Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20217A169 | 22 September 1999 | Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers | |
ML20206H261 | 5 May 1999 | Part 21 Rept Re Defect Found in Potter & Brumfield Relays. Sixteen Relays Supplied in Lot 913501 by Vendor as Commercial Grade Items.Caused by Insufficient Contact Pad Welding.Relays Replaced with New Relays | |
ML18066A277 | 13 August 1998 | Part 21 Rept Re Deficiency in CE Current Screening Methodology for Determining Limiting Fuel Assembly for Detailed PWR thermal-hydraulic Sa.Evaluations Were Performed for Affected Plants to Determine Effect of Deficiency | |
ML20236N387 | 9 July 1998 | Part 21 Rept Re Deficiency Identified in Event 32725, Corrected by Mgp Instruments Inc.Licensee Verified,Affected Equipment Has Been Reworked & Tested at Sce.Design Mod Completed | |
ML18065B135 | 6 January 1998 | Part 21 Rept Re Use of Deltstrat Code for RCS Flow Rate Determination.Code Corrects for Temps to Determine Hot Leg Bulk Coolant Temp | |
LD-97-033, Part 21 Rept Re Defect in Potter & Brumfield Mdr Relays, Models 170-1 & 7032.Extended Problem to Include All Mdr Relay Models W/Date Codes 93XX-95XX.Root Cause Analysis, Written Rept & Recommended Corrective Actions Due by 971201 | 20 November 1997 | Part 21 Rept Re Defect in Potter & Brumfield Mdr Relays, Models 170-1 & 7032.Extended Problem to Include All Mdr Relay Models W/Date Codes 93XX-95XX.Root Cause Analysis, Written Rept & Recommended Corrective Actions Due by 971201 | |
LD-97-028, Part 21 Rept Re Contamination of Lubricant Which Has Led to Hardening of Lubricant in Certain Potter & Brumfield Mdr Relay Models 170-1 & 7032.Will Distribute Copy of Rept to Utils Having ABB-CE Designed Nuclear Steam Supply Sys | 13 October 1997 | Part 21 Rept Re Contamination of Lubricant Which Has Led to Hardening of Lubricant in Certain Potter & Brumfield Mdr Relay Models 170-1 & 7032.Will Distribute Copy of Rept to Utils Having ABB-CE Designed Nuclear Steam Supply Sys | |
ML20211M649 | 8 October 1997 | Addenda 1 to Part 21 Rept Re Weldments on Opposed Piston & Coltec-Pielstick Emergency stand-by Diesel gen-set lube-oil & Jacket Water Piping Sys.Revised List of Potentially Affected Utils to Include Asterisked Utils,Submitted | |
ML20211H791 | 30 September 1997 | Part 21 Rept Re Failure of Weldment Associated w/lube-oil Piping Sys on 970804 at Millstone,Unit 2.Root Cause Is Not Yet Known.Quality of Weldment Is Being Considered.Listed Util Sites Affected | |
LD-97-024, Part 21 Rept Re Error in Energy Redistribution Factor Used in LOCA Analysis for Listed Plants for Which ABB-CE Performed Analysis.Issued Recommendations Info Bulletin 97-004 | 14 August 1997 | Part 21 Rept Re Error in Energy Redistribution Factor Used in LOCA Analysis for Listed Plants for Which ABB-CE Performed Analysis.Issued Recommendations Info Bulletin 97-004 | |
ML20217H051 | 5 August 1997 | Part 21 Rept Re Discovery That Radiation Monitoring Sys Power Supply Circuit Board Subject to Premature Electronic Component Failure | |
ML20140G448 | 1 May 1997 | Part 21 Rept Re Potential Defect in Component of Dsrv & Dsr Enterprise Standby Diesel Generator Sys.Recommends That Springs Be Inspected on Periodic Basis,Such as During Refueling Outages | |
LD-97-002, Part 21 Rept Re Piping Line Loss Between SG & MSIV Inlet When MSSVs Area Activated.Recommends That Utils Confirm Proper Adjustment of MSSV Blowdown Settings So as to Preclude Valve Chatter & Related Structural Concerns | 17 January 1997 | Part 21 Rept Re Piping Line Loss Between SG & MSIV Inlet When MSSVs Area Activated.Recommends That Utils Confirm Proper Adjustment of MSSV Blowdown Settings So as to Preclude Valve Chatter & Related Structural Concerns | |
ML20132D809 | 18 December 1996 | Part 21 Rept Re Defect of Welds on Weld Nut Holding Filter Assembly Panel.Failure of Weld or Weld Nut Could Allow Filter Assembly Panel to Break Loose Under Seismic Stress & Cause Damage to Other Components in Charger | |
ML20132C075 | 13 December 1996 | Part 21 Rept Re Testing of Six HFD3045 & HFD3060 Molded Case Circuit Breakers w/125 Volt DC Shunt Trip Devices.Identified Incorrectly Installed DC Shunt Trip Units & Are in Process of Being Returned to Vendor | |
ML18065B011 | 18 October 1996 | Part 21 Rept Re Application of Certain Aspects of ABB-CE Safety Analysis Methodology | |
LD-96-009, Part 21 Rept Re Potential Instrumentation Decalibr at Low Power.Affected Utils Should Ensure That Log Power Channels Properly Calibr & cross-correlated to Linear Power Channels at 100% Reactor Power | 15 April 1996 | Part 21 Rept Re Potential Instrumentation Decalibr at Low Power.Affected Utils Should Ensure That Log Power Channels Properly Calibr & cross-correlated to Linear Power Channels at 100% Reactor Power | |
ML20086N998 | 21 July 1995 | Part 21 Rept Re Mdr Relays W/Potentially Damaged Internal Contact Arms | Commercial Grade Dedication |
ML20082D901 | 27 January 1995 | Final Part 21 Rept Re Valves Installed W/Shim Between Yoke & Adapter Plate Involved in Jan 1994 Incident.Caused by Operational Problems Involving Maint Procedures.Ltr Sent to Affected Utils.Item Not Reportable Under 10CFR21 | |
ML20080D592 | 28 December 1994 | Submits Followup to 940418 Part 21 Re Investigation W/ Respect to Jan 1994 Incident at Prairie Island Generating Plant Involving Crane Design Gate Valves | |
ML18038A897 | 7 September 1994 | Part 21 Rept Re Defect in Latching Mechanism of Potter & Brumfield Relay on C&D High Voltage Shut Down Alarm Assembly Printed Circuit Boards.Pull Test on Relay Reset Button Incorporated Into Receiving Insp Procedures | |
ML20072S958 | 30 August 1994 | Part 21 Rept Re Crane Design Gate Valves Involved in Jan 1994 Incident at Praire Island Nuclear Generating Plant. Historical Records Do Not Contain Info Addressing Total Number of Configuration Mfg by Crane | Weak link |
ML20065G467 | 1 April 1994 | Part 21 Rept Re Failure of Support Studs on Discharge Piping Bracket to Turbocharger That Provide Support for Air Inlet Housing | |
ML20059H772 | 17 January 1994 | Part 21 Rept Re Virginia Power Notifying Fairbands Morse Via Failure Analysis Rept NESML-Q-058 of Defective Air Start Distributor cam,16104412 | |
ML20059F263 | 7 January 1994 | Part 21 Rept Re Air Start Distributor Cam Mfg by Fairbanks Morse.Mfg Suggests That Site Referenced in Encl App I Inspect Air Start Distributor Cam as Soon as Practical | |
ML20058K384 | 9 December 1993 | Part 21 Rept Re Potential Defect in Component of Dsrv & Dsr Enterprise Standby DG Sys,Regarding Potential Problem W/ Subcover Assembled Atop Power Head | |
LD-93-139, Part 21 Rept Re Error in Input to Large Break LOCA Analysis. Paint Thickness Factor of Ten Larger than Intended Used for One of Walls in Containment.Caused by Wrong Value Transcribed & Used in LOCA Analysis | 24 September 1993 | Part 21 Rept Re Error in Input to Large Break LOCA Analysis. Paint Thickness Factor of Ten Larger than Intended Used for One of Walls in Containment.Caused by Wrong Value Transcribed & Used in LOCA Analysis | |
ML20056D707 | 15 July 1993 | Part 21 Rept Re Reportable defect-75 PSIG Relief Check Valve 1 Npt,Emd 9521844,Kepner 416C-1-75 | |
ML20128C397 | 28 January 1993 | Suppl to 921217 Final Part 21 Rept Re Defect on Cast Steel Cylinder Heads.One Addl Part (1A-7680) Discovered Which Was Supplied to Util.Copy of Rept Also Sent to Affected Util | |
ML20127H230 | 15 January 1993 | Part 21 Rept Re Potential Defeat in Component of Dsrv & Dsr Enterprise Standby DG Sys.Starting Air Distributor Housing Assemblies Installed as Replacement Parts at Listed Sites | |
ML20126J596 | 31 December 1992 | Part 21 Rept Re Potential Loss of RHR Cooling During Nozzle Dam Removal.Nozzle Dams May Create Trapped Air Column Behind Cold Leg Nozzle Dam.Mod to Nozzle Dams Currently Underway. Ltrs to Affected Utils Encl | Hydrostatic |
ML20126B042 | 17 December 1992 | Final Part 21 Rept Re Potential Problem W/Steel Cylinder Heads.Initially Reported on 921125.Caused by Inadequate Cast Wall Thickness at 3/4-inch-10 Bolt Hole.Stud at Location Indicated on Encl Sketch Should Be Removed | Loctite |
ML20125C716 | 7 December 1992 | Part 21 Rept Re Possibility for Malfunction of Declutching Mechanisms in SMB/SB-000 & SMB/SB/SBD-00 Actuators. Malfunction Only Occurs During Seismic Event.Balanced Levers May Be Purchased from Vendor.List of Affected Utils Encl | Stroke time Anchor Darling |
ML20127P586 | 23 November 1992 | Followup to 921005 Part 21 Rept Re Potential Defect in SB/SBD-1 Housing Cover Screws.Procedure Re Replacement of SBD-1 Spring Cover Bolts Encl.All Fasteners Should Be Loosened & Removed.List of Affected Utils Encl | |
ML20087B855 | 8 November 1991 | Part 21 Rept 10CFR21-0058 Re Camshaft Bearing Block Assembly Mounting Bolts Found to Be Shorter than Required Length.All Engines Where Camshaft Work Was Performed Will Be Inspected. All Bolts Shorter than 4.531 Inches Will Be Replaced | |
ML20087D163 | 8 November 1991 | Rept 10CFR21-0059 Re One Broken Stud & Three Cracked Studs Found at Drivegear End of Left Bank Camshaft Flange.Caused by Sulphide Inclusions.All Broken or Cracked Dowel Bolts Should Be Replaced | |
ML20087B749 | 11 October 1991 | Part 21 Rept Re Failure of Seven Camshaft Bearing Block Assembly Mounting Bolts in Diesel Generator.Caused by Use of Shorter Bolts W/Shorter Tolerance.Issue Under Review | |
ML20087B764 | 11 October 1991 | Part 21 Rept Re Eight Camshaft Locating Studs in Diesel Engine Found Broken & Three Studs Found Cracked.Caused by Fatigue Loading & Torsional Vibration.Justification for Continued Operation Encl | |
ML20070A686 | 17 January 1991 | Part 21 Rept Re Failure of 4.16 Kv vertical-lift Switchgear Cell Mounted,Auxiliary Contacts to Operate on Demand During Testing of Auxiliary Standby Switchgear at Facility. Initially Reported on 901101.New Test Link Sent to Facility | |
L-91-002, Supplemental Part 21 Rept Re GE Reactor Trip Breakers Used in safety-grade Equipment.Initially Reported on 901228.List of Plants Supplied w/C-E Breakers Encl | 4 January 1991 | Supplemental Part 21 Rept Re GE Reactor Trip Breakers Used in safety-grade Equipment.Initially Reported on 901228.List of Plants Supplied w/C-E Breakers Encl | |
ML20028H353 | 13 December 1990 | Part 21 Rept Re Cable Assemblies Failing to Meet IEEE-383 Section 3 Flammability Tests.Results of Tests Conducted on 901206 Encl.Corrective Actions Include Applying Flame Retardant Covering to Cable or Cable Replacement | |
ML20062D935 | 1 November 1990 | Part 21 Rept Re Failure of 4.16 Kv Vertical Lift Switchgear, cell-mounted Auxiliary Contacts to Operate on Command During Testing of Standby Switchgear at Plant.Caused When Maladjusted Test Link Inserted Between Breaker & Switch | |
NRC-90-3528, Part 21 Rept Re Potential Problem in Decay Heat Model of Wcobra/Trac Computer Code.Model Corrected & Calculations Initiated.Recalculations of App K Analyses for Plants Will Be Completed by 900723 | 16 July 1990 | Part 21 Rept Re Potential Problem in Decay Heat Model of Wcobra/Trac Computer Code.Model Corrected & Calculations Initiated.Recalculations of App K Analyses for Plants Will Be Completed by 900723 | |
ML20043F343 | 8 June 1990 | Part 21 Rept Re Circumferential Grove of Varying Depth Up to 0.200 Inches on Inside Surface of Journal Above Attachment Weld to Impeller.Failure of Journal Could Result in Major Damage to Pump.Disassembly Scheduled Over Next 18 Months | |
ML20012C105 | 7 March 1990 | Part 21 Rept Re Several Failures of Fairbanks Morse Engine Div Piston Pins/Bushings on Upper Pistons.Caused by Incorrect Surface Pattern on Piston Pins.Piston Pins Under Listed Purchase Orders to Be Removed & Replaced | |
ML20012A901 | 27 February 1990 | Suppls 900213 10CFR21 Rept Re Chilled Water Sys Operation. Evaluation of Crystal River Determined That Postulated High Energy Line Break in Intermediate Bldg May Be Subj to Steam Loads Higher than Normal Loads,Causing Rising Water Temp | |
ML20011F597 | 22 February 1990 | Part 21 Rept Re Solder Connections in Abb 27/59 Relays Deteriorated Due to Thermal Stress,Causing Bonding of Printed Wiring Pattern to Glass Epoxy Circuit Board.Interim Circuit Board W/Larger Pads & Higher Wattage Will Be Used | |
ML20011F194 | 22 February 1990 | Part 21 Rept Re Abb 27/59 Relay Catalog Series 211L.Solder Connections to Printed Wiring Runs on Bottom of Circuit Board Deteriorated Due to Thermal Stress.No Actual Failure Occurred & Relays to Be Changed at Next Outage | |
ML18153C101 | 2 February 1990 | Part 21 Rept Re Two of Three Pc Cards in GE Type SLV11A1 Over/Undervoltage Relays Failing to Produce Output.Short Between Leads Would Result in Damage to Component 1C5. Sketch of Threshold Detection Board Encl | |
ML17223A745 | 26 January 1990 | Part 21 Rept Re Backup Rings Furnished in Spare Parts Seal Kits & in 25 Gpm 4 Way Valves as Part of Actuators Made of Incorrect Matl.Rings Should Be Viton & Have Been Identified as Buna N |