RS-03-091, Additional Information Regarding Relief Request RV-30E

From kanterella
Jump to navigation Jump to search
Additional Information Regarding Relief Request RV-30E
ML031340436
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 05/02/2003
From: Simpson P
Exelon Generation Co, Exelon Nuclear
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RS-03-091
Download: ML031340436 (2)


Text

Exe I an,M Exelon Generation www.exeloncorp.com Nuclear 4300 Winfield Road Warrenville, IL60555 RS-03-091 May 2, 2003 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Quad Cities Nuclear Power Station, Units 1 and 2 Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265

Subject:

Additional Information Regarding Relief Request RV-30E

Reference:

Letter from P. R. Simpson (Exelon Generation Company, LLC) to U. S. NRC, "Request for Amendment to Technical Specifications Surveillance Requirements for the Main Steam Line Relief Valves and Relief Request RV-30E," dated May 1, 2003 In the referenced letter, Exelon Generation Company, LLC (EGC) requested an amendment to Facility Operating License Nos. DPR-29 and DPR-30 for Quad Cities Nuclear Power Station (QCNPS), Units 1 and 2 and also transmitted Relief Request RV-30E. The relief request provides an alternative to the requirement of the American Society of Mechanical Engineers (ASME)/American National Standards Institute (ANSI), Operation and Maintenance of Nuclear Power Plants, OM-1987, Part 1, Section 3.4.1.1(d) to remotely actuate the ERVs and S/RVs following installation or maintenance.

In reviewing this relief request, EGC determined that an additional statement should be added to the section of the relief request entitled, Duration of Proposed Alternative." This section in the referenced letter discussed only the requested duration for QCNPS, Unit 2. EGC also requests that this relief be approved for the duration of the third ten-year inservice testing interval for Unit 1, which ends on February 18, 2004.

If you have any questions or require additional information, please contact Mr. Kenneth M. Nicely at (630) 657-2803.

Respectfully, Patrick R. Simpson Manager - Licensing Mid-West Regional Operating Group

- AD+~~'4

- -w May 2, 2003 U. S. Nuclear Regulatory Commission Page 2 cc: Regional Administrator - NRC Region Il NRC Senior Resident Inspector - Quad Cities Nuclear Power Station Office of Nuclear Facility Safety - Illinois Department of Nuclear Safety