Category:Calculation
MONTHYEARNL-21-029, Offsite Dose Calculation Manual (Odcm), Revision 52021-04-30030 April 2021 Offsite Dose Calculation Manual (Odcm), Revision 5 NL-21-006, Relief Request IP3-ISI-RR-16, Proposed Alternative to American Society of Mechanical Engineers Code Case N-513-4 Inspection Requirement2021-02-10010 February 2021 Relief Request IP3-ISI-RR-16, Proposed Alternative to American Society of Mechanical Engineers Code Case N-513-4 Inspection Requirement ML16314E5982016-11-0707 November 2016 IP-CALC-16-00079, Rev. 0, Evaluation of Leak on Weld 8297 on 31 Fan Cooler Unit Return Line. NL-16-133, Indian Point, Unit 3, IP-CALC-16-00079, Rev. 0, Evaluation of Leak on Weld 8297 on 31 Fan Cooler Unit Return Line.2016-11-0707 November 2016 Indian Point, Unit 3, IP-CALC-16-00079, Rev. 0, Evaluation of Leak on Weld 8297 on 31 Fan Cooler Unit Return Line. NL-14-122, Indian Point, Unit 2 - Calculation IP-CALC-14-00028, Rev. 0, Station Battery 22 System Calculation - Analysis Variation with an Battery Aged to 80% Capaciy, Part 1 of 22014-09-15015 September 2014 Indian Point, Unit 2 - Calculation IP-CALC-14-00028, Rev. 0, Station Battery 22 System Calculation - Analysis Variation with an Battery Aged to 80% Capaciy, Part 1 of 2 ML14268A3552014-09-15015 September 2014 Calculation IP-CALC-14-00028, Rev. 0, Station Battery 22 System Calculation - Analysis Variation with an Battery Aged to 80% Capaciy, Part 2 of 2 ML14268A3542014-09-15015 September 2014 Calculation IP-CALC-14-00028, Rev. 0, Station Battery 22 System Calculation - Analysis Variation with an Battery Aged to 80% Capaciy, Part 1 of 2 ML14259A3282014-09-15015 September 2014 Enclosure to NL-14-122 - Calculation IP-CALC-14-00028-Station Battery 22 System Calculation Analysis Variation with an Battery Aged to 80% Capacity (Calculation FEX-000204-01 Rev 1 Is Also Included for Reference Purposes) NL-14-122, Indian Point, Unit 2 - Calculation IP-CALC-14-00028, Rev. 0, Station Battery 22 System Calculation - Analysis Variation with an Battery Aged to 80% Capaciy, Part 2 of 22014-09-15015 September 2014 Indian Point, Unit 2 - Calculation IP-CALC-14-00028, Rev. 0, Station Battery 22 System Calculation - Analysis Variation with an Battery Aged to 80% Capaciy, Part 2 of 2 ML14268A3562014-09-0202 September 2014 Calculation FEX-00204, Rev. 1, Station Battery 22 System Calculation, Part 1 of 2 NL-14-122, Indian Point, Unit 2 - Calculation FEX-00204, Rev. 1, Station Battery 22 System Calculation, Part 1 of 22014-09-0202 September 2014 Indian Point, Unit 2 - Calculation FEX-00204, Rev. 1, Station Battery 22 System Calculation, Part 1 of 2 NL-14-122, Calculation FEX-00204, Rev. 1, Station Battery 22 System Calculation, Part 2 of 22014-09-0202 September 2014 Calculation FEX-00204, Rev. 1, Station Battery 22 System Calculation, Part 2 of 2 ML13329A4262013-11-14014 November 2013 Enclosure 3 to NL-13-147: IP-CALC-13-00063, Rev. 2, Hydraulic Evaluation of Identified Indication in IP3 Service Water 10 Line #1093. ML13329A4252013-10-30030 October 2013 Enclosure 2 to NL-13-147: IP-CALC-13-00070, Rev. 1, Leak Repair Clamp Evaluation for Line 1093 in 32 Main Transformer Moat. ML13329A4242013-10-30030 October 2013 Enclosure 1 to NL-13-147: IP-CALC-13-00062, Rev. 1, Evaluation of Leak at Line 1093 in Unit 3 Moat. ML17104A0412013-04-19019 April 2013 IP-CALC-13-00005, Rev. 1, Engineering Evaluation of Postulated RWST Inventory Loss During the Reverse Osmosis Clean-up Skid Process in Accordance to 2-TAP-001-ROS Due to a Seismic Event ML13116A0082013-04-0909 April 2013 Engineering Evaluation of Postulated RWST Inventory Loss During the Reverse Osmosis Clean-up Skid Process in Accordance to 2-TAP-001-ROS Due to Seismic Event ML13157A1332012-08-29029 August 2012 Enclosure 2 to NL-13-028 - Offsite Dose Calculation Manual Rev. 4 ML12234A2522012-02-14014 February 2012 Enclosure 2, IP3-CALC-EG-00217, Emergency Diesel Generator Storage Tank Level Setpoints, Rev. 5 ML12234A2512012-02-0808 February 2012 Enclosure 1, IP-CALC-11-00058, IP3 Emergency Diesel Generator (EDG) Fuel Oil Consumption Licensing Basis Calculation, Rev 1 ML12060A3242012-02-0606 February 2012 IP-CALC-10-00121, Revision 1, Backup Spent Fuel Pool Cooling System (Bsfpcs) Heat Removal Capability. ML17104A0422011-11-16016 November 2011 IP-CALC-11-00091 AST Analysis of IP2 to Address the Impact of Containment Sump Solution Bazk-Leakage to the RWST After LOCA ML13239A4792011-07-25025 July 2011 Nuclear Safety Advisory Letter NSL-11-5, Westinghouse LOCA Mass & Energy Release Calculation Issues. ML11258A1162011-06-20020 June 2011 Email from M. Halter, Subj: Part 21 - Kasi MOV and AOV Software, (44 Pages) ML12132A1232011-01-18018 January 2011 Enclosure 2 to NL-12-020 - Offsite Dose Calculation Manual Rev. 3 ML0934200142009-08-27027 August 2009 Enclosure 1 to NL-09-129, Calculation IP3-CALC-ED-00207, Revision 8, 480V Buses 2A, 3A, 5A & 6A and Edg'S 31, 32 and 33 Accident Loading. NL-09-045, Indian Point, Units 1, 2, & 3, Offsite Dose Calculation Manual Changes and Justification Packages for 20082009-04-17017 April 2009 Indian Point, Units 1, 2, & 3, Offsite Dose Calculation Manual Changes and Justification Packages for 2008 ML0912602112009-04-17017 April 2009 Offsite Dose Calculation Manual Changes and Justification Packages for 2008 ML0905401572008-06-30030 June 2008 ODCM Part II - Appendix J, Groundwater Flow and Offsite Dose Calculation Details ML0930105332008-03-28028 March 2008 Calculation No. FEX-00204-01, Station Battery 22 System Calculation, Enclosure 2 to NL-09-128 ML0713005362007-01-17017 January 2007 E-Mail from S. Sandike of Entergy to J. Noggle of USNRC, Regarding RG-1.109 Dose Calc on Roseton Fish NL-06-056, Offsite Dose Calculation Manual (ODCM)2006-05-15015 May 2006 Offsite Dose Calculation Manual (ODCM) ML0613204132006-03-0909 March 2006 E-mail from D. Croulet of Entergy to J. Noggle of USNRC, Regarding March 8 IPEC Gw&Sw Dose.Doc ML0617802962006-03-0808 March 2006 E-mail from D. Croulet of Entergy to Various, Regarding IPEC Groundwater and Stormwater Dose.Pdf ML0905000702005-12-31031 December 2005 GZA - Groundwater and Tritium Flux from Catchments Calculation ML0609006452005-10-17017 October 2005 Jaf Environmental Laboratory, Tritium Activity Calculation ML0930103632005-08-26026 August 2005 Attachment K to NL-09-128, Cell Sizing Worksheet, Revised Pages ML0930103622005-08-26026 August 2005 Calculation No. FEX-000204-00, Rev 0, Load Tabulation, Attachment J to NL-09-128 ML0527705332005-08-19019 August 2005 Offsite Dose Calculation Manual, Rev. 9 NL-05-026, Additional Information Regarding Indian Point, Unit 3 License Amendment Request Alternate Source Term2005-02-22022 February 2005 Additional Information Regarding Indian Point, Unit 3 License Amendment Request Alternate Source Term ML0500300612004-12-22022 December 2004 Psat 3056CT.QA.04, Calculation Component Effect of Indian Point 3 Engineered Safety Feature Leakage Iodine Release with Boundary Layer, Revision 1 ML0435703832004-12-15015 December 2004 Enclosure B to NL-04-156, Engineering Standards Manual IES-3B, Rev 0, Instrument Loop Accuracy and Setpoint Calculation Methodology (P3) NL-04-145, Supporting Information for License Amendment Request Regarding Indian Point 3 Stretch Power Uprate2004-11-18018 November 2004 Supporting Information for License Amendment Request Regarding Indian Point 3 Stretch Power Uprate ML0812002582003-09-15015 September 2003 Condition Monitoring & Operational Assessment RFO-15 SG-SGDA-02-45 September 2003 Westinghouse Electric Co 2021-04-30
[Table view] Category:E-Mail
MONTHYEARML23341A2002023-12-0707 December 2023 Email - Indian Point Energy Center Generating Units 1, 2, and 3 Implementation Notice of Amendment No. 67, 300 and 276 to Independent Spent Fuel Storage Installation Only Emergency Plan (Ioep) ML23332A0802023-11-0808 November 2023 Email from State of New York on the Revised License Amendment for Indian Point Energy Center ISFSI Only Emergency Plan ML23325A1632023-11-0808 November 2023 State of New York Comments on the Revised License Amendment for Indian Point Unit 2 and 3 Technical Specification Changes Reflecting Permanent Removal of Spent Fuel ML23331A9542023-11-0808 November 2023 Email - State of New York Comments on the Revised License Amendment for Indian Point Unit 2 and 3 Technical Specification Changes Reflecting Permanent Removal of Spent Fuel ML23144A3452023-05-25025 May 2023 Adam Kahn of Monsey, New York Email Against Treated Water Release from Indian Point Site ML23144A3442023-05-25025 May 2023 Peggy Kurtz of Rockland County, New York Email Against Treated Water Release from Indian Point Site ML23144A3392023-05-25025 May 2023 David Morris of New City, New York Email Against Treated Water Release from Indian Point Site ML23144A3502023-05-25025 May 2023 Dan Kwilecki of Montebello, New York Email Against Treated Water Release from Indian Point Site ML23144A3422023-05-25025 May 2023 Peter Duda of Pearl River, New York Email Against Treated Water Release from Indian Point Site ML23144A3382023-05-25025 May 2023 Dawn Giambalvo of Jersey City, New Jersey Email Against Treated Water Release from Indian Point Site ML23136B1622023-05-15015 May 2023 Town of North Salem, County of Westchester, New York Board Resolution Letter Regarding Treated Water Release from Indian Point Site ML23109A0632023-04-17017 April 2023 Email Acceptance Review for IP2 and IP3 Amended Facility License and Technical Specification to Reflect Permanent Removal of Spent Fuel from Spent Fuel Pits ML23055A1112023-02-23023 February 2023 Alyse Peterson Email- NYSERDA No Comments on Indian Point Unit 2 - Regarding Holtec License Amendment Request to Revise Permanently Defueled Technical Specifications and Staffing Requirements with Spent Fuel Transfer to ISFSI (Dockets 50-24 ML23049A0032023-02-14014 February 2023 NRC Acceptance Email to Holtec for License Amendment Request for Approval of New ISFSI-Only Emergency Plan and Associated EAL Scheme ML22313A1682022-11-0909 November 2022 NRC Response to Updates to the Proposed Amended IP2 Master Trust ML22308A0912022-11-0303 November 2022 Email Acknowledgement for IP2 and IP3 Amended Facility License and Technical Specification to Reflect Permanent Removal of Spent Fuel from Spent Fuel Pits ML22276A1642022-09-29029 September 2022 New York State Revised Draft EA Response E-Mail ML22271A8492022-09-28028 September 2022 E-Mail Transmitting Revised Indian Point Exemption Draft EA ML22269A3452022-09-22022 September 2022 Email Objection to Holtec IP2 Master Decommissioning Trust Agreement for Indian Point Nuclear Generating Facility Unit 1 and 2, EPID L-2022-LLA-0072 ML22259A1992022-09-0202 September 2022 Acceptance for License Amendment Request to Modify Staffing Requirements Following SFP Transfer to Dry Storage ML22265A0142022-08-31031 August 2022 Email Acknowledgement for Amended and Restated Holtec IP3 Master Decommissioning Trust Agreement for Indian Point Nuclear Generating Facility Unit 3 ML22242A2592022-08-19019 August 2022 E-mail from K. Sturzebecher, NRC, to B. Noval, HDI, Acknowledgement for Amended and Restated Holtec IP2 Master Decommissioning Trust Agreement for Indian Point Nuclear Generating Facility Unit 1 and 2 ML22228A1332022-08-0909 August 2022 Acknowledgement for License Amendment Request to Modify Staffing Requirements Following SFP Transfer to Dry Storage ML22215A0432022-08-0101 August 2022 E-Mail Transmitting NYS NSA Exemption Comments & Draft EA Review Completion ML22208A0292022-07-19019 July 2022 E-Mail Transmitting Indian Point Exemption Draft EA ML22168A0072022-06-16016 June 2022 Acceptance Review for License Amendment Request to Revise License Condition to Eliminate Cyber Security Plan Requirements ML22112A0102022-04-21021 April 2022 Acceptance Review: Request for Exemption from 10 CFR 50.54(w)(1) Concerning Indian Point Energy Center Onsite Property Damage Insurance ML22112A0122022-04-21021 April 2022 Acceptance Review: Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance for Indian Point Energy Center ML22103A2432022-04-13013 April 2022 E-mail - Request for Additional Information - License Amendment Request to Revise Emergency Plan and Emergency Action Level Scheme for Permanently Defueled Condition for Indian Point Energy Center ML22104A0342022-04-13013 April 2022 E-mail from Z. Cruz, NRC to J. Fleming, Holtec - Request for Additional Information Related to Request for Exemption from Portions of 10 CFR 50.47 and Part 50 Appendix E for Indian Point Energy Center ML22038A2572022-02-0707 February 2022 E-mail from Z. Cruz, NRC, to J. Fleming, HDI - Acceptance Review: License Amendment Request to Revise Emergency Plan and Emergency Action Level Scheme to Address Permanently Defueled Condition for Indian Point Energy Center ML22035A1862022-02-0404 February 2022 E-mail to J. Fleming, Holtec, from Z. Cruz Perez, NRC - Acceptance Review: Exemption Requests from Portions of 10 CFR 50.47 and 10 CFR Part 50, Appendix E, Section IV for Indian Point Energy Center ML22028A1032022-01-28028 January 2022 E-mail Dated 1/28/2022, Transmittal of Draft Safety Evaluation for Proposed License Amendment Revision to Licensing Basis to Incorporate the Installation and Use of of New Auxiliary Lifting Device ML22038A1592022-01-24024 January 2022 NRR E-mail Capture - (External_Sender) 2021 IPEC Annual Sturgeon Impingement Report ML22006A0442022-01-0505 January 2022 Email from Z Cruz to J Fleming Request for Additional Information - HDI Indian Point Post-Shutdown Decommissioning Activities Report ML21337A2952021-12-0303 December 2021 Subsequent Request for Additional Information License Amendment Request to Revise Licensing Basis for New Auxiliary Lifting Device (E-mail Dated 12/3/2021) ML21335A3692021-12-0101 December 2021 Acceptance Review: Indian Point Energy Center - Exemption Request from 10 CFR Part 20 App G Section Iii.E ML21266A2972021-08-18018 August 2021 8/18/2021 E-mail from H. Specter to R. Guzman Public Comments to NRC, Indian Point Post-Shutdown Decommissioning Activities Report Public Meeting on July 29, 2021 ML21225A6142021-08-0909 August 2021 Email from NRC to the Tuscarora Nation Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21225A5682021-08-0909 August 2021 Email from NRC to the Stockbridge-Munsee Community Band of Mohican Indians Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21225A5012021-08-0909 August 2021 Email from NRC to the Shinnecock Indian Nation Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21224A3032021-08-0909 August 2021 Email from NRC to the Mashantucket Pequot Tribe of Connecticut Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21225A4252021-08-0909 August 2021 Email from NRC to the Oneida Nation of Wisconsin Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21225A3142021-08-0606 August 2021 Email from NRC to the Oneida Indian Nation Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21225A4402021-08-0606 August 2021 Email from NRC to the Onondaga Nation of Wisconsin Announcing the IPEC PSDAR Meeting on August 18, 2021 ML21225A5462021-08-0606 August 2021 Email from NRC to the St. Regis Mohawk Tribe Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21225A5352021-08-0606 August 2021 Email from NRC to the Tonawanda Band of Seneca Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21266A2942021-07-25025 July 2021 E-mail from Paul Blanch to NRC (N. Sheehan, D. Screnci) Public Comments to NRC, Indian Point Post-Shutdown Decommissioning Activities Report Public Meeting, July 29, 2021 ML21197A2002021-07-16016 July 2021 (E-mail 7/16/2021) NRC Staff Assessment and RAI Closeout HDI Fleet Decommissioning Quality Assurance Program and Indian Point Energy Center Quality Assurance Program Manual ML21194A4082021-07-13013 July 2021 (7-13-2021) E-mail NRR Review Hour Estimate Change Supporting the Hi-Lift Crane Proposed License Amendment Request Review 2023-05-25
[Table view] Category:Graphics incl Charts and Tables
MONTHYEARCNRO-2018-00011, Submittal of Joint Plant Access Shared Information Table2018-03-19019 March 2018 Submittal of Joint Plant Access Shared Information Table ML17150A2562017-06-0505 June 2017 Entergy Fleet - 2017 Onsite Insurance Submittal Review for Entergy Operations, Inc., and Entergy Nuclear Operations, Inc. (CAC No. TM3058) ML16112A1722016-04-25025 April 2016 Indian Point Nuclear Generating Unit Nos. 2 And 3 Interim Staff Response To Reevaluated Flood Hazards Submitted In Response To 10 CFR 50.54 (f) Information Request Flood-Causing Mechanism Reevaluation (CAC NOS. MF3313 and MF3314) NL-16-035, Supplemental to Basis for Performance of the Mitigating Strategies Assessment with Flood Hazard Information & Report for Recommendations 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accid2016-04-0505 April 2016 Supplemental to Basis for Performance of the Mitigating Strategies Assessment with Flood Hazard Information & Report for Recommendations 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accid ML16056A1392016-03-11011 March 2016 Correction to the U.S. Nuclear Regulatory Commission Analysis of Licensees' Decommissioning Funding Status Reports NL-15-019, Reply to Request for Additional Information 3.0.3-2 from Set 2014-01 for the Review of the License Renewal Application2015-03-10010 March 2015 Reply to Request for Additional Information 3.0.3-2 from Set 2014-01 for the Review of the License Renewal Application ML11221A3052011-08-0909 August 2011 Lr Hearing - NIA-078 NL-11-013, Revised Tables from Responses to Requests for Exemption from 10 CFR 50, Appendix R, Paragraph III.G.2 for Use of Operator Manual Actions2011-02-10010 February 2011 Revised Tables from Responses to Requests for Exemption from 10 CFR 50, Appendix R, Paragraph III.G.2 for Use of Operator Manual Actions ML0936409322009-12-30030 December 2009 Table I, Structural Heat Sinks, Table II, Containment Heat Sink Thermodynamic Data NL-09-151, Telephone Conference Call Regarding Met Tower Data for SAMA Analysis2009-11-16016 November 2009 Telephone Conference Call Regarding Met Tower Data for SAMA Analysis NL-09-018, Reply to Request for Additional Information - Miscellaneous Items2009-01-27027 January 2009 Reply to Request for Additional Information - Miscellaneous Items ML11221A3032008-12-22022 December 2008 Lr Hearing - NIA-077 NL-08-144, Program for Maintenance of Irradiated Fuel and Preliminary Decommissioning Cost Analysis in Accordance with 10 CFR 50.54 (Bb) and 10 CFR 50.75(f)(3)2008-10-23023 October 2008 Program for Maintenance of Irradiated Fuel and Preliminary Decommissioning Cost Analysis in Accordance with 10 CFR 50.54 (Bb) and 10 CFR 50.75(f)(3) ML0905604702008-08-31031 August 2008 Long-Term Monitoring Plan Position Paper ML11221A1262008-08-14014 August 2008 Lr Hearing - NIA-076, Table 1, Projections of the Population and Components of Change for Us: 2010 to 2050 ENOC-08-00040, Commitment Update Relating to Application for Order Approving Indirect Transfer of Control of Licenses2008-07-28028 July 2008 Commitment Update Relating to Application for Order Approving Indirect Transfer of Control of Licenses ML0904006772008-07-0101 July 2008 Unit 3 SBO Event: Time Line to Energize Unit 3 Bus from App R Diesel Via Gt/Bt ML0904006972008-07-0101 July 2008 SBO Event: Time Line to Energize a 480V Bus from GT-25/26 and App R Diesel ML0904100382008-07-0101 July 2008 SBO Event: Time Line to Energize 480V Bus 6A from GT-25/26 and App R Diesel (Total Time: 47 Minutes) ML0904100962008-07-0101 July 2008 ECN 7385; Attachment 7.46 - Post MOD Test Plan ML0904104002008-06-17017 June 2008 Vendor Data for 24-Hr. Run; Entergy, Buchanan, Ny ML0814804812008-05-27027 May 2008 NRC Graphics - Indian Point ML0905101052008-05-0505 May 2008 Trend Report for Nuclides: Co-60, Cs-137, H-3, Ni-63, Sr-90 ML0905101062008-05-0505 May 2008 M10 Investigation Wells NL-08-074, Amendment 4 to License Renewal Application (LRA) Letter Dated April 30, 2008 from Entergy Nuclear Northeast (NL-08-074)2008-04-30030 April 2008 Amendment 4 to License Renewal Application (LRA) Letter Dated April 30, 2008 from Entergy Nuclear Northeast (NL-08-074) ML0905401352008-01-10010 January 2008 Ground Water Monitoring Well Information Table ML0905102022008-01-0808 January 2008 Groundwater Investigation - Summary NYS Results as of 01/08/2008 ML0736200892007-12-20020 December 2007 Report for Analysis or Eight Water Samples from Set 6 from the Indian Point Power Station, Buchanan, New York Dated December 20, 2007 ENOC-07-00036, Entergy Operations, Inc. - Supplemental Information in Support of Application for Order Approving Indirect Transfer of Control of Licenses2007-10-31031 October 2007 Entergy Operations, Inc. - Supplemental Information in Support of Application for Order Approving Indirect Transfer of Control of Licenses ML0731801672007-10-18018 October 2007 Report for Analysis of Seven Water Samples from Set Five from the Indian Point Power Station, Buchanan, New York, Dtd October 18, 2007 ML0728203072007-10-11011 October 2007 Electronic Distribtion Initiative Letter, Licensee List, Electronic Distribution Input Information, Division Plant Mailing Lists ML0729502532007-10-10010 October 2007 Siren Schedule 11 X 17 Dtd 10/10/07 ML0728403122007-07-31031 July 2007 Report for Analysis for Samples from Set Twenty-Four from the Indian Point Power Station, Buchanan, New York. Dtd. July 31, 2007 ML0728402552007-05-0303 May 2007 Interim Report for Completed Analysis for Samples from Set Twenty-One from the Indian Point Power Station, Buchanan, New York. Dtd. May 3, 2007 ML0713102862007-03-20020 March 2007 E-Mail from D. Winslow of GZA to M. Barvenik of GZA, J. Noggle of USNRC and J. Adler of Entergy, Regarding GZA Results ML0713100562007-02-15015 February 2007 E-Mail from T. Rice of NYSDEC to Various, Regarding Latest State Results ML0713100452007-02-12012 February 2007 E-Mail from P. Donahue of Entergy to T. Rice of NYSDEC, Regarding Split Sample Data ML0713005932007-01-24024 January 2007 E-Mail from D. Gray of Entergy to J. Noggle of USNRC, Regarding Historical Sr Data ML0709405042007-01-12012 January 2007 Ltr from Orise Dtd 01/12/2007, Final Letter Report for Requested Analyses of Six Water Samples, Set Eleven, from the Indian Point Power Station, Buchanan, New York (Inspection Report No. 05000247/2006-007) (Rfta No. 06-001) IR 05000247/20060072007-01-0404 January 2007 Ltr from Orise Dtd 01/04/2007, Final Letter Report for Requested Analyses of Nine Water Samples, Set Nine, from the Indian Point Power Station, Buchanan, New York (Inspection Report No. 05000247/2006007) (Rfta No. 06-001) ML0709406182007-01-0404 January 2007 Ltr from Orise Dtd 01/04/2007, Final Letter Report for Requested Analyses of Nine Water Samples, Set Nine, from the Indian Point Power Station, Buchanan, New York (Inspection Report No. 05000247/2006007) (Rfta No. 06-001) ML0701105612006-12-15015 December 2006 Interim Report for Completed Analyses for Samples from Sets Fifteen and Sixteen, from the Indian Point Power Station, Buchanan, New York. (Inspection Report No. 050-247/2006-007) (Rfta No. 06-001) ML0704003112006-12-0404 December 2006 E-Mail from T. Rice of Department of Environmental Conservation to J. Adler of Entergy, and J. Noggle and J. White of USNRC, Regarding Latest State Data ML0704002992006-11-28028 November 2006 E-Mail from T. Rice of Department of Environmental Conservation to Various, Regarding Latest State Results ML0701105482006-11-17017 November 2006 Interim Report for Requested Analyses for Samples from Sets Eleven Through Fourteen, from the Indian Point Power Station, Buchanan, New York. (Inspection Report No. 050-247/2006-007) (Rfta No. 06-001) ML0628302122006-06-15015 June 2006 E-mail from R. Lavera of Entergy to J. Noggle of NRC, Regarding Sample Log ML0618605182006-04-26026 April 2006 E-mail from R. Sachatello of Entergy to M. Barvenik and D. Sinslow of GZA, Regarding Pressure Test Discussion with GZA ML0620001512006-04-13013 April 2006 E-mail from K. Mcmullian, Entergy, to J. Boska, NRR, Et Al., IPEC Status Report April 13 ML0610006912006-03-27027 March 2006 Units 1 & 2 Tritium History (GL-80-10), in Nci/Ml ML0610006872006-03-27027 March 2006 Fsb Sample Log 2018-03-19
[Table view] |
Text
I Jameý Nogglo--I- FW: IPEC Gro un-dwater and Stormwater Dose.pdf Page !11 From: "Croulet, Donald" <dcroule@entergy.com>
To: "'James Noggle'" <JDN @nrc.gov>, "Cox, Mark R" <mcox90 @entergy.com>, "Bowman, Greg "<GBowm9O@cc--exsO3.prod.entergy.com>, "Conroy, Pat" <PConroy@entergy.com>, "Hinrichs, Gary" <ghinric@entergy.com>, "PRICE, ERNEST JR" <EPRICE2@entergy.com>, "Robert Oliveira (boliveira@amnucins.com)" <boliveira@amnucins.com>, "'Timothy Rice"' <tbrice@gw.dec.state.ny.us>
Date: 3/8/06 2:23PM
Subject:
FW: IPEC Groundwater and Stormwater Dose.pdf
Original Message -----
From: Dennis Quinn [1]
Sent: Wednesday, March 08, 2006 2:00 PM To: Croulet, Donald; Jones, T. R.
Cc: Mayer, Don; Matt Barvenik; Axelson, William L; Lavera, Ron; Sandike, Steven; Wilson, Daniel; English, Christopher
Subject:
IPEC Groundwater and Stormwater Dose.pdf Don, Attached is the-revisbrdidd6se'calculation, with GZA's most recent map included as Figure 2.P Thi",as developed by GZA (Matt Barvenik) and Entergy (Steve Sandike), and I have reviewed the calculation. This should be sent to the NRC, as it has changed slightly since the Feb 28th draft version.
I spoke with Matt Barvenik, and we are in agreement that the Unit 1 related discharges through the North Curtain Drain (NCD)and Sphere Foundation Drain Sump (SFDS) are not included in this calculation. I believe this is appropriate because these Unit 1 releases are part of a monitored release path,and they have been included in the annual 1.21 Radioactive Effluents Report. The recent calculation (attached) was performed to estimate what amount of activity was potentially being released through the non-standard pathways. The calculation is conservative, because the amount of water assumed to be moving through the Unit 1 area (and hence being discharged to the river or to the discharge canal) was not decreased by the amount of water being collected by the NCD and SFDS systems, about 25 gallons per minute. That conservatism tends to overestimate the gallons and therefore the total Ci discharged. Please call with any questions or comments.
Dennis Quinn Dennis Quinn, CHP DAQ, Inc.
845-223-1960. office 845-223-1099 fax 845-519-7321 cell
- I Indian Point Energy Center Water Mass Balance and Dose Calculation from Groundwater and Storm Water An Assessment of 2005 Effluent Impact GZA GeoEnvironmental, Inc IPEC Chemistry and Rad Protection DAQ, inc March 3, 2006
IPEC Water Mass Balance and Dose Calculation from Groundwater and Storm Water The basic methodology for this dose calculation is based on an overall mass balance driven by precipitation.
The hydrology portion of this calculation was performed by IPEC's constiltant, Matthew Barvenik, of GZA GeoEnvironmental, Inc. IPEC concurs with this methodology. This "watershed analysis" partitions the precipitation falling on the watershed catchment area (i.e., that portion of the Facility area where the surface topography is sloped towards the river) into water that infiltrates the ground to become groundwater (GW),
water that flows off the surface as storm water (SW) and that water which directly moves back into the atmosphere via evapotranspiration and other processes. See Figure 1, "IPEC Groundwater and Storm Drain Conceptual Drawing". This method of analysis is based on well established hydrologic principles and the parameter selection we've employed is heavily biased towards larger flows and higher H3 concentrations. As such, we believe that this analysis is significantly conservative, resulting in estimates of H3 moving to the river (both directly and via the Discharge Canal) that will likely be proven to be substantially higher than actually exist with the acquisition of additional data.
Over the entire watershed catchment area of 3.2 million fR2, the GW and SW has been segmented relative to the areas of the Facility through which it flows (primarily established based on H3 concentrations in the various Facility areas. See Figure 2, "Indian Point Site Overview" depicting groundwater areas and storm water zones.
Overall, the partitioning was established h§ follows for infiltration areas contributing to GW flow (does not include paved or building areas):
GROUNDWATER AREAS:
" AREA 1. The northwestern most area where GW appears to move directly to the river, but passes to the north of the Unit 2 Turbine Building Road (area of 0.25 million fte). This GW is unlikely to contain
.appreciable H3 concentrations based on the data available to date and the lack of likely H3 sources;
- AREA 2. The area where the GW appears to move through Unit 2 facilities (area of 0.57 million f12);
- AREA 3. The area where the GW appears to move through Unit 1/3 facilities (area of 1.7 million R2);
- AREA 4. The southwestern most area where GW appears to move directly to the river, but passes to the south of the Unit 3 Turbine Building Road (area of 0.67 million ft2). This GW is unlikely to contain appreciable H3 concentrations based on the data available to date and the lack of likely H3 sources.
SW flow from paved areas and building roof areas has also been partitioned into various zones within the above Facility GW areas as follows:
STORM WATER AREAS:
" ZONE A. The eastern most parking lots which likely drain along flow paths where the SW is unlikely to contain H3, and storm drain exfiltration into the GW flow zone is also unlikely to pick up H3 (area of 0.35 million fI);
" ZONE B. Within the Unit 2 Facility, the eastern and western zones where SW appears to discharge to the river, but does not pass through the Unit 2 Transformer Yard (area of 0.21 million ft2);
- ZONE C. Within the Unit 2 Facility, the middle zone where SW flows to the Discharge Canal, and does pass through the Unit 2 Transformer Yard (area of 0.15 million ft2);
- ZONE D. Within the Unit 1 Facility where SW flows to the Discharge Canal (area of 0.13 million ft2);
and
- ZONE E. Within the Unit 3 Facility where SW flows to the Discharge Canal (area of 0.75 million ft2).
Page 1
IPEC Water Mass Balance and Dose Calculation from Groundwater and Storm Water A portion of the SW has been assumed to leak out of storm drains and thus increases the GW flow to the river as follows:
ZONE A. Storm drain exfiltration =0% - set to 0% because exfiltration from pipes in this zone are unlikely to contribute flow to GW which contains H 3 and the SW itself is unlikely to contain H 3; ZONE B. Storm drain exfiltration =0% - set to 0% because exfiltration from pipes in this zone are unlikely to contribute flow to GW which contains H 3 and the SW itself is unlikely to contain H 3;
- ZONE C. Storm drain exfiltration =25% - set to a relatively high value to result in higher than anticipated GW flow through the Unit 2 Transformer Yard which contains the highest H 3 GW values, so as to be conservative;
- ZONE D. Storm drain exfiltration =50%; set very high given current knowledge of these drains; and
- ZONE E. Storm drain exfiltration =10%; set to a nominal value given current lack of specific data and limited impact on overall H3 flux due to low H 3 concentrations.
H 3 concentrations have been established using 2005 data, and Strontium-90 has been included for groundwater flow Area 2.
- GW flow AREA 1. [H 3 ] = 0 pCi/L given lack of likely H 3 source areas and flow path which appears not to flow through areas exhibiting H 3 concentrations in the GW ;
" GW flow AREA 2. [H 3] = 200,000 pCi/L which represents an upper bound average of the concentrations found in the Unit 2 Transformer Yard (it is expected that the pending Phase I and II data will prove this assumed value for H 3 in the GW moving to the river through the Unit 2 area to be substantially higher than actually exists);
e GW flow AREA 3. [H 3] = 620 pCi/L which represents an upper average of the concentrations found in the Unit I and 3 Facility areas;
" GW flow AREA 4. [H3] = 0 pCi/L given lack of likely H 3 source areas and flow path which appears not to flow through areas exhibiting H 3 concentrations in the GW;
- SW flow ZONE A. [H 3] = 0 pCi/L given that exfiltration from pipes in this zone are unlikely to contribute flow to GW which contains H 3 and the SW itself is unlikely to contain H 3;
- SW flow ZONE B. [H 3] = 651 pCi/L given measured storm drain concentrations;
" SW flow ZONE C. [H 3] = 2,900 pCi/L given measured storm drain concentrations;
" SW flow ZONE D. [H3] = 1,560 pCiIL given measured storm drain concentrations; and
- SW flow ZONE E. [H 3] = 1,560 pCi/L given measured storm drain concentrations.
The infiltration rate in non-paved/building areas was established at 0.46 feet/year based on the USGS report:
Water Use, Groundwater Recharge and Availability, and Quality in the Greenwich Area, Fairfield County, CT and Westchester County, NY, 2000 - 2002. The precipitation rate for the area was set at 3.74 feet/year based on onsite meteorological data.
Based on the above analysis, it is estimated that approximately 1.36 Ci/year of H 3 migrates directly to the river via the GW flow path. It is also estimated that less than 0.02 Ci/year flows directly to the river via SW. It is further estimated that approximately 0.16 Ci/year flows to the river with SW via the Discharge Canal.
Page 2
IPEC Water Mass Balance and Dose Calculation from Groundwater and Storm Water It is noted that the H3 concentrations adopted herein are expected .to represent values which are significantly greater than those which actually exist given the conservatism exercised during parameter selection. An example of the conservatism employed in these calculations includes:
- H3 concentrations selected for the various GW and SW flows are likely to be higher values than actually exist. It is believed that these values will be proven to be significantly too high with the acquisition of additional Phase I and II data. This is particularly true for the 200,000 pCi/L adopted for the Unit 2 Transformer Area;
" The areas contributing GW flow through various IPEC Facilities was biased toward placing more flow through the Unit 2 Transformer Yard where the highest H-3 concentrations were used;
" All GW flow has been assumed to discharge directly to the river. Some of this GW flow must infiltrate the Discharge Canal thus reducing the apportionment to the river;
- All storm drain pipe leakage has been assumed to be exfiltration which will increase GW flow values.
However, current data in the Unit 2 Transformer Yard indicates that significant GW infiltrates the storm drain during rainfall events, thus flowing to the Discharge Canal via SW rather than directly to the river as GW. In addition, it is noted that SW H3 concentrations were typically obtained during non-storm events and thus represent the high end of H3 values associated with low flow conditions. However, these high H3 concentrations, were then applied to the much higher storm flows where much lower H3 values should exist;
" All precipitation falling on paved/building areas was assumed to result in SW flow. Some of this water actually evaporates directly to atmosphere from pavement and buildings; and
" The very large value of GW flow extracted from the GW system via the Unit 1 curtain and footing drains has not been subtracted from the GW flows adopted in the analysis.
Results:
The results of the calculations are shown in Table 1, and they show that the annual dose from the groundwater and storm water pathways due to tritium is 0.0000154 millirem per year to the whole body (less than 0.1 percent of the 3 millirem per year liquid pathway limit). If Sr-90 is included in the calculation, the dose to the critical organ (bone) is 0.000840 millirem per year, which is less than 0.1 percent of the 10 millirem per year critical organ limit. The total tritium activity calculated to be released via this pathway is 1.53 Curies, which is less than 0.1 percent of the liquid tritium releases via other pathways.
There are six tables attached:
- A summary table of curies and dose,
" Three tables of curies and doses from storm water pathways, and
" Two tables of curies and doses from groundwater pathways Figure 1 shows a representation of the conceptual water balance.
Figure 2 shows a map of the IPEC site, broken down into Areas and Zones referenced in the calculation.
Figure 3 shows precipitation data for the Indian Point site.
Page 3
IPEC Water Mass Balance and Dose Calculation from Groundwater and Storm Water Figure 1 IPEC Ground Water and Storm Drain Conceptual Drawing Rainvaoao
. ......... Evaporation
- ground -
Page 4
Figure 2.. Indian Point Site Overview A r: It ," . IIII " . ....
File ý~ .'Format- TooW Draw a"
Mf EW61 70 IlI Esý-o1o WF,.141sTANDARD :-Ril 11AT -i6-,Z"o7vV7 sjoc'nlw.
Jj!iflQ091'bM*pa,,.dlor9. Mj 11 R
- = L-ý *,e,44 1113 Orem ByLayer L
7
!lt 130 CM T-00 E3 El
- ,'D 72...
P7
()0
'A No Yes F,
pi- Ajdp-ý- A, S& GRID1 OS OTRACMK LWTFM0DEL!.-,7,- IJIM11111i jim p-t Fýjj-c 5
-i,