 Issue dateTitleTopic
ML23125A0618 May 2023Proposed Alternative to the Requirements of the ASME Code
ML23041A42614 February 2023Proposed Alternative to the Requirements of the ASME OM CodeStroke time
Incorporated by reference
ML23033A0983 February 2023Authorization and Safety Evaluation for Alternative Request I6R-09, Revision 0,Nondestructive Examination
Incorporated by reference
ML22332A54921 December 2022Proposed Alternative to the Requirements of the ASME OM CodeIncorporated by reference
Grace period
ML22327A26330 November 2022Authorization and Safety Evaluation for Alternative Request No. I6R-01, Rev. 0VT-2
Pressure Boundary Leakage
ML22256A11529 September 2022Proposed Alternative to the Requirements of the ASME OM CodeIncorporated by reference
ML22265A08628 September 2022Proposed Alternative to the Requirements of the ASME OM CodeStroke time
Incorporated by reference
ML22264A17528 September 2022Proposed Alternative to the Requirements of the ASME OM CodeIncorporated by reference
ML21230A2063 September 2021Proposed Alternative to Use ASME OM Code Case OMN-28Incorporated by reference
ML21216A2205 August 2021Proposed Alternative to Eliminate Certain Documentation Requirements for Pressure Retaining BoltingCoatings
Nondestructive Examination
Incorporated by reference
ML20269A20030 September 2020Request to Use a Provision of Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI (EPID L2020-LLR-0117Incorporated by reference
ML20169A58415 July 2020Relief from the Requirements of the ASME CodeIncorporated by reference
Grace period
ML20113F04130 April 2020Proposed Alternative to the Submittal Schedule for Certain Reports (COVID-19)Incorporated by reference
Pandemic
Coronavirus
COVID-19
ML20099D95517 April 2020Request to Use Provisions in the 2013 Edition of the ASME Boiler and Pressure Vessel Code for Performing Non-Destructive ExaminationsNon-Destructive Examination
Incorporated by reference
ML20036D9624 February 2020Dresden Nuclear Power Station, Nine Mile Point Nuclear Station, Peach Bottom Atomic Power Station, & Quad Cities Nuclear Power Station - Proposed Alternative to Extend Reactor Pressure Vessel Safety Relief Valve Testing FrequencyGrace period
RS-20-006, Submittal of Relief Request for Revision to RV-03 Associated with Fifth Inservice Testing Interval2 January 2020Submittal of Relief Request for Revision to RV-03 Associated with Fifth Inservice Testing IntervalPower-Operated Valves
ML19269C53427 September 2019Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination TechniquesIncorporated by reference
ML19161A2574 June 2019BWR Fleet Msv/Srv - Testing Frequency Relief Request NRC Pre-Application Meeting June 4, 2019Incorporated by reference
ML19098A03430 April 2019Units 1 and 2; Limerick, Units 1 and 2; Peach Bottom, Units 2 and 3, and Quad Cities, Units 1 and 2 - Revision to Approved Alternative to Use BWR Vessel and Internal Proj Guidelins
JAFP-19-0023, Relief Request Associated with the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Piping Welds15 February 2019Relief Request Associated with the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Piping WeldsDissimilar Metal Weld
JAFP-18-0052, Proposed Alternative to Utilize Code Case N-87930 May 2018Proposed Alternative to Utilize Code Case N-879Nondestructive Examination
JAFP-18-0053, Proposed Alternative to Utilize Code Cases N-878 and N-88030 May 2018Proposed Alternative to Utilize Code Cases N-878 and N-880Nondestructive Examination
ML18022A61624 January 2018Approval of Alternatives to the ASME Code Regarding Reactor Vessel Penetration N-11B - Relief Request 15R-11, Revision 3 (CAC No. MF9286; EPID L-2017-LLR-0004) (RS-17-014)Nondestructive Examination
Incorporated by reference
RS-18-004, Additional Information Supporting Reactor Pressure Vessel Penetration N-11B Repair Relief Request I5R-114 January 2018Additional Information Supporting Reactor Pressure Vessel Penetration N-11B Repair Relief Request I5R-11Nondestructive Examination
Dissimilar Metal Weld
ML17221A26425 August 2017Alternative to the Requirements of the ASME Code Regarding Reactor Pressure Vessel Nozzle Assemblies; Relief Request I5R-07 (CAC Nos. MF8989 and MF8990) (RS-16-256)
ML17170A01326 June 2017Proposed Alternative to Eliminate Examination of Threads in Reactor Pressure Vessel Flange (CAC Nos. MF8712-MF8729 and MF9548)
ML16230A2376 September 2016Fleet Request for Proposed Alternative to Use ASME Code Case N-513-4 (CAC Nos. MF7301-MF7322)Incorporated by reference
Through-Wall Leak
ML14055A22728 February 2014Safety Evaluation in Support of Request for Relief Associated with the Fifth 10 Year Interval Inservice Testing Program MF1462Nondestructive Examination
VT-2
Incorporated by reference
Finite Element Analysis
EVT-1
ML12121A63710 May 2012Request to Use Code Case N-789
ML0928602592 February 2010Relief, Alternative to Nozzle to Vessel Weld and Inner Radius ExaminationsIncorporated by reference
ML09077001426 March 2009Request to Partially Implement Subsequent Edition of ASME Code for Operation and Maintenance of Nuclear Power Plants (OM Code), Section ISTC-522, Condition-Monitoring Program & Mandatory Appendix...Incorporated by reference
ML08282017125 November 2008Relief Request No. RV-30G from Main Steam Electrometric Relief Valve 0203-3C Test Interval
ML08133055727 June 2008Dresden/Quad Cities Relief Requests from 5-Year Test Interval for Main Steam Safety ValvesGrace period
ML08098031130 April 2008Relief Request to Use Boiling Water Reactor Vessel & Internals Project Guidelines..Incorporated by reference
EVT-1
ML07313005220 November 2007Relief from 5-Year Test Interval for Main Steam Safety Valves
ML0716300316 August 2007Relief Request 14R-16 to Extend the First Period of the Fourth 10-year Inservice Inspection Interval for Twenty Reactor Pressure Vessel WeldsIncorporated by reference
ML05083031410 May 2005Relief, Relief Request CR-39 for Third 10-Year Inservice Inspection IntervalNondestructive Examination
VT-2
Incorporated by reference
ML04260056319 October 2004Amendments, Main Steam Line Relief Valves and Associated Relief Requests. TAC Nos. MC1792, MC1793, MC1794, and MC1795Non-Destructive Examination
Stroke time
Foreign Material Exclusion
Scaffolding
Power Uprate
ML04033075620 February 2004Relief, Fourth 10-Year Inservice Testing Program IntervalStroke time
Incorporated by reference
ML03356038628 January 2004Fourth 10-Year Interval Inservice Inspection Relief Requests Nos.14R-01 Through 14R-01 Through 14R-09 (TAC Nos. MB7695 Through MB7712)Weld Overlay
Probabilistic Risk Assessment
VT-2
Incorporated by reference
Exemption Request
Dissimilar Metal Weld
RS-03-194, Fourth Interval Inservice Inspection Program Plan10 October 2003Fourth Interval Inservice Inspection Program PlanVT-2
SVP-03-096, Submittal of Proposed Relief Requests to the Requirements of 10 CFR 50.55a Concerning the Fourth Ten-Year Interval Inservice Testing Program11 September 2003Submittal of Proposed Relief Requests to the Requirements of 10 CFR 50.55a Concerning the Fourth Ten-Year Interval Inservice Testing ProgramStroke time
ML03192014824 July 2003Relief Request, Witholding Information from Public Disclosure,
ML03142081828 May 2003Relief Request RV-30E, Inservice Testing Program Relief Regarding Main Steam Electronic Relief Valves and Safety/Relief Valves
RS-03-099, Relief Request for Alternative Reactor Pressure Vessel Circumferential Weld Examinations for Fourth Interval Inservice Inspection Program16 May 2003Relief Request for Alternative Reactor Pressure Vessel Circumferential Weld Examinations for Fourth Interval Inservice Inspection ProgramSafe Shutdown
Non-Destructive Examination
ML0312500188 May 2003Relief, Inservice Testing Program Relief Regarding Main Steam Power Operated Relief Valves, MB8713
RS-03-091, Additional Information Regarding Relief Request RV-30E2 May 2003Additional Information Regarding Relief Request RV-30E
SVP-02-033, Code Relief Request CR-38, Inservice Inspection Program Relief Re 10 Hour Annual Training Requirements of ASME Section XI, 1995 Edition with 1996 Addenda, Appendix VII8 April 2002Code Relief Request CR-38, Inservice Inspection Program Relief Re 10 Hour Annual Training Requirements of ASME Section XI, 1995 Edition with 1996 Addenda, Appendix VII
ML02042001521 February 2002Relief Request CR-37, Inservice Inspection Program Relief Regarding Examination of Pressure Retaining Welds in Piping Subject to Appendix Viii, Supplement 11Weld Overlay
Incorporated by reference
SVP-02-001, Request for Code Relief, Examination of Pressure Retaining Welds in Piping Subject to Appendix Viii, Supplement 11, Examination4 January 2002Request for Code Relief, Examination of Pressure Retaining Welds in Piping Subject to Appendix Viii, Supplement 11, ExaminationWeld Overlay