Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML23019A3482 February 2023Issuance of Relief Request No. SC-I5R-221 for the Alternative Repair for Service Water System PipingCoatings
Nondestructive Examination
VT-2
Through-Wall Leakage
ML22194A84015 July 2022Correction Letter of Relief Request No. HR-I4R-220 Reactor Pressure Vessel Water Level Instrumentation Partial Penetration Nozzle RepairsNondestructive Examination
ML22181A1255 July 2022Issuance of Relief Request No. HR I4R-220 Reactor Pressure Vessel Water Level Instrumentation Partial Penetration Nozzle RepairsNondestructive Examination
LR-N21-0052, Request for Relief from ASME Code Defect Removal for Service Water Buried Piping7 April 2022Request for Relief from ASME Code Defect Removal for Service Water Buried PipingUltimate heat sink
VT-2
Finite Element Analysis
ML21145A18910 June 2021Authorization and Safety Evaluation for Alternative Request No. SC-I4R-200Hydrostatic
Probabilistic Risk Assessment
Incorporated by reference
ML20099E23320 April 2020Issuance of Alternative Request S1-I4R-191 for the Fourth 10-Year Inservice Inspection IntervalBoric Acid
VT-2
ML20091L99913 April 2020Issuance of Relief Request HC-I4R-190 for the Fourth 10-Year Inservice Inspection Interval
LR-N19-0084, Proposed Alternative for Examination of ASME Section XI, Steam Generator and Pressurizer Nozzle Inside Radius Sections, Per Inservice Inspection Relief Request SC-I4R-19210 September 2019Proposed Alternative for Examination of ASME Section XI, Steam Generator and Pressurizer Nozzle Inside Radius Sections, Per Inservice Inspection Relief Request SC-I4R-192
LR-N19-0083, Request for Relief S1-I4R-191 from Alloy 690 PWR Reactor Vessel Head Inspection Interval, Fourth 10-year Interval10 September 2019Request for Relief S1-I4R-191 from Alloy 690 PWR Reactor Vessel Head Inspection Interval, Fourth 10-year Interval
ML19220A1026 September 2019Alternative Request VR-03 to Use ASME Code Case OMN-17, Alternative Rules for Testing ASME Class 1 Pressure Relief/Safety Valve for the Fourth 10-Year Inservice Test IntervalIncorporated by reference
Grace period
ML19136A02611 July 2019Issuance of Relief Request No. HC-I3R-08, Revision 0, Use of the ASME CodeVT-2
Incorporated by reference
EVT-1
Pressure Boundary Leakage
Scaffolding
LR-N18-0087, Submittal of Relief Request Associated with the Third Inservice Inspection (ISI) Interval24 September 2018Submittal of Relief Request Associated with the Third Inservice Inspection (ISI) IntervalNon-Destructive Examination
VT-2
EVT-1
Liquid penetrant
Pressure Boundary Leakage
Dissimilar Metal Weld
Scaffolding
ML17219A18617 August 2017Safety Evaluation of Relief Request SC-I4R-171 Regarding the Fourth 10-Year Interval of the Inservice Inspection ProgramNondestructive Examination
Incorporated by reference
DM weld
ML17223A48317 August 2017Relief from the Requirements of the ASME Code for Alternative to Nozzle-to-Vessel Weld and Inner Radius Examinations
ML17132A00519 May 2017Alternative Request to Adopt American Society of Mechanical Engineers Code Case OMN-20 (CAC Nos. MF8313 and MF8314)Grace period
ML16343A05720 December 2016Requests for Relief GR-01, PR-01, PR-02, VR-01, and VR-02, for the Fourth Inservice Testing IntervalIncorporated by reference
Condition Adverse to Quality
Surveillance Frequency Control Program
Maintenance Rule Program
Grace period
ML15349A95624 December 2015Relief from the Requirements of the ASME CodeBoric Acid
VT-2
ML15281A1202 November 2015Relief from the Requirements of the ASME Code
ML15195A49528 July 2015Relief from the Requirements of the ASME CodeVT-2
Incorporated by reference
ML14153A14623 June 2014Safety Evaluation of Relief Request No. S2-14R-131 Regarding the Fourth Ten-Year Inservice Inspection Interval (Tac ME2442)Probabilistic Risk Assessment
Incorporated by reference
Exemption Request
ML13088A21918 April 2013Safety Evaluation of Relief Request No. S2-14R-123 Regarding the Fourth Ten-Year Inservice Inspection Interval Code EditionIncorporated by reference
LR-N12-0157, Submittal of Relief Request Associated with the Fourth Ten-Year Inservice Inspection (ISI) Interval Code Edition7 June 2012Submittal of Relief Request Associated with the Fourth Ten-Year Inservice Inspection (ISI) Interval Code EditionIncorporated by reference
ML11242017519 September 2011Safety Evaluation of Relief Requests Regarding Pressure Testing of Service Water System Buried Piping - Salem Nuclear Generating Station, Unit Nos. 1 and 2VT-2
Incorporated by reference
Through-Wall Leak
LR-N10-0380, Request for Authorization to Continue Using a Risk-Informed Inservice Inspection Alternative to the ASME Boiler and Pressure Vessel Code Section XI Requirements for Class 1 and 2 Piping21 October 2010Request for Authorization to Continue Using a Risk-Informed Inservice Inspection Alternative to the ASME Boiler and Pressure Vessel Code Section XI Requirements for Class 1 and 2 PipingMission time
Internal Flooding
Probabilistic Risk Assessment
Nondestructive Examination
Dissimilar Metal Weld
ML0936500867 January 2010Safety Evaluation of Relief Requests for the Third 10-Year Interval of the Inservice Inspection Program for Salem Nuclear Generating Station, Unit Nos. 1 and 2Hydrostatic
VT-2
Incorporated by reference
ML09203046411 August 2009Safety Evaluation of Relief Requests for the Fourth 10-Year Interval of the Inservice Testing Program for Salem Nuclear Generating Station, Unit 1 & 2 (TAC ME0322, ME0323, ME0324, ME0325, ME0326, ME0327, ME0328, ME0329, ME0330, ME0331, ME03Stroke time
Incorporated by reference
Power-Operated Valves
LR-N09-0126, Relief Requests to Extend the Inservice Interval for Reactor Vessel Weld Examination11 June 2009Relief Requests to Extend the Inservice Interval for Reactor Vessel Weld ExaminationProbabilistic Risk Assessment
ML08247006316 October 2008Safety Evaluation of Relief Requests for the Third 10-Year Interval of the Inservice Inspection Program for Hope Creek Generating StationHydrostatic
Probabilistic Risk Assessment
VT-2
Incorporated by reference
Large early release frequency
Exemption Request
Dissimilar Metal Weld
ML08255021810 October 2008Safety Evaluation of Relief Requests for the Third 10-Year Interval of the Inservice Testing Program for Salem Nuclear Generating Station, Unit Nos. 1 and 2Stroke time
Incorporated by reference
Power Operated Valves
LR-N05-0446, ASME Code Relief Request Salem Units 1 and 216 November 2005ASME Code Relief Request Salem Units 1 and 2Hydrostatic
Finite Element Analysis
LR-N04-0473, Relief Request SC-13-RR-A14 Synchronization of Salem Units 1 and 2 ISI Programs Ten-Year Inservice Inspection Intervals31 October 2005Relief Request SC-13-RR-A14 Synchronization of Salem Units 1 and 2 ISI Programs Ten-Year Inservice Inspection IntervalsIncorporated by reference
ML05258026630 September 2005Evaluation of Relief Requests S1-RR-04-V01 and S1-RR-04-V02 Related to the Third 10-Year Interval Inservice Testing ProgramStroke time
Incorporated by reference
ML05152017729 August 2005Evaluation of Relief Request HC-RR-I2-W01Non-Destructive Examination
Weld Overlay
Hydrostatic
Dissimilar Metal Weld
ML0500302112 August 2005Relief, HC-RR-12-30, MC5174Weld Overlay
Nondestructive Examination
Incorporated by reference
ML0511803444 May 2005Evaluation of Relief Request S2-13-RR-F01Incorporated by reference
ML05115037929 April 2005Evaluation of Relief Request S2-13-RR-A06Incorporated by reference
ML0428005546 October 2004Request for Additional Information Relief Requests S1-RR-04-V01 and V02Stroke time
ML04201025027 August 2004Evaluation of Relief Request HC-RR-12-023VT-2
Incorporated by reference
Pressure Boundary Leakage
ML04092036123 April 2004Evaluation of Relaxation Request No. S1-RR-13-B22, First Revised Order (EA-03-009) Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water ReactorsNondestructive Examination
ML03225047126 August 2003Evaluation of Relief Request HC-RR-B08Incorporated by reference
ML03209020028 July 2003Relief, Relief from ASME Code Requirements Related to the Salem Inservice Inspection Program, Relief Request S1-RR-F01, MB6098Nondestructive Examination
Incorporated by reference
ML03142048115 May 2003Supplemental Information for Relief Request HC-RR-B11EVT-1
ML03113000414 April 2003Inservice Inspection Program Relief Request HC-RR-B12
ML03113000714 April 2003Code Relief, Alternative to Required Volumetric Examination for Nozzles Where Plant Configuration Is Such That Visual Examination of Inner Radius May Be Performed on Essentially 100 Percent of Inner Radius
ML03059021620 February 2003Inservice Inspection Program Relief Request HC-RR-A02
ML03059020720 February 2003Inservice Inspection Program Relief Request HC-RR-A06
ML03059034720 February 2003Inservice Inspection Program Relief Request HC-RR-B08
ML03069017720 February 2003Inservice Inspection Program Relief Request HC-RR-F02
ML0224704093 February 2003Relief, Use of ASME Code Case N-532-1, Alternative Requirements to Repair and Replacement Documentation Requirements and Inservice Summary Report Preparation and Submission, MB6089
ML03016075016 January 2003Relief, ASME Code Requirements Related to the Salem Inservice Inspection Program, Relief Request S1-RR-B01 and S1-RR-C01Boric Acid
Nondestructive Examination
VT-2
Incorporated by reference
Liquid penetrant
Dissimilar Metal Weld