 Issue dateTitleTopic
ML23278A12914 December 2023Units 1 & 2; Limerick, Units 1 & 2; Nine Mile Point, Units 1 & 2; and Peach Bottom, Units 2 & 3 -Revision to Approved Alternatives to Use Boiling Water Reactor Vessel and Internals Project Guidelines
ML21299A00328 October 2021and Waterford Steam Electric Station, Unit 3 - Approval of Request for Alternative EN-20-RR-003 from Certain Requirements of the ASME Code
ML21230A2063 September 2021Proposed Alternative to Use ASME OM Code Case OMN-28Incorporated by reference
ML21216A2205 August 2021Proposed Alternative to Eliminate Certain Documentation Requirements for Pressure Retaining BoltingCoatings
Nondestructive Examination
Incorporated by reference
ML21054A33024 February 2021Approval of Alternative IP3-ISI-RR-16 to American Society of Mechanical Engineers Code Case N-513-4 Inspection RequirementTime of Discovery
Nondestructive Examination
VT-2
Through-Wall Leak
ML20269A20030 September 2020Request to Use a Provision of Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI (EPID L2020-LLR-0117Incorporated by reference
CNRO-2020-00016, Entergy Nuclear Operations, Inc - Relief Request EN-RR-20-002: Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv)12 August 2020Entergy Nuclear Operations, Inc - Relief Request EN-RR-20-002: Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv)Nondestructive Examination
Incorporated by reference
ML20099D95517 April 2020Request to Use Provisions in the 2013 Edition of the ASME Boiler and Pressure Vessel Code for Performing Non-Destructive ExaminationsNon-Destructive Examination
Incorporated by reference
ML19269C53427 September 2019Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination TechniquesIncorporated by reference
ML19254A60319 September 2019Units 2 and 3; Palisades Nuclear Plant; River Bend; and Waterford Steam Electric Station, Unit 3 - Relief Request No. EN-19-RR-1, Use of ASME Code Case N-831-1
ML19135A44421 June 2019Issuance of Relief Request I4R-22 Relief from the Requirements of the ASME CodeWeld Overlay
VT-2
Incorporated by reference
Liquid penetrant
Dissimilar Metal Weld
ML19161A2574 June 2019BWR Fleet Msv/Srv - Testing Frequency Relief Request NRC Pre-Application Meeting June 4, 2019Incorporated by reference
ML19098A03430 April 2019Units 1 and 2; Limerick, Units 1 and 2; Peach Bottom, Units 2 and 3, and Quad Cities, Units 1 and 2 - Revision to Approved Alternative to Use BWR Vessel and Internal Proj Guidelins
ML19039A14925 February 2019Issuance of Relief Request IP3-ISI-RR-14 Alternative Examination Required by ASME Code Case N-724-4Incorporated by reference
Dissimilar Metal Weld
DM weld
JAFP-19-0023, Relief Request Associated with the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Piping Welds15 February 2019Relief Request Associated with the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Piping WeldsDissimilar Metal Weld
CNRO-2019-00002, Relief Request Number EN-19-RR-1, Proposed Alternative to Use ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 131 January 2019Relief Request Number EN-19-RR-1, Proposed Alternative to Use ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 1Nondestructive Examination
Dissimilar Metal Weld
ML18251A00418 September 2018Safety Evaluation for Relief Request IP3-ISI-RR-11, RR-12, RR-15 Approval of Alternative Associated with Extension of Fourth Interval Reactor Vessel and Piping Weld Inspections (EPID: L-2017-LLR-0124,0127)Probabilistic Risk Assessment
Large early release frequency
DM weld
JAFP-18-0076, End of Interval Relief Request Associated with the Fourth Ten-Year Lnservice Inspection (ISI) Interval26 July 2018End of Interval Relief Request Associated with the Fourth Ten-Year Lnservice Inspection (ISI) IntervalNon-Destructive Examination
VT-2
ML18193B03018 July 2018Safety Evaluation for Relief Request IP3-ISI-RR-13 Fourth Ten-year Inservice Inspection Interval ExtensionNon-Destructive Examination
ML18128A0678 June 2018Arkansas, Units 1 and 2; Grand Gulf, Unit 1; Indian Point Unit Nos. 2 and 3; Palisades; Pilgrim; River Bend Station, Unit 1; and Waterford, Unit-3 Relief Request No. EN-17-RR-1, Alternative to Use ASME Code Case N-513-4Incorporated by reference
Through-Wall Leak
Through-Wall Leakage
JAFP-18-0052, Proposed Alternative to Utilize Code Case N-87930 May 2018Proposed Alternative to Utilize Code Case N-879Nondestructive Examination
JAFP-18-0053, Proposed Alternative to Utilize Code Cases N-878 and N-88030 May 2018Proposed Alternative to Utilize Code Cases N-878 and N-880Nondestructive Examination
ML18039A85430 May 2018Relief Requests I5R-02, I5R-03, I5R-04 from ASME Code Requirements for Reactor Vessel Internals, Ferretic Piping Repair/Replacement, and RPV Flange Welds, 5th 10-Year Inservice Inspection Interval (MG0116-MG0118; L-2017-LLR-0083 to 0085)Hydrostatic
Nondestructive Examination
Incorporated by reference
EVT-1
Dissimilar Metal Weld
ML18044A99313 April 2018Request for Alternatives PRR-01, PRR-02, PRR-04, VRR-02, VRR-03, and VRR-04 from ASME OM Code Requirements for Various Pumps and Valves, Fifth 10-Year Inservice Testing Interval (CAC MG0052-MG0061; EPID L-2017-LLR-0067 to L-2017-LLR-0074)Stroke time
Incorporated by reference
Grace period
ML18099A3739 April 201804/09/2018 E-mail from R. Guzman to R. Walpole, Verbal Authorization for Relief Request IP2-ISI-RR-06
ML18059A1566 March 2018Safety Evaluation for Relief Request IP2-ISI-RR-05 Alternative Examination Volume Required by ASME Code Case N-729-4Locked High Radiation Area
ML18005A06623 January 2018Safety Evaluation of Relief Requests ISI-RR-20, ISI-RR-21, and ISI-RR-22 Regarding the Fourth 10-Year Interval of the Inservice Inspection ProgramVT-2
Incorporated by reference
Pressure Boundary Leakage
ML17289A07512 December 2017Issuance of Relief Request for Proposed Alternative to Use ASME Code Case N-789-1 (CAC No. MF9692; EPID L-2017-LLR-0027) Note Correction Safety Evaluation See ML18003B382Incorporated by reference
Liquid penetrant
ML17219A42811 December 2017Issuance of Relief Request-Alternative to Certain Requirements of the ASME Code Regarding Use of ASME Code Case N-513-4 (CAC No. MF9641; EPID L-2017-LLR-0023)Through-Wall Leak
CNRO-2017-00022, Relief Request Number EN-17-RR-1 - Proposed Alternative to Use ASME Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate-Energy Class 2 or 3 Piping, Section XI, Division 117 November 2017Relief Request Number EN-17-RR-1 - Proposed Alternative to Use ASME Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate-Energy Class 2 or 3 Piping, Section XI, Division 1Nondestructive Examination
Finite Element Analysis
Through-Wall Leak
ML17223A28010 August 2017Submittal of Relief Requests Associated with the Fifth Lnservice Inspection (ISI) IntervalHydrostatic
Nondestructive Examination
VT-2
Incorporated by reference
Finite Element Analysis
Earthquake
EVT-1
Liquid penetrant
Dissimilar Metal Weld
DM weld
Weak link
ML17174B14412 July 2017Relief Request for EN-ISI-16-1 Regarding Use of Later Edition and Addenda of the ASME CodeNondestructive Examination
Incorporated by reference
Dissimilar Metal Weld
ML17093A89412 May 2017Pilgrim Nuclear Power Station - Relief Requests PNPS-ISI-001 and PNPS-ISI-002, Relief from ASME Code Volumetric Examination Requirements for the Fourth 10-Year Inservice Inspection Interval (CAC Nos. MF8092 and MF8093)
ML17090A16812 April 2017Alternative to ASME Code Requirements for Weld Overlay RepairWeld Overlay
Hydrostatic
Nondestructive Examination
Finite Element Analysis
Liquid penetrant
Dissimilar Metal Weld
ML17069A28316 March 2017Relief Request No. IP3-ISI-RR-09, for Alternative to the Depth Sizing Qualification RequirementIncorporated by reference
DM weld
ML16358A44411 January 2017Relief from the Requirements of the ASME Code Regarding Alternate IP3-RR-10 to the Full Circumferential Inspection Requirement of Code Case N-513-3Through-Wall Leak
ML16355A4296 January 2017Relief Request for Proposed Alternative for the Implementation of BWRVIP-05Incorporated by reference
ML16334A4406 December 2016Relief from the Requirements of the ASME Code Case N-702 and BWRVIP-241 for Plant Nozzle-to-Vessel Welds and Nozzle Inner Radii
ML16270A0463 October 2016Acceptance of Requested Licensing Action Relief Request for Proposed Alternative for the Implementation of BWRVIP-05
ML16257A57315 September 2016Issuance of Relief Request No. PRR-52-Relief from ASME Code, Section XI Requirements for Pressure Testing of Class 1 Pressure Retaining Components as a Result of Repair/Replacement Activity and Use of Code Case N-795Hydrostatic
Nondestructive Examination
VT-2
Incorporated by reference
Through Wall Leak
ML16253A34114 September 2016Acceptance of Requested Licensing Action Relief Request for Plant Nozzle-to-Vessel Welds and Nozzle Inner Radii Using ASME Code Case N-702 and BWRVIP-241
ML16194A3264 August 2016Issuance of Relief Request No. PRR-53 - Relief from ASME Code, Section XI Requirements for Ultrasonic Inspection Qualifications of Weld OverlaysWeld Overlay
Incorporated by reference
ML16167A08115 July 2016Request for Alternative IP2-ISI-RR-03 to Weld Reference System Examination Required by ASME Code Subarticle IWA-2600Incorporated by reference
ML16180A28929 June 2016Inservice Inspection Program Alternative for Safety Relief ValvesVT-2
Pressure Boundary Leakage
ML16096A2696 June 2016Arkansas; Grand Gulf; James A. Fitzpatrick; Indian Point; Palisades; Pilgrim; River Bend; and Waterford - Relief Request RR-EN-15-2, Proposed Alternative to Use ASME Boiler and Pressure Vessel Code Case N-786-1Functionality Assessment
Liquid penetrant
ML16077A35222 March 2016Withdrawal of Relief Request No. 19 from the Fourth Inservice Inspection Interval
ML16042A29115 March 2016Issuance of Proposed Alternative Relief Request PRR-51, Relief from the Requirements of the ASME CodeIncorporated by reference
Pressure and Temperature Limits Report
ML16053A0253 March 2016IP2-ISI-44-18, Relief from the Requirements of the ASME CodeIncorporated by reference
Dissimilar Metal Weld
ML16057A17716 February 2016Supplement to Request for Approval of Pilgrim Relief Request (PRR)-52, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2) Pressure Testing of Mechanical Joints as a Result of Performance of a Repair/Replacement Activity and Use of
ML15338A3095 January 2016Relief Request PRR-50, Relief from the Requirement of the ASME Code, Implementation of Code Case N-702Nondestructive Examination
Incorporated by reference