 Issue dateTitleTopic
ML24032A02031 January 2024NPDES Biocide/Corrosion Treatment Plan Annual Report, Cy 2023
ML24022A25922 January 2024NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Unit 1, License Amendment Request to Revise TS LCO 3.8.2 to Remove Note C-S Diesel Generator
ML24016A07616 January 2024NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2 - License Amendment Request to Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications
ML23355A22021 December 2023Radiation Protection Inspection - Inspection Report 2024-01Process Control Program
ML23347A06413 December 202312-13-23 Email from Kimberly Green to Wells, Russell, Subject: Results of NRC SUNSI Review of Watts Bar Nuclear Plant Dual-Unit UFSAR, Amendment 5
ML23334A09328 November 2023NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise TS Surveillance Requirement 3.9.5.1 to Reduce RHR Flow Rate During Mode 6
ML23332A00427 November 2023NRR E-mail Capture - Request for Additional Information Related to Proposed Revised Alternative 0-ISI-47EVT-1
ML23319A1662 November 2023NRR E-mail Capture - Acceptance Review Results for Browns Ferry Nuclear Plant, Sequoyah Nuclear Plant, and Watts Bar Nuclear Plant, Exemption Request Related to 10 CFR 37.11(c)(2)Exemption Request
ML23275A02729 September 2023Submittal of Discharge Monitoring Report (DMR) Quality Assurance Study 43 Final Report 2023
ML23254A28711 September 2023NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise TS Table 1.1-1 Re Number of Required Rvh Closure Bolts
ML23243A98929 August 2023Inspection Information RequestCondition Adverse to Quality
ML23236A25624 August 2023NRR E-mail Capture - Acceptance Review Results for the Sequoyah and Watts Bar License Amendment Request to Adopt TSTF-567 (L-2023-LLA-0106)
ML23208A08726 July 2023NRR E-mail Capture - Acceptance Review Results for Browns Ferry 1, 2, and 3, Alternative Request 0-ISI-47 to Use an Alternative to ASME Code, Section XI, Examination Requirements for Examination Categories B-N-1 and B-N-2
ML23191A86710 July 2023NRR E-mail Capture - Acceptance Review Results for Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control
ML23166A11415 June 2023Document Request for Watts Bar Nuclear Plant - Radiation Protection Inspection - Inspection Report 2023-03Offsite Dose Calculation Manual
ML23165A28614 June 2023Tennessee Multi-Sector Permit (Tmsp), 2023 Annual Discharge Monitoring Report for Outfalls SW-1, SW-16, SW-17, SW-18, SW-19, and SW-21
ML23150A24725 May 2023NRR E-mail Capture - Audit Plan Related to Review of the Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Increase the Number of Tritium Producing Burnable Absorber RodsPressure and Temperature Limits Report
ML23124A0083 May 2023NRR E-mail Capture - Request for Additional Information Related to Proposed Alternative Requests for the 5th 10-Year Inservice Testing Interval for Browns Ferry Nuclear Plant, Units 1, 2, and 3Incorporated by reference
Surveillance Frequency Control Program
ML23117A07026 April 2023NRR E-mail Capture - Acceptance Review Results for Browns Ferry, 1, 2, and 3, License Amendment Request to Revise Tech Specs Surveillance Requirements 3.4.3.2 and 3.5.1.11 Safety Relief Valves (BFN TS-540)
ML23116A14921 April 2023NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Increase the Number of Tritium Producing Burnable Absorber RodsPressure and Temperature Limits Report
ML23097A0176 April 2023NRR E-mail Capture - Acceptance Review Results for Browns Ferry, Units 1, 2, and 3, License Amendment Request to Adopt TSTF-566-A and TSTF-580-A, Revision 1
ML23075A00313 March 2023NRR E-mail Capture - Acceptance Review Results for Watts Bar, Units 1, 2, and 3, License Amendment Request to Revise TS 3.7.11, Required Actions A.1 and E.1 Footnotes Re Date for the Modification
ML23075A05010 March 2023TVA Intentions on EA-22-122 - Choice Letter Response Email Message and TVA Intentions on EA-22-122 - Choice Letter Response Email Message -- NRC Acknowledgement
ML23073A20710 March 2023TVA Intentions on EA-22-122 - Choice Letter Response Email Message - NRC Acknowledgement
ML23073A20810 March 2023TVA Intentions on EA-22-122 - Choice Letter Response Email Message
ML23072A07210 March 2023NRR E-mail Capture - (External_Sender) State Consultation - Sequoyah Nuclear Plant, Units 1 and 2; and Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.4.12 (L-2022-LLA-0103)
ML23067A2378 March 2023WB_2023-02_RP_inspection_doc_requestOffsite Dose Calculation Manual
ML23058A13127 February 2023FW: TVA Intentions on EA-22-129
ML23062A59527 February 2023Staff follow-up Questions to Tva'S 12/19/2022 Response of the Staff'S Rsi Regarding 08/04/2022 SQN Exemption RequestExemption Request
ML23052A07921 February 2023NRR E-mail Capture - Acceptance Review for Browns Ferry and Sequoyah License Amendment Request to Adopt TSTF-541
ML23046A35515 February 2023Annual Water Withdrawal Report 2022
ML23041A0029 February 2023NRR E-mail Capture - Request for Additional Information Related to TVA Alternative Request BFN-0-ISI-32 (CNL-22-025)VT-2
Incorporated by reference
ML23019A34419 January 2023Tennessee Multi-Sector Permit (Tmsp), 2022 Annual Discharge Monitoring Report for Outfalls SW-1, SW-16, and SW-19
ML23013A15113 January 2023NRR E-mail Capture - Acceptance Review Results for Browns Ferry Nuclear Plant, Units 1, 2, and 3, Request to Use Later ASME OM Code Edition and Alternative Requests BFN-IST-01 Through BFN-IST-05Incorporated by reference
ML23026A02812 January 2023001 Radiation Safety Baseline Inspection Information RequestProcess Control Program
Coronavirus
ML23017A00612 January 2023Initial Information Request Inspection Report: 2023001Offsite Dose Calculation Manual
ML23013A03812 January 2023NRR E-mail Capture - (External_Sender) State Consultation for Alabama - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-529, Revision 4 (L-2022-LLA-0088)
ML23013A03612 January 2023NRR E-mail Capture - (External_Sender) State Consultation for Alabama - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-554-A, Revision 1 (L-2022-LLA-0100)Pressure Boundary Leakage
ML23004A0354 January 2023NRR E-mail Capture - Acceptance Review Results for Browns Ferry, Units 1, 2, and 3, License Amendment Request to Delete TS 3.6.3.1 by Adopting TSTF-478
ML22356A29822 December 2022Email Response to Letter, Dated November 22, 2022 Regarding Watts Bar Integrated Inspection Report
ML22353A08115 December 2022NRR E-mail Capture - Acceptance Review Results for Watts Bar, Unit 2, Alternative Request WBN-2-ISI-01 Regarding Examination of Upper Head Injection Nozzle Dissimilar Metal Piping Butt Welds
ML22348A09714 December 2022NRR E-mail Capture - State Consultation - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-529, Revision 4 (L-2022-LLA-0088)
ML22348A04413 December 2022NRR E-mail Capture - State Consultation - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-554-A, Revision 1 (L-2022-LLA-0100)Pressure Boundary Leakage
ML22343A0698 December 2022NRR E-mail Capture - Request for Additional Information - Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.4.12 (L-2022-LLA-0103)Anticipated operational occurrence
ML22348A04328 November 2022NRR E-mail Capture - State Consultation - Sequoyah Nuclear Plant, Units 1 and 2, License Amendment Request to Modify the Approved 10 CFR 50.69 Categorization Process (L-2022-LLA-0033)Probabilistic Risk Assessment