 Issue dateTitleTopic
ML20217A16922 September 1999Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers
ML20207E93126 February 1999Part 21 Rept Re Sprague Model TE1302 Aluminum Electrolytic Capacitors with Date Code of 9322H.Caused by Aluminum Electrolytic Capacitors.Affected Capacitors Replaced
ML20199M08922 January 1999Part 21 Rept Re Failure of Square Root Converters.Caused by Failed Aluminum Electrolytic Capacitory Spargue Electric Co (Model Number TE1302 with Mfg Date Code 9322H).Sent Square Root Converters Back to Mfg,Barker Microfarads,Inc
ML20153D01918 September 1998Part 21 Rept Re Defect in Gap Conductance Analyses for co- Resident BWR Fuel.Initially Reported on 980917.Corrective Analyses Performed Demonstrating That Current Operating Limits Bounding from BOC to Cycle Exposure of 8 Gwd/MtuFuel cladding
ML20153C67717 September 1998Part 21 Rept Re Defect Relative to MCPR Operating Limits as Impacted by Gap Conductance of co-resident BWR Fuel at Facilities.Operating Limit for LaSalle Unit 2 & Quad Cities Unit 2 Will Be Revised as Listed
ML20248F35321 May 1998Part 21 Rept Re Electronic Equipment Repaired or Reworked by Integrated Resources,Inc from Approx 930101-980501.Caused by 1 Capacitor in Each Unit Being Installed W/Reverse Polarity. Policy of Second Checking All Capacitors Is Being AdoptedReverse polarity
ML20217D02822 April 1998Part 21 Rept Re Additive Constants Used in MCPR Determination for Siemens ATRIUM-9B Fuel by Core Monitoring Sys Were Found to Be non-conservative.SPC Personnel Notified All Customers w/ATRIUM-9B Lead Test AssembliesFitness for Duty
ML20217J61314 July 1997Part 21 Rept Re Incomplete Defined Changes Made to Standby DG W/Emd Diesel Engines by Mfg
ML20140A47627 May 1997Provides Addl Info to 970429 Part 21 Rept Re Potential safety-related Problem W/Asco HV 266000-007J Scram Solenoid Pilot Valves.Corrective Actions Also Listed
ML20148B0182 May 1997Part 21 Rept Re Failure of Plunger on Solenoid Number 1 to Return to de-actuated Position in Timely Manner When Solenoid Was de-energized.Caused by Plunger Moving While in Energized Condition.Added 'Noise' Test
ML20210E35927 March 1997Part 21 Rept Re Sorrento Electronics Inc Has Determined Operation & Maint Manual May Not Adequately Define Requirements for Performing Periodic Surveillance of SR Applications.Caused by Hardware Failures.Revised RM-23A
ML20134D85728 October 1996Part 21 Rept Re Steam Isolation Valved Failed to Close within 3-5 Seconds Required by Ts.Caused by One Plunger from Solenoid Missed Machining Operation After Vitron Insert Pressed In.Solenoid Energized
ML20095K39121 December 1995Final Part 21 Rept 95-015 Re Bldg of Achor Darling Valves W/ Cavitation Trim.Plant Will Perform Monthly Testing of Running Loads on a Loop Valve Until ModifiedTime of Discovery
Anchor Darling
ML20078S19321 December 1994Final Part 21 Rept Re Nonconservative Assumptions of Turbine Bypass Vot in Plant Transient Analyses for Unit 2.GE Analyses Determined That Deviation Created Potential Substantial Safety HazardTime of Discovery
Feedwater Controller Failure
ML20059L98611 November 1993Part 21 Rept Re Deviation Wherein Fully Open Butterfly Valve Located 15 Pipe Diameters Upstream of Sensors Was Disturbing Flow Profile Enough to Cause Ultrasonic Meter to Indicate 3 to 4% Low.Customers Notified & Valve Removed
ML20059G30422 October 1993Part 21 Rept Re Defective Dual Plate Check Valves W/Viton Seats Supplied by C & Valve Co Since 900928.Immediate Corrective Action Taken to Identify Locations of Defective Valves & Conduct Periodic Surveillance of Ccsw Pressure
ML20056D70715 July 1993Part 21 Rept Re Reportable defect-75 PSIG Relief Check Valve 1 Npt,Emd 9521844,Kepner 416C-1-75
ML20127K62612 January 1993Part 21 Rept Re Model Std 130 Differential Pressure Transmitters Manufactured by Honeywell in Accordance W/ Requirements of 10CFR21.21(a)(2)
ML20072R67327 March 1991Part 21 Rept Re Increased Air Leakage in Pathway Bellows Corp Bellows Assembly.Assembly Replaced by Parker-Metal Bellows CorpThrough-Wall Leak
ML20247D30112 July 1989Part 21 Rept 10CFR21-0047 Re Control Wiring Insulation of Inner Jacket Used on General Motors Diesel Generator Sets Identified as 999 or MP Series.Encl List of Owners of Units Notified
ML20207N46412 October 1988Part 21 Rept Re Potential Problem W/Emd 20-645E4,Type 999 Excitation Sys Circuit Breaker & Wiring.Potential for Field Circuit Breaker to Trip Due to Combined Air Temps & Field Current Exists at All Plants W/Model 999 Sys
ML20153G0116 May 1988Part 21 Rept Re Potential Defect in Bussman Buss KTK-R Fuse Blocks W/Part Numbers 2078,2079 & 2080.Purchasing Records Reviewed to Identify If Any Parts Were Actually Used or Shipped to Customers.Results Listed
ML20211P72123 February 1987Part 21 Rept Re Rockbestos Coaxial Cable Used in Sorrento Electronics Digital & Analog high-range Radiation Monitor. Insulation Resistance at High Temp Not High Enough for Ion Chamber & Associated Electronics to Operate Properly
ML20212E56319 December 1986Part 21 Rept Re Valve Problem.Houghto 620 Lubricant Attacks & Degrades Aluminum in Valves.Valves Have Been or Being Rebuilt
ML20215D2379 December 1986Part 21 Rept Re Environ Qualification of AMP Butt Splices in GE Drywell Penetrations.Splices Retested by Simulating Postulated LOCA & Failed Due to Excessive Leakage.Ge Contacted Re Repair of Splices
ML20213F96610 November 1986Part 21 Rept Re Failure of Battery inter-rack Connecting Cable Assembly Supplied by Gnb Batteries,Inc.Initially Reported on 861107.Battery Cables Replaced
ML20214M3184 September 1986Potential Part 21 Rept Re Contromatics Actuator W/Jackscrew/ Handwheel Emergency Override Operator.Jackscrew/Handwheel Should Be Used for Emergency Manual Operation Only.Encl Ltr Also Sent to Listed Utils/Ae Firms
ML20141D8051 April 1986Part 21 Rept Re Model 402 Series Level Control Used for safety-related Application Shipped W/O Torque Check. Customers Will Be Notified by 860428 & Requested to Perform Torque Check.List of Plants Using Component EnclEarthquake
ML20154K3615 March 1986Part 21 Rept Re Possible Wiring Defect in Fabricated Primer Chamber Assemblies for Standby Liquid Control Valves. Initially Reported on 860214.Listed Corrective Actions Will Be Completed by 860328
ML20133N4695 August 1985Part 21 Rept Re Raychem Wcsf Shrink Sleeving for Sensor/ Connecting Assembly of Safety Relief Valve Monitoring Sys. Testing & Retesting in Progress.Sensor Installation Utilizing Shrink Sleeving Recommended
ML20128G51024 May 1985Part 21 Rept Re Heat Numbers to Be Added & Deleted from Sublist Sheet A,Based on Review of NRC
ML20117L58914 May 1985Part 21 Rept Re Hatch Transfer Starters & Transfer Starter Assemblies.Evaluation of Implementation of QA Program Performed on 850429-0503.Results of Evaluation Verified Seismic Adequacy of Equipment
ML20127N06213 May 1985Part 21 Rept Re Incorrect Short Time Delay Band Lever Inadequately Installed in Low Voltage K-line Circuit Breaker Electromechanical Overcurrent Trip Device.Visual Insp to Determine If Correct Lever Installed Recommended
ML20111C5434 March 1985Part 21 Rept Re Degradation of 125-volt Dc Battery.Thirty Cells on Battery Show Corrosion Around Weld Between Plates & Internal Bus Bar.Gnb Batteries,Inc 58 Cell NCT-1344 Lead Calcium Battery Purchased to Replace Existing Battery
ML20086U42524 February 1984Followup Part 21 Rept Re Defective Mechanical Snubber Capstan Springs Supplied by Pacific Scientific.Affected Utils Listed.Purchasers Have Been Notified & Advised to Work Directly W/Pacific Scientific in Disposition
ML20072N9898 July 1983Interim Part 21 Rept Confirming 830705 Telcon Re Anomalies in Artificially Aged Apparatus (Using Ahrrenius Methodology W/Elevated Temp Aging).Deficiency Found During Qualification Testing for IEEE 323-1974.Draft Notices Encl
ML20085E7655 August 1976Final Deficiency Rept Re Incorrect Installation of Reactor Pressure Vessel (RPV) Seismic Stabilizer Plates.Initially Reported on 760513.Formal QA Program Developed & Implemented Since Pvs Stabilizer Assembly Installed
ML20085K0674 January 1974Final Deficiency Rept Re Control Logic of HPCI & RCIC Sys. Initially Reported on 731110.Four Addl Qualified High Reactor Water Level Switches Will Be Installed