 Issue dateTitleTopic
NL-21-029, Offsite Dose Calculation Manual (Odcm), Revision 530 April 2021Offsite Dose Calculation Manual (Odcm), Revision 5Time of Discovery
Grab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Annual Radiological Effluent Release Report
Power change
NL-21-006, Relief Request IP3-ISI-RR-16, Proposed Alternative to American Society of Mechanical Engineers Code Case N-513-4 Inspection Requirement10 February 2021Relief Request IP3-ISI-RR-16, Proposed Alternative to American Society of Mechanical Engineers Code Case N-513-4 Inspection RequirementTime of Discovery
Coatings
Nondestructive Examination
VT-2
Finite Element Analysis
Through Wall Leak
Through-Wall Leakage
ML16314E5987 November 2016IP-CALC-16-00079, Rev. 0, Evaluation of Leak on Weld 8297 on 31 Fan Cooler Unit Return Line.Scaffolding
NL-16-133, Indian Point, Unit 3, IP-CALC-16-00079, Rev. 0, Evaluation of Leak on Weld 8297 on 31 Fan Cooler Unit Return Line.7 November 2016Indian Point, Unit 3, IP-CALC-16-00079, Rev. 0, Evaluation of Leak on Weld 8297 on 31 Fan Cooler Unit Return Line.Scaffolding
NL-14-122, Indian Point, Unit 2 - Calculation IP-CALC-14-00028, Rev. 0, Station Battery 22 System Calculation - Analysis Variation with an Battery Aged to 80% Capaciy, Part 1 of 215 September 2014Indian Point, Unit 2 - Calculation IP-CALC-14-00028, Rev. 0, Station Battery 22 System Calculation - Analysis Variation with an Battery Aged to 80% Capaciy, Part 1 of 2Battery sizing
ML14268A35515 September 2014Calculation IP-CALC-14-00028, Rev. 0, Station Battery 22 System Calculation - Analysis Variation with an Battery Aged to 80% Capaciy, Part 2 of 2
ML14268A35415 September 2014Calculation IP-CALC-14-00028, Rev. 0, Station Battery 22 System Calculation - Analysis Variation with an Battery Aged to 80% Capaciy, Part 1 of 2Battery sizing
ML14259A32815 September 2014Enclosure to NL-14-122 - Calculation IP-CALC-14-00028-Station Battery 22 System Calculation Analysis Variation with an Battery Aged to 80% Capacity (Calculation FEX-000204-01 Rev 1 Is Also Included for Reference Purposes)
NL-14-122, Indian Point, Unit 2 - Calculation IP-CALC-14-00028, Rev. 0, Station Battery 22 System Calculation - Analysis Variation with an Battery Aged to 80% Capaciy, Part 2 of 215 September 2014Indian Point, Unit 2 - Calculation IP-CALC-14-00028, Rev. 0, Station Battery 22 System Calculation - Analysis Variation with an Battery Aged to 80% Capaciy, Part 2 of 2
ML14268A3562 September 2014Calculation FEX-00204, Rev. 1, Station Battery 22 System Calculation, Part 1 of 2Battery sizing
NL-14-122, Indian Point, Unit 2 - Calculation FEX-00204, Rev. 1, Station Battery 22 System Calculation, Part 1 of 22 September 2014Indian Point, Unit 2 - Calculation FEX-00204, Rev. 1, Station Battery 22 System Calculation, Part 1 of 2Battery sizing
NL-14-122, Calculation FEX-00204, Rev. 1, Station Battery 22 System Calculation, Part 2 of 22 September 2014Calculation FEX-00204, Rev. 1, Station Battery 22 System Calculation, Part 2 of 2
ML13329A42614 November 2013Enclosure 3 to NL-13-147: IP-CALC-13-00063, Rev. 2, Hydraulic Evaluation of Identified Indication in IP3 Service Water 10 Line #1093.
ML13329A42530 October 2013Enclosure 2 to NL-13-147: IP-CALC-13-00070, Rev. 1, Leak Repair Clamp Evaluation for Line 1093 in 32 Main Transformer Moat.
ML13329A42430 October 2013Enclosure 1 to NL-13-147: IP-CALC-13-00062, Rev. 1, Evaluation of Leak at Line 1093 in Unit 3 Moat.Through-Wall Leak
ML17104A04119 April 2013IP-CALC-13-00005, Rev. 1, Engineering Evaluation of Postulated RWST Inventory Loss During the Reverse Osmosis Clean-up Skid Process in Accordance to 2-TAP-001-ROS Due to a Seismic EventBoric Acid
Anchor Darling
ML13116A0089 April 2013Engineering Evaluation of Postulated RWST Inventory Loss During the Reverse Osmosis Clean-up Skid Process in Accordance to 2-TAP-001-ROS Due to Seismic EventBoric Acid
Anchor Darling
ML13157A13329 August 2012Enclosure 2 to NL-13-028 - Offsite Dose Calculation Manual Rev. 4Time of Discovery
Grab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Annual Radiological Effluent Release Report
Power change
ML12234A25214 February 2012Enclosure 2, IP3-CALC-EG-00217, Emergency Diesel Generator Storage Tank Level Setpoints, Rev. 5Hydrostatic
Design basis earthquake
ML12234A2518 February 2012Enclosure 1, IP-CALC-11-00058, IP3 Emergency Diesel Generator (EDG) Fuel Oil Consumption Licensing Basis Calculation, Rev 1
ML12060A3246 February 2012IP-CALC-10-00121, Revision 1, Backup Spent Fuel Pool Cooling System (Bsfpcs) Heat Removal Capability.
ML17104A04216 November 2011IP-CALC-11-00091 AST Analysis of IP2 to Address the Impact of Containment Sump Solution Bazk-Leakage to the RWST After LOCABoric Acid
ML13239A47925 July 2011Nuclear Safety Advisory Letter NSL-11-5, Westinghouse LOCA Mass & Energy Release Calculation Issues.Ultimate heat sink
ML11258A11620 June 2011Email from M. Halter, Subj: Part 21 - Kasi MOV and AOV Software, (44 Pages)Hydrostatic
Finite Element Analysis
Power-Operated Valves
ML12132A12318 January 2011Enclosure 2 to NL-12-020 - Offsite Dose Calculation Manual Rev. 3Time of Discovery
Grab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Annual Radiological Effluent Release Report
Power change
ML09342001427 August 2009Enclosure 1 to NL-09-129, Calculation IP3-CALC-ED-00207, Revision 8, 480V Buses 2A, 3A, 5A & 6A and Edg'S 31, 32 and 33 Accident Loading.Boric Acid
Stroke time
NL-09-045, Indian Point, Units 1, 2, & 3, Offsite Dose Calculation Manual Changes and Justification Packages for 200817 April 2009Indian Point, Units 1, 2, & 3, Offsite Dose Calculation Manual Changes and Justification Packages for 2008Grab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Annual Radiological Effluent Release Report
Power change
ML09126021117 April 2009Offsite Dose Calculation Manual Changes and Justification Packages for 2008Grab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Annual Radiological Effluent Release Report
Power change
ML09054015730 June 2008ODCM Part II - Appendix J, Groundwater Flow and Offsite Dose Calculation Details
ML09301053328 March 2008Calculation No. FEX-00204-01, Station Battery 22 System Calculation, Enclosure 2 to NL-09-128
ML07130053617 January 2007E-Mail from S. Sandike of Entergy to J. Noggle of USNRC, Regarding RG-1.109 Dose Calc on Roseton Fish
NL-06-056, Offsite Dose Calculation Manual (ODCM)15 May 2006Offsite Dose Calculation Manual (ODCM)Grab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Power change
ML0613204139 March 2006E-mail from D. Croulet of Entergy to J. Noggle of USNRC, Regarding March 8 IPEC Gw&Sw Dose.DocOffsite Dose Calculation Manual
ML0617802968 March 2006E-mail from D. Croulet of Entergy to Various, Regarding IPEC Groundwater and Stormwater Dose.Pdf
ML09050007031 December 2005GZA - Groundwater and Tritium Flux from Catchments Calculation
ML06090064517 October 2005Jaf Environmental Laboratory, Tritium Activity Calculation
ML09301036326 August 2005Attachment K to NL-09-128, Cell Sizing Worksheet, Revised PagesBattery sizing
Reverse polarity
ML09301036226 August 2005Calculation No. FEX-000204-00, Rev 0, Load Tabulation, Attachment J to NL-09-128
ML05277053319 August 2005Offsite Dose Calculation Manual, Rev. 9Time of Discovery
Grab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Power change
NL-05-026, Additional Information Regarding Indian Point, Unit 3 License Amendment Request Alternate Source Term22 February 2005Additional Information Regarding Indian Point, Unit 3 License Amendment Request Alternate Source Term
ML05003006122 December 2004Psat 3056CT.QA.04, Calculation Component Effect of Indian Point 3 Engineered Safety Feature Leakage Iodine Release with Boundary Layer, Revision 1
ML04357038315 December 2004Enclosure B to NL-04-156, Engineering Standards Manual IES-3B, Rev 0, Instrument Loop Accuracy and Setpoint Calculation Methodology (P3)Anticipated operational occurrence
Post Accident Monitoring
Hydrostatic
Grace period
NL-04-145, Supporting Information for License Amendment Request Regarding Indian Point 3 Stretch Power Uprate18 November 2004Supporting Information for License Amendment Request Regarding Indian Point 3 Stretch Power UprateSafe Shutdown
Non-Destructive Examination
Fire Barrier
Time to boil
Hydrostatic
Coatings
Operating Basis Earthquake
Nondestructive Examination
Operability Determination
Power-Operated Valves
Fuel cladding
Fire Protection Program
Coast down
Power Uprate
Stretch Power Uprate
Measurement Uncertainty Recapture
Affidavit
ML08120025815 September 2003Condition Monitoring & Operational Assessment RFO-15 SG-SGDA-02-45 September 2003 Westinghouse Electric Co