Issue date | Title | Topic | |
---|---|---|---|
ML19317D093 | 25 October 2019 | Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10 CFR21-0127, Rev. 0, Emd Fuel Injectors - Seized Plunger and Bushing | |
ML17194A825 | 11 July 2017 | Part 21 Report Re Wedge Pin Failure in Anchor Darling Motor Operated Double Disc Gate Valves with Threaded Stem to Upper Wedge Connections | Anchor Darling |
ML17026A414 | 20 January 2017 | C&D Technologies, Inc. - Part 21 - Plastic Jar Dedication Sampling | |
ML15103A244 | 6 April 2015 | Part 21 Report - Deviation of Hk Circuit Breaker Close Latch Spring | Commercial Grade Dedication |
ML14274A052 | 22 September 2014 | Final Report 10CFR Part 21 Evaluation Regarding Misaligned Separators in LCR-25 Standby Batteries, Revision 1 - Original Letter Did Not Include the List of Affected Utilities | |
ML14113A398 | 17 April 2014 | Part 21 - Bearing Defect | Overspeed |
ML14303A526 | 28 March 2014 | Interim Part 21 Report - Misaligned Separators in LCR-25 Standby Batteries | |
ML14079A353 | 17 March 2014 | Notification of Part 21 Re Bearing Defect | |
ML14042A202 | 5 February 2014 | Part 21 Report Regarding Unqualified Material Used in Electrical Penetration Assemblies | Stress corrosion cracking |
ML13277A010 | 23 September 2013 | Interim Report Update for Component ASME Material Supplied by Mirion Technologies (Conax Nuclear), Inc. (Mtcn), as Part of Containment Electric Penetration Assemblies (EPA) | Stress corrosion cracking |
ML13246A084 | 23 August 2013 | Notification of Potential Defect & Interim Report Regarding a Potential Defect of Materials Supplied to Operating Us Nuclear Power Plants by Mirion Technologies (Conax Nuclear) Inc. (Mtcn) with Containment Electric Penetration Assemblies | |
ML13238A253 | 21 August 2013 | Notification of Potential Part 21 Report - Foxboro Power Supply Potential Failures Due to Defective the Wraps and Holders | |
ML13165A342 | 12 June 2013 | 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers | |
ML13093A153 | 2 April 2013 | Part 21 Report - Foxboro Power Supply Potential Failures Due to Defective Tie Wraps and Holders | |
ML13064A012 | 25 February 2013 | Notification of Potential Part 21 Report Re Wedge Pin Failure of an Anchor/Darling Double-Disc Gate Valve | Anchor Darling |
ML13029A498 | 18 January 2013 | Notification of Part 21 Report Re Belden Epdm Lead Wire Used in Rewind of Environmentally Qualified (EQ) Form-wound Motors Is Not Fully Qualified | |
ML13002A029 | 21 December 2012 | Tennessee Valley Authority, Part 21 Report - Belden Wire Used on Environmentally Qualified Form-Wound Motors Not Fully Qualified | |
ML12348A136 | 13 December 2012 | Part 21 60-Day Interim Report Notification: Adequacy of Design Change in Am Magne-Blast Circuit Breakers | |
ML12352A123 | 13 December 2012 | 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers | |
ML12283A246 | 28 September 2012 | Part 21 - Fairbanks Morse Opposed Piston EDG Oil Pump Leak | Hydrostatic Commercial Grade |
3F0812-05, Interim Report of the Evaluation of a Deviation Pursuant to 10 CFR 21.21(a)(2) | 21 August 2012 | Interim Report of the Evaluation of a Deviation Pursuant to 10 CFR 21.21(a)(2) | Mission time |
ML12123A089 | 27 April 2012 | Abb, Inc., Notification of Potential Part 21 Report - Hk Circuit Breaker Studs Failed to Meet Specification | |
ML12094A371 | 2 April 2012 | Part 21 Report - Rosemount Pressure Transmitters with Nonzero Based Calibrations | |
ML12066A118 | 2 March 2012 | Part 21 Report - Rosemount Pressure Transmitters with Nonzero Based Calibrations | |
ML12097A316 | 2 March 2012 | Part 21 Report - Rosemont Pressure Tranmitters Out of Tolerance Condition | |
ML12058A141 | 23 February 2012 | Part 21 Report - Rosemount Nuclear Instruments, Inc., Pressure Transmitter with Nonzero Based Calibrations | |
ML11186A904 | 30 June 2011 | Notification of Potential Part 21 Appendix R Analyses Fails to Recognize Hot-Short Failure Resulting in the Loss of an Essential Electrical Bus | Hot Short Safe Shutdown Unanalyzed Condition Fire Protection Program |
3F0411-04, Notification of Potential Deficiency Report Re - Interim Report of the Evaluation of a Deviation Pursuant to 10 CFR 21.21(A)(2) | 26 April 2011 | Notification of Potential Deficiency Report Re - Interim Report of the Evaluation of a Deviation Pursuant to 10 CFR 21.21(A)(2) | |
3F0909-05, 10 CFR 21 Report, Concerning Spare Safety-Related Limitorque Actuator Motor with Magnesium Rotor Purchased from Areva Np, Inc., in 2007 and Received in 2008 | 25 September 2009 | 10 CFR 21 Report, Concerning Spare Safety-Related Limitorque Actuator Motor with Magnesium Rotor Purchased from Areva Np, Inc., in 2007 and Received in 2008 | Commercial Grade |
ML090761188 | 11 March 2009 | Part 21 Notification - Defective Hk and K-Line Circuit Breaker Tension Springs | |
ML083190017 | 12 November 2008 | Notification of Potential Part 21 on All Dimensionally Verified Commercial Grade Items Processed Per Fisher Manufacture Procedure Fmp 2K28 | Commercial Grade |
ML082390106 | 25 August 2008 | Notification of Potential Part 21 on Failure of F and G Switches | Test box |
ML080990634 | 4 April 2008 | Part 21 Notification Regarding Failure to Comply with the Requirements for Dedication of Commercial Grade Items | Commercial Grade |
ML073200086 | 9 November 2007 | Notification of Potential Part 21 Report Conval Valves Weld Qualifications | Commercial Grade |
ML072750470 | 21 September 2007 | MPR Associates, Inc. - Report of Defect in Accordance with 10 CFR 21 | Commercial Grade Dedication |
ML071000229 | 6 April 2007 | Rosemount Nuclear Instruments, Inc., Submittal of Notification Under 10 CFR Part 21 for Certain Model 1152 Pressure Transmitters | Hydrostatic Loctite |
ML071370309 | 7 March 2007 | Velan, Inc., Piston Check Cv Information | |
ML062770224 | 27 September 2006 | Part 21 Report from Tyco Valves & Controls LP, Improper Valve Springs in Pressure Relief Valves | |
ML021510295 | 15 May 2002 | 10 CFR 21 Notification - Potential Defect Fan Assemblies for UPS Systems | |
ML021550249 | 10 May 2002 | Letter from W. G. Hampton Subject: 10CFR Part 21 Notification-Potenial Defect Involving Fan Assemblies Used in Forced Air Cooled Uninterruptible Power Supply Systems |