Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML23019A348 | 2 February 2023 | Issuance of Relief Request No. SC-I5R-221 for the Alternative Repair for Service Water System Piping | Coatings Nondestructive Examination VT-2 Through-Wall Leakage |
ML22194A840 | 15 July 2022 | Correction Letter of Relief Request No. HR-I4R-220 Reactor Pressure Vessel Water Level Instrumentation Partial Penetration Nozzle Repairs | Nondestructive Examination |
ML22181A125 | 5 July 2022 | Issuance of Relief Request No. HR I4R-220 Reactor Pressure Vessel Water Level Instrumentation Partial Penetration Nozzle Repairs | Nondestructive Examination |
LR-N21-0052, Request for Relief from ASME Code Defect Removal for Service Water Buried Piping | 7 April 2022 | Request for Relief from ASME Code Defect Removal for Service Water Buried Piping | Ultimate heat sink VT-2 Finite Element Analysis |
ML21145A189 | 10 June 2021 | Authorization and Safety Evaluation for Alternative Request No. SC-I4R-200 | Hydrostatic Probabilistic Risk Assessment Incorporated by reference |
ML20099E233 | 20 April 2020 | Issuance of Alternative Request S1-I4R-191 for the Fourth 10-Year Inservice Inspection Interval | Boric Acid VT-2 |
ML20091L999 | 13 April 2020 | Issuance of Relief Request HC-I4R-190 for the Fourth 10-Year Inservice Inspection Interval | |
LR-N19-0084, Proposed Alternative for Examination of ASME Section XI, Steam Generator and Pressurizer Nozzle Inside Radius Sections, Per Inservice Inspection Relief Request SC-I4R-192 | 10 September 2019 | Proposed Alternative for Examination of ASME Section XI, Steam Generator and Pressurizer Nozzle Inside Radius Sections, Per Inservice Inspection Relief Request SC-I4R-192 | |
LR-N19-0083, Request for Relief S1-I4R-191 from Alloy 690 PWR Reactor Vessel Head Inspection Interval, Fourth 10-year Interval | 10 September 2019 | Request for Relief S1-I4R-191 from Alloy 690 PWR Reactor Vessel Head Inspection Interval, Fourth 10-year Interval | |
ML19220A102 | 6 September 2019 | Alternative Request VR-03 to Use ASME Code Case OMN-17, Alternative Rules for Testing ASME Class 1 Pressure Relief/Safety Valve for the Fourth 10-Year Inservice Test Interval | Incorporated by reference Grace period |
ML19136A026 | 11 July 2019 | Issuance of Relief Request No. HC-I3R-08, Revision 0, Use of the ASME Code | VT-2 Incorporated by reference EVT-1 Pressure Boundary Leakage Scaffolding |
LR-N18-0087, Submittal of Relief Request Associated with the Third Inservice Inspection (ISI) Interval | 24 September 2018 | Submittal of Relief Request Associated with the Third Inservice Inspection (ISI) Interval | Non-Destructive Examination VT-2 EVT-1 Liquid penetrant Pressure Boundary Leakage Dissimilar Metal Weld Scaffolding |
ML17219A186 | 17 August 2017 | Safety Evaluation of Relief Request SC-I4R-171 Regarding the Fourth 10-Year Interval of the Inservice Inspection Program | Nondestructive Examination Incorporated by reference DM weld |
ML17223A483 | 17 August 2017 | Relief from the Requirements of the ASME Code for Alternative to Nozzle-to-Vessel Weld and Inner Radius Examinations | |
ML17132A005 | 19 May 2017 | Alternative Request to Adopt American Society of Mechanical Engineers Code Case OMN-20 (CAC Nos. MF8313 and MF8314) | Grace period |
ML16343A057 | 20 December 2016 | Requests for Relief GR-01, PR-01, PR-02, VR-01, and VR-02, for the Fourth Inservice Testing Interval | Incorporated by reference Condition Adverse to Quality Surveillance Frequency Control Program Maintenance Rule Program Grace period |
ML15349A956 | 24 December 2015 | Relief from the Requirements of the ASME Code | Boric Acid VT-2 |
ML15281A120 | 2 November 2015 | Relief from the Requirements of the ASME Code | |
ML15195A495 | 28 July 2015 | Relief from the Requirements of the ASME Code | VT-2 Incorporated by reference |
ML14153A146 | 23 June 2014 | Safety Evaluation of Relief Request No. S2-14R-131 Regarding the Fourth Ten-Year Inservice Inspection Interval (Tac ME2442) | Probabilistic Risk Assessment Incorporated by reference Exemption Request |
ML13088A219 | 18 April 2013 | Safety Evaluation of Relief Request No. S2-14R-123 Regarding the Fourth Ten-Year Inservice Inspection Interval Code Edition | Incorporated by reference |
LR-N12-0157, Submittal of Relief Request Associated with the Fourth Ten-Year Inservice Inspection (ISI) Interval Code Edition | 7 June 2012 | Submittal of Relief Request Associated with the Fourth Ten-Year Inservice Inspection (ISI) Interval Code Edition | Incorporated by reference |
ML112420175 | 19 September 2011 | Safety Evaluation of Relief Requests Regarding Pressure Testing of Service Water System Buried Piping - Salem Nuclear Generating Station, Unit Nos. 1 and 2 | VT-2 Incorporated by reference Through-Wall Leak |
LR-N10-0380, Request for Authorization to Continue Using a Risk-Informed Inservice Inspection Alternative to the ASME Boiler and Pressure Vessel Code Section XI Requirements for Class 1 and 2 Piping | 21 October 2010 | Request for Authorization to Continue Using a Risk-Informed Inservice Inspection Alternative to the ASME Boiler and Pressure Vessel Code Section XI Requirements for Class 1 and 2 Piping | Mission time Internal Flooding Probabilistic Risk Assessment Nondestructive Examination Dissimilar Metal Weld |
ML093650086 | 7 January 2010 | Safety Evaluation of Relief Requests for the Third 10-Year Interval of the Inservice Inspection Program for Salem Nuclear Generating Station, Unit Nos. 1 and 2 | Hydrostatic VT-2 Incorporated by reference |
ML092030464 | 11 August 2009 | Safety Evaluation of Relief Requests for the Fourth 10-Year Interval of the Inservice Testing Program for Salem Nuclear Generating Station, Unit 1 & 2 (TAC ME0322, ME0323, ME0324, ME0325, ME0326, ME0327, ME0328, ME0329, ME0330, ME0331, ME03 | Stroke time Incorporated by reference Power-Operated Valves |
LR-N09-0126, Relief Requests to Extend the Inservice Interval for Reactor Vessel Weld Examination | 11 June 2009 | Relief Requests to Extend the Inservice Interval for Reactor Vessel Weld Examination | Probabilistic Risk Assessment |
ML082470063 | 16 October 2008 | Safety Evaluation of Relief Requests for the Third 10-Year Interval of the Inservice Inspection Program for Hope Creek Generating Station | Hydrostatic Probabilistic Risk Assessment VT-2 Incorporated by reference Large early release frequency Exemption Request Dissimilar Metal Weld |
ML082550218 | 10 October 2008 | Safety Evaluation of Relief Requests for the Third 10-Year Interval of the Inservice Testing Program for Salem Nuclear Generating Station, Unit Nos. 1 and 2 | Stroke time Incorporated by reference Power Operated Valves |
LR-N05-0446, ASME Code Relief Request Salem Units 1 and 2 | 16 November 2005 | ASME Code Relief Request Salem Units 1 and 2 | Hydrostatic Finite Element Analysis |
LR-N04-0473, Relief Request SC-13-RR-A14 Synchronization of Salem Units 1 and 2 ISI Programs Ten-Year Inservice Inspection Intervals | 31 October 2005 | Relief Request SC-13-RR-A14 Synchronization of Salem Units 1 and 2 ISI Programs Ten-Year Inservice Inspection Intervals | Incorporated by reference |
ML052580266 | 30 September 2005 | Evaluation of Relief Requests S1-RR-04-V01 and S1-RR-04-V02 Related to the Third 10-Year Interval Inservice Testing Program | Stroke time Incorporated by reference |
ML051520177 | 29 August 2005 | Evaluation of Relief Request HC-RR-I2-W01 | Non-Destructive Examination Weld Overlay Hydrostatic Dissimilar Metal Weld |
ML050030211 | 2 August 2005 | Relief, HC-RR-12-30, MC5174 | Weld Overlay Nondestructive Examination Incorporated by reference |
ML051180344 | 4 May 2005 | Evaluation of Relief Request S2-13-RR-F01 | Incorporated by reference |
ML051150379 | 29 April 2005 | Evaluation of Relief Request S2-13-RR-A06 | Incorporated by reference |
ML042800554 | 6 October 2004 | Request for Additional Information Relief Requests S1-RR-04-V01 and V02 | Stroke time |
ML042010250 | 27 August 2004 | Evaluation of Relief Request HC-RR-12-023 | VT-2 Incorporated by reference Pressure Boundary Leakage |
ML040920361 | 23 April 2004 | Evaluation of Relaxation Request No. S1-RR-13-B22, First Revised Order (EA-03-009) Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors | Nondestructive Examination |
ML032250471 | 26 August 2003 | Evaluation of Relief Request HC-RR-B08 | Incorporated by reference |
ML032090200 | 28 July 2003 | Relief, Relief from ASME Code Requirements Related to the Salem Inservice Inspection Program, Relief Request S1-RR-F01, MB6098 | Nondestructive Examination Incorporated by reference |
ML031420481 | 15 May 2003 | Supplemental Information for Relief Request HC-RR-B11 | EVT-1 |
ML031130004 | 14 April 2003 | Inservice Inspection Program Relief Request HC-RR-B12 | |
ML031130007 | 14 April 2003 | Code Relief, Alternative to Required Volumetric Examination for Nozzles Where Plant Configuration Is Such That Visual Examination of Inner Radius May Be Performed on Essentially 100 Percent of Inner Radius | |
ML030590216 | 20 February 2003 | Inservice Inspection Program Relief Request HC-RR-A02 | |
ML030590207 | 20 February 2003 | Inservice Inspection Program Relief Request HC-RR-A06 | |
ML030590347 | 20 February 2003 | Inservice Inspection Program Relief Request HC-RR-B08 | |
ML030690177 | 20 February 2003 | Inservice Inspection Program Relief Request HC-RR-F02 | |
ML022470409 | 3 February 2003 | Relief, Use of ASME Code Case N-532-1, Alternative Requirements to Repair and Replacement Documentation Requirements and Inservice Summary Report Preparation and Submission, MB6089 | |
ML030160750 | 16 January 2003 | Relief, ASME Code Requirements Related to the Salem Inservice Inspection Program, Relief Request S1-RR-B01 and S1-RR-C01 | Boric Acid Nondestructive Examination VT-2 Incorporated by reference Liquid penetrant Dissimilar Metal Weld |