 Issue dateTitleTopic
ML18016A90112 April 1999Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected
ML17292B53415 January 1999Part 21 Rept Re Incorrect Modeling of BWR Lower Plenum Vol in Bison.Defect Applies Only to Reload Fuel Assemblies Currently in Operation at WNP-2.BISON Code Model for WNP-2 Has Been Revised to Correct ErrorMet Tower
ML17292B53315 January 1999Part 21 Rept Re XL-S96 CPR Correlation for SVEA-96 Fuel. Defect Applies Only to WNP-2,during Cycles 12,13 & 14 Operation.Evaluations of Defect Performed by ABB-CE
ML17354B0979 September 1998Part 21 Rept Re Possible Machining Defect in Certain One Inch Stainless Steel Swagelok Front Ferrules,Part Number SS-1613-1.Caused by Tubing Slipping Out of Fitting at Three Times Working Pressure of Tubing.Notified Affected Utils
B17414, Part 21 Rept Re 980116 Failure of Tachometer Transducer,Id Number TG-25-5,during Surveillance Test.Caused by Bearing Failure Which Could Cause Shaft to Seize & Break.Removed from Svc & Replaced Failed Tachometer Transducer3 September 1998Part 21 Rept Re 980116 Failure of Tachometer Transducer,Id Number TG-25-5,during Surveillance Test.Caused by Bearing Failure Which Could Cause Shaft to Seize & Break.Removed from Svc & Replaced Failed Tachometer TransducerCommercial Grade Dedication
ML18066A27713 August 1998Part 21 Rept Re Deficiency in CE Current Screening Methodology for Determining Limiting Fuel Assembly for Detailed PWR thermal-hydraulic Sa.Evaluations Were Performed for Affected Plants to Determine Effect of Deficiency
ML20236Y1237 August 1998Part 21 Rept Re Gas & Turbine Generator for Dedicated Emergency Power to Vital AC Buses
ML20236V31229 July 1998Final Part 21 Rept Re Enterprise DSR-4 & DSRV-4 Edgs.Short Term Instability Was Found During post-installation Testing & Setup as Part of Design mod/post-work Testing Process. Different Methods Were Developed to Correct Problem
ML17334B82023 June 1998Part 21 Rept Re Defective & Missing Welds Found on Ice Basket Bottom Cross Bar & Bottom Basket Grids During Insp of Unit 1 Ice Condenser.Investigation Ongoing.Defective Ice Basket Bottom Rims Will Be Repaired or ReplacedUnanalyzed Condition
ML20248A16722 May 1998Interim Part 21 Re Enterprise DSR-4 & DSRV-4 Emergency diesel.Post-installation Testing Revealed,High Em/Rfi Levels Affected New Controllers,Whereas Original Controllers Were unaffected.Follow-up Will Be Provided No Later than 980731
ML20248F35321 May 1998Part 21 Rept Re Electronic Equipment Repaired or Reworked by Integrated Resources,Inc from Approx 930101-980501.Caused by 1 Capacitor in Each Unit Being Installed W/Reverse Polarity. Policy of Second Checking All Capacitors Is Being AdoptedReverse polarity
ML20247B6751 May 1998Part 21 Rept Re Evaluation & Notification for RELAP4 Excessive Variability at Millstone Unit 2.Caused by Small Changes in Input to RELAP4 That Can Result in Large Changes in Calculated Peak Cladding Temp.Informed NRC of Deviation
ML20217D57020 March 1998Part 21 Rept 40 Re Governor Valve Stems Made of Inconel 718 Matl Which Caused Loss of Governor Control.Control Problems Have Been Traced to Valve Stems Mfg by Bw/Ip.Id of Carbon Spacer Should Be Increased to at Least .5005/.5010
ML20198E0637 January 1998Part 21 Rept Re Shipment by Dubose National Energy Svcs,Inc, of 40 Pieces of 4 inch,90 Degree Elbows Which Did Not Meet ASME Section II SA-234 Requirements
ML20217K51924 October 1997Part 21 Rept Re Five Valves That May Have Defect Related to Possible Crack within Forging Wall at Die Flash Line.Caused by Less than Optimal Forging Temperatures.Newer Temperature Monitoring Devices at Forging Area Heating Ovens ProcuredHydrostatic
ML20211M6498 October 1997Addenda 1 to Part 21 Rept Re Weldments on Opposed Piston & Coltec-Pielstick Emergency stand-by Diesel gen-set lube-oil & Jacket Water Piping Sys.Revised List of Potentially Affected Utils to Include Asterisked Utils,Submitted
ML20211M9483 October 1997Supplemental Part 21 Rept Re Condition Effected Emergency Svc Water Pumps Supplied by Bw/Ip Intl Inc to Gpu Nuclear, Oyster Creek Nuclear Generation Station.No Other Nuclear Generating Stations Effected by Notification
ML20211H79130 September 1997Part 21 Rept Re Failure of Weldment Associated w/lube-oil Piping Sys on 970804 at Millstone,Unit 2.Root Cause Is Not Yet Known.Quality of Weldment Is Being Considered.Listed Util Sites Affected
ML17309A62129 September 1997Part 21 Rept Re Final Disposition of Masterflow 713 & Embeco 636 Grout Nonconformance Reported by Master Builders,Inc. Licensee Continuing to Monitor shelf-life of Masterflow 713 & Embeco 636 Grouts Produced at Rancho Cucamonga
ML20211B74624 September 1997Part 21 Rept Re Failure of Emergency Service Water Pump Due to Threaded Flange Attaching Column to Top Series Case Failure.Caused by Dissimilar Metals.Pumps in High Ion Svc Will Be Upgraded to 316 Stainless Steel Matl
B16531, Part 21 Rept Re GE Commercial Grade Dedication Program Being Determined to Be Inadequate in Ability to Demonstrate Seismic Capability of Specific Relay.Returned Relays to GE Facility for Repair3 July 1997Part 21 Rept Re GE Commercial Grade Dedication Program Being Determined to Be Inadequate in Ability to Demonstrate Seismic Capability of Specific Relay.Returned Relays to GE Facility for RepairTime of Discovery
Commercial Grade Dedication
Design basis earthquake
ML20140J19812 June 1997Part 21 Rept Re Failures of GE Type CR120AD Relays Dedicated for SR Use.Resulting High Current Through Short Circuit Caused Magnet Wire to Fuse & Produced Energetic Arc at Failure
ML20140D6586 June 1997Part 21 Rept Re GE Model Ifcs Relays Procured from GE Delivered W/Loose Hardware & Unsuitable for Use at Unit 1
ML20140A47627 May 1997Provides Addl Info to 970429 Part 21 Rept Re Potential safety-related Problem W/Asco HV 266000-007J Scram Solenoid Pilot Valves.Corrective Actions Also Listed
ML20140G4481 May 1997Part 21 Rept Re Potential Defect in Component of Dsrv & Dsr Enterprise Standby Diesel Generator Sys.Recommends That Springs Be Inspected on Periodic Basis,Such as During Refueling Outages
ML20140G55529 April 1997Part 21 Rept Re Potential safety-related Problems W/Asco HV 266000-007J Scram Solenoid Pilot Valves (Sspv).Caused by Hardening of Core Disc in SSPV Pilot Head.Investigation Is Continuing
ML17333A86522 April 1997Part 21 Rept Re Defective Double Pole Torque Switch.Caused by Missing Spacer.Limitorque Instituted Addl Insp Check of Double Pole Torque Switches During Assembly & Licensees Must Review All Installed & in-stock Torque SwitchesAnchor Darling
ML17333A8449 April 1997Part 21 Rept Re Limitorque Torque Assembly Used in SMB-00 Valve Actuators That Were Missing Spacer.Replaced or Repaired Defective Assemblies by Addition of Spacer
ML20210E35927 March 1997Part 21 Rept Re Sorrento Electronics Inc Has Determined Operation & Maint Manual May Not Adequately Define Requirements for Performing Periodic Surveillance of SR Applications.Caused by Hardware Failures.Revised RM-23A
ML20137F32226 March 1997Part 21 Rept Re Perry Nuclear Power Plant Experiencing False Trip of K600S K-Line Low Voltage Circuit Breaker w/SS-5 Solid State Trip Device.Breaker Removed from Svc & Returned to Abb for Analysis
ML17333A81619 March 1997Part 21 Rept Re Missing Spacers from Standard SMB-00 Torque Switch Assemblies.Caused by Defective Lot Received from Limitorque Facility.Replaced or Repaired Defective Assemblies by Addition of Spacer
ML17333A90419 March 1997Part 21 Rept Re Spacer Missing from Torque Switch Assembly for MOV 2-MMO-421 Which Allows Torque Switch Shaft to Rotate Slightly Along Length of Shaft.Defective Assemblies Replaced or Repaired by Addition of Spacer
B16149, Part 21 Rept Re Cracked Fuse Ferrule Defects Due to Administrative Error in Ltr Detailing Commitments Re Issue. Corrected Copy of Commitments Associated W/Ltr Provided14 January 1997Part 21 Rept Re Cracked Fuse Ferrule Defects Due to Administrative Error in Ltr Detailing Commitments Re Issue. Corrected Copy of Commitments Associated W/Ltr Provided
ML20133E8008 January 1997Deficiency Rept Re Nonconformance Related to Masterflow 713 Grout,Which Master Builders,Inc Has Supplied as Nuclear SR Product to 18 Npps.Cause Unknown.Requests That Listed Info Be Provided to Gain Insight as to Scope & Possible Cause
B16030, Part 21 Rept Re Stocked safety-related Fuses Issued from Storeroom for Installation Which Had Cracked Ferrules in Longitudinal Direction on 960911.Procurement & Warehouse Groups Completed Inspecting Fuses in Warehouse13 December 1996Part 21 Rept Re Stocked safety-related Fuses Issued from Storeroom for Installation Which Had Cracked Ferrules in Longitudinal Direction on 960911.Procurement & Warehouse Groups Completed Inspecting Fuses in Warehouse
ML20134N40622 November 1996Part 21 Rept Re Fifteen Different Fuse Types from Three Different Mfgs Found to Have Axial Cracks Due to Brass Being Susceptible to Defect.Functional Testing Should Be Performed on Sample of Fuses
ML20134H3365 November 1996Part 21 Rept Re Defective Inner Thrust Bearing 1801461-01 Used in PSA 35 Mechanical Shock Arrestor Used as Restraint on Piping Sys for Nuclear Generating Plant.Lot of Defective Parts Located & Isolated to Three Customers
ML20134F5744 November 1996Part 21 Rept Re non-compliance for DG Control Sys.Licensee Revised Component Dedication Rept to Require Removal of Jumper & Require Checking Auxiliary Contact Arm Screws for Tightness.Gpu Only User Affected by Notification
ML18065B01118 October 1996Part 21 Rept Re Application of Certain Aspects of ABB-CE Safety Analysis Methodology
ML20115D2009 July 1996Part 21 Rept Re Mfg Defect of Enterprise DSR-4 & DSRV-4 Edgs,Originally Mfg by Calcon Corp.Amot Control Corp Purchased Calcon Product Line & Maintains Design & Production.Valves Returned to Cooper Energy Svcs on 960131
ML20115F2473 July 1996Part 21 Rept Re Piping (Small Portion of Unmelted Matl Drawn Lengthwise Into Bar During Drawing Process) Defect That Existed in Bar as Received from Mill.Addl Insp Procedure for Raw Matl Instituted
ML20117G46414 May 1996Part 21 Rept Re Cooper Bessemer Reciprocating Products,Div of Cooper Cameron Corp,Issued Ltr to Define Utils/Plants Containing Similar Equipment as Supplied on Cooper Bessemer Ksv & Enterprise Dsr EDGs
ML17292A2148 May 1996Part 21 Rept Re Capscrews Supplied to Wppss by Now Defunct Cardinal Industrial Products,Lp (CIP) Having Nonconforming Hardness.Failed Lots & Any Remaining Product Found to Have Been Heat Treated by CIP Scrapped & Removed from Premises
LD-96-014, Part 21 Rept Re Response to NRC Notice on Nonconformance. Licensee Will Direct Cognizant Personnel Reviewing Deviation or Failure to Comply for Basic Components Delivered to Customers,To Document Whether/Not Facts Indicate Evaluation26 April 1996Part 21 Rept Re Response to NRC Notice on Nonconformance. Licensee Will Direct Cognizant Personnel Reviewing Deviation or Failure to Comply for Basic Components Delivered to Customers,To Document Whether/Not Facts Indicate Evaluation
ML20094M62521 November 1995Final Part 21 Rept of Investigation & Analysis of Suspect Fasteners Event 29257.B&G-Cardinal Discontinued Using Heat Treatment Equipment at Cardinal Facility Until Such Time That Satisfactory Mods Made to Hardware & Procedures
ML20083R91026 April 1995Final Part 21 Rept Re Kepco,Inc Model RMX24-D-20804 Power Supplies in Which Transistors Q15 &/Or Q16 Failed to Open & R1 Was Open.Replacement of Transmitters w/XSIS-095 Along W/ Replacement of Electrolytic Capacitors Provides Solution
ML20078F60230 January 1995Part 21 Rept Re Possibilities of Some Nonconforming Diodes May Have Been Used in Safety Related Spare Parts Provided for S4N,D4N,T4N & 2100C
ML18038A8977 September 1994Part 21 Rept Re Defect in Latching Mechanism of Potter & Brumfield Relay on C&D High Voltage Shut Down Alarm Assembly Printed Circuit Boards.Pull Test on Relay Reset Button Incorporated Into Receiving Insp Procedures
ML17291A25722 July 1994Part 21 Rept Re Westinghouse Containment Penetration Modules Scotchcast Strain Relief & Varglas Insulated Conductors. Replaced Six of 12 RPIS Scotchcast/Varglas Modules & Three Scotchcast/Okonite Modules During Refueling Outage (R-9)
ML17291A23515 July 1994Deficiency Rept Re Material Defects in Facility Containment Penetration Modules.Initially Reported on 940715.Modules Were Replaced