Acceptance Review of LAR to Revise TSs 3.5.1, SITs - Operating; 3.5.2, SIT Shutdown; 3.6.5, Containment Air Temperature; and SRs for TS 3.5.1, SITs Operating
ML23143A13323 May 2023NRR E-mail Capture - Palo Verde 1, 2, and 3 - Acceptance Review of LAR Revising TS 3.3.11 to Adopt TSTF-266-A, Rev. 3, Eliminate the Remote Shutdown System Table of Instrumentation and Controls
ML23130A01310 May 2023NRR E-mail Capture - Palo Verde 1, 2, and 3 - Acceptance Review for Authorized Use of Mururoa Supplied Air Suits (Models V4F1 and MTH2) Pursuant to 10 CFR 20.1703 and 10 CFR 20.1705Mururoa
ML23017A09317 January 2023NRR E-mail Capture - Palo Verde - Acceptance of License Amendment Request Regarding Adoption of TSTF-107, Separate Control Rods That Are Untrippable Versus Inoperable (L-2022-LLA-0181)
ML23013A06313 January 2023NRR E-mail Capture - Palo Verde Unit 1 -Request for Additional Information - U1R23 Inspection Summary Report for Steam Generator Tubing
ML22348A16714 December 2022March 2023 Emergency Preparedness Exercise Inspection - Request for Information
ML22339A2375 December 2022NRR E-mail Capture - Palo Verde Unit 1 Request for Additional Information - U1R23 Inspection Summary Report for Steam Generator Tubing
ML22173A06817 June 2022Email Concurrence on SE Input for Columbia Pltr LAR
ML22167A18716 June 2022NRR E-mail Capture - Palo Verde 1, 2, and 3 - Revised Acceptance Review of LAR to Adopt TSTF-567, Add Containment Sump TS to Address GSI-191 Issues
ML22136A09216 May 2022NRR E-mail Capture - Palo Verde 1, 2, and 3 - Acceptance Review of LAR to Adopt TSTF-487-A, Revision 1, Relocate DNB Parameters to the COLR
ML22075A19016 March 2022NRR E-mail Capture - Palo Verde 1, 2, and 3 - Acceptance Review of LAR to Adopt TSTF-567, Add Containment Sump TS to Address GSI-191 Issues
ML22055A58424 February 2022NRR E-mail Capture - Palo Verde, Unit 3 - Final RAIs for 22nd Refueling Outage (Spring 2021) Steam Generator Tube Inservice Inspection Report
ML22034A0132 February 2022NRR E-mail Capture - Palo Verde, Unit 2 - Verbal Approval of RR-69 to Extend Containment Tendon Inspection from 2/8/22 to 6/8/22Pandemic
COVID-19
ML22032A03131 January 2022NRR E-mail Capture - Palo Verde 1, 2, and 3 - Acceptance Review for an Exemption Regarding Elimination of Dafas Using RIPE ProcessExemption Request
ML22025A4013 January 2022March 2022 Emergency Preparedness Program Inspection - Request for Information
ML21333A19819 November 2021NRC Review of PVNGS Training Needs Analysis and Training Required by Condition I of the Confirmatory Order EA-20-054
ML21306A18818 October 2021NRR E-mail Capture - Palo Verde 1, 2, and 3 - Second Pre-submittal Meeting for the Proposed Exemption to Eliminate Dafas Using RIPE ProcessProbabilistic Risk Assessment
Operator Manual Action
Exemption Request
ML21272A05928 September 2021NRR E-mail Capture - Palo Verde 1, 2, and 3 - SUNSI Review of UFSAR, Rev. 21
ML21264A13517 September 2021NRR E-mail Capture - Palo Verde 1, 2 and 3 - Acceptance Review of LAR Associated with Permanent Extension of Containment ILRT Frequency to 15 Years (Type a) and CIV Leak Rate Test Frequency to 75 Months (Type C)
ML21237A07625 August 2021NRR E-mail Capture - Palo Verde 1, 2, and 3 - Acceptance Review of RR-67, Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection
ML21228A00816 August 2021NRR E-mail Capture - Palo Verde 1, 2, and 3 - Acceptance Review of an LAR for Administrative Changes to Technical Specifications
ML21228A10412 August 2021RR-67, Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (EPID L-2021-LLR-0050) (Email)Coronavirus
ML21237A51710 August 2021Email to PV Licensee and Palo Verde Nuclear Generating Station, Units 1, 2 and 3 - Notification of Inspection of the Licensees Implementation Industry Initiative Associated with the Open Phase Condition (NRC Bulletin 2012-01) and Request FoOpen Phase Condition
Time Critical Operator Action
Coronavirus
ML21160A1449 June 2021NRR E-mail Capture - Palo Verde 1 and, 2 - Acceptance Review for Order Approving Transfers of Control of Licenses for Minority Interests Subject to Expiring Leases
ML21154A00826 May 2021NRR E-mail Capture - Palo Verde 1, 2 and 3 - Official RAIs for LAR Associated with Permanent Extension of Containment ILRT Frequency to 15 Years (Type a) and CIV Leak Rate Test Frequency to 75 Months (Type C)Incorporated by reference
ML21146A33414 May 2021ISFSI - Final Package for an Order Associated with Indirect Transfers of Control of Licenses from Pnm to Avangrid
ML21132A23712 May 2021NRR E-mail Capture - Palo Verde 1, 2, and 3, and ISFSI - Final Package for an Order Associated with Indirect Transfers of Control of Licenses from Pnm to Avangrid
ML21103A36313 April 2021NRR E-mail Capture - Palo Verde 1, 2, and 3 - Acceptance Review for Indirect Transfer of Control of Licenses Pursuant to 10 CFR 50.80 and 10 CFR 72.50
ML21091A02631 March 2021E-mail for Approval of Proprietary Withholding for Magnastor Amendment 9 Submittal and RAI Response
ML21064A2373 March 2021ISI Request for Information RlsBoric Acid
Nondestructive Examination
Pandemic
Scaffolding
ML21053A02622 February 2021NRR E-mail Capture - Palo Verde 1, 2 and 3 - Acceptance Review of LAR Associated with Permanent Extension of Containment ILRT Frequency to 15 Years (Type a) and CIV Leak Rate Test Frequency to 75 Months (Type C)
ML21043A14611 February 2021NRR E-mail Capture - Palo Verde 1, 2, and 3 - Official RAI for an Order Associated with Indirect License Transfer from Public Service Company of New Mexico to Avangrid, Inc
ML21023A02113 January 2021PVNGS PI&R Request for Information RATemporary Modification
Pandemic
ML20366A16831 December 2020NRR E-mail Capture - Palo Verde 1, 2, and 3, and ISFSI - Acceptance Review of an Order Associated with Indirect Transfers of Control of Licenses
ML21005A27129 December 2020102-08208 PVNGS Communication Required by Confirmatory Order EA-20-054Finite Element Analysis
COVID-19
ML20325A03919 November 2020NRR E-mail Capture - Palo Verde 2 - Verbal Authorization of RR 66 to Extend Containment Tendon Inspection by One Year Based on 10 CFR 50.55a(Z)(2)Pandemic
COVID-19
ML20316A0169 November 2020NRR E-mail Capture - Palo Verde 2 - Acceptance Review of RR 66, Request Containment Post-Tensioning System Inspection One-Time by One Year Due to COVID-19 PandemicPandemic
COVID-19
ML20295A49121 October 2020NRR E-mail Capture - Palo Verde 1, 2, and 3 - Acceptance Review of LAR Associated with Adopting TSTF-501, Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control
ML20265A09821 September 2020NRR E-mail Capture - Palo Verde 1, 2, and 3 - Acceptance Review of License Amendment Associated with Making Necessary Administrative Changes to Technical Specifications
ML20177A37923 June 2020Email from L. Cox, North Carolina Department of Health and Human Services to NRC Regarding Exemption Request for Duke Energy'S McGuire Nuclear StationExemption Request
COVID-19
ML20108E94616 April 2020NRR E-mail Capture - (External_Sender) Clarification to PVNGS Part 26 Exemption Request (ML20105A481)Exemption Request
Pandemic
COVID-19
ML20091K07531 March 2020NRR E-mail Capture - Palo Verde 2 - Acceptance Review of RR 65, Request for Relief from RPV Bottom Mounted Instrumentation Nozzles and a Pressurizer Surge Line Weld Overlay ExaminationWeld Overlay
Pandemic
COVID-19