Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML17335A168 | 31 March 1998 | Final TER on step-2 Review of IPEEE at DC Cook Nuclear Plant,Units 1 & 2, March 1998 | Hot Short Safe Shutdown High winds Ultimate heat sink Fire Barrier Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Tornado Generated Missile Design basis earthquake Earthquake Turbine Missile |
ML17334A611 | 7 January 1998 | TER Confirmatory Calculations of DC Cook Sump Water Level. | |
ML17333A691 | 28 June 1996 | Rev 0 to, Review of Donald C. Cook Nuclear Power Plant Methodology for Analysis of Fire Barrier Ampacity Derating Factors, Ltr Rept | Fire Barrier |
ML17333A551 | 4 December 1994 | Ltr Rept, Evaluation of Cook Ipe/Hra Matls. | |
ML20126H138 | 31 July 1991 | Draft Afs Risk-Based Insp Guide for DC Cook Nuclear Power Plant | Probabilistic Risk Assessment |
ML20082K753 | 30 July 1991 | Final Rept SAIC-91/6677, Technical Evaluation Rept for Cook Nuclear Plant Units 1 & 2 Station Blackout Evaluation | Safe Shutdown Emergency Lighting Battery sizing |
ML17328A125 | 30 June 1989 | Pump & Valve Inservice Testing Program,Dc Cook Nuclear Plant Units 1 & 2, Technical Evaluation Rept | Safe Shutdown Boric Acid Stroke time Cold shutdown justification Power Operated Valves |
ML20245H230 | 15 February 1989 | Internal Conduit Fire Seal Program,Dc Cook Nuclear Plant Units 1 & 2, Technical Evaluation Rept | Fire Barrier Fire Protection Program |
ML17328A872 | 30 July 1988 | Technical Evaluation Rept on Second 10-Yr Interval Inservice Insp Program Plan:Indiana & Michigan Electric Co, DC Cook Nuclear Plant Unit 2. | High Radiation Area Hydrostatic Temporary Modification VT-2 Incorporated by reference |
ML17328A871 | 30 July 1988 | Technical Evaluation Rept on Second 10-Yr Interval Inservice Insp Program Plan:Indiana & Michigan Electric Co, DC Cook Nuclear Plant,Unit 1. | High Radiation Area Hydrostatic Temporary Modification VT-2 Incorporated by reference |
ML17334B109 | 30 April 1987 | Conformance to Generic Ltr 83-28,Item 2.2.1 - Equipment Classification for All Other Safety-Related Components:Cook 1 & 2, Final Informal Rept | |
ML20214R865 | 31 March 1987 | Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface,Cook-1 & -2,Haddam Neck, Final Informal Rept | |
ML20204G418 | 31 March 1987 | Conformance to Generic Ltr 83-28 Item 2.1 (Part 1) Equipment Classification (Reactor Trip Sys Components) Cook Units 1 & 2 | |
ML17334B110 | 31 March 1987 | Conformance to Generic Ltr 83-28,Item 2.1 (Part 1) Equipment Classification,Cook Units 1 & 2, Informal Rept | |
ML17334B072 | 31 March 1987 | Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28 Reactor Trip Sys Vendor Interface,Cook Units 1 & 2 & Haddam Neck. | |
ML17324B246 | 6 February 1987 | Dcrdr Evaluations,Phases III-V,DC Cook Units 1 & 2, Informal Technical Communication | |
ML17334B033 | 30 November 1986 | Input for Ser,Beaver Valley Power Station Units 1 & 2, Braidwood Station Units 1 & 2,Byron Station Units 1 & 2, Callaway Plant Unit 1,Catawba Nuclear Station Units 1..., Reactor Trip Sys Reliability Item 4.5.2 Generic Ltr 83-28. | |
ML17324B219 | 6 November 1986 | Review of App R Procedures for Post-Fire Remote Emergency Shutdown Outside Control Room,Dc Cook Nuclear Plant Units 1 & 2, Technical Evaluation Rept | Safe Shutdown Fire Barrier Emergency Lighting Exemption Request |
ML20207A704 | 30 June 1986 | Conformance to Reg Guide 1.97,DC Cook Nuclear Plant Units 1 & 2 | Boric Acid Grab sample Fuel cladding |
ML20197J464 | 30 April 1986 | Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Catawba Nuclear Stations 1 & 2,DC Cook Nuclear Power Plants 1 & 2,WB McGuire Nuclear Stations 1 & 2,Sequoyah Nuclear Plants 1 & 2 | |
ML17324A956 | 31 March 1986 | Technical Evaluation Rept of 1984 Meteorological Data from Donald C Cook Nuclear Power Plant. | |
ML17321A932 | 17 October 1985 | Review of Licensee...Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2, `Post-Trip Review:Data & Info Capabilities' for DC Cook..., Technical Evaluation Rept | |
ML20244D387 | 10 July 1985 | Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2, `Post-Trip Review:Data & Info Capabilities' for Bellefonte Nuclear Plant. | |
ML20244D438 | 30 June 1985 | Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Dresden Units 2 & 3,Millstone Unit 1,Monticello,Pilgrim & Quad Cities Units 1 & 2. Contains Info for Dresden & Quad Cities | |
ML20206F313 | 4 February 1985 | Revised Containment Hydrogen Analysis Review of DC Cook, Program Ltr Rept.Related Documentation Encl | |
ML17320A481 | 30 September 1983 | DC Cook,Units 1 & 2 Inservice Insp Plan, Technical Evaluation Rept | Hydrostatic Incorporated by reference |
ML20077L851 | 1 September 1983 | Control of Heavy Loads (C-10) Indiana & Michigan Electric Co,Dc Cook Nuclear Plant Units 1 & 2, Technical Evaluation Rept | Safe Shutdown Nondestructive Examination Control of Heavy Loads |
ML20077K977 | 27 July 1983 | Revised Masonry Wall Design (B-59),DC Cook Nuclear Plant, Units 1 & 2, Technical Evaluation Rept | Safe Shutdown Earthquake Operating Basis Earthquake Design basis earthquake Earthquake |
ML17320A549 | 24 February 1983 | Draft Control of Heavy Loads (C-10),Donald C Cook Nuclear Power Plant Units 1 & 2, Technical Evaluation Rept | Safe Shutdown Control of Heavy Loads |
ML20076C409 | 27 January 1983 | ECCS Repts (F-47) TMI Action Plan Requirements,Cook Nuclear Plant,Units 1 & 2, Technical Evaluation Rept | |
ML20027D182 | 28 October 1982 | Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts (F-11 & B-60),DC Cook Nuclear Plant Unit 1, Technical Evaluation Rept,Vols 1 & 2 | Boric Acid |
ML20027D181 | 28 October 1982 | Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification SERs (F-11 & B-60), Technical Evaluation Rept.Vols I & II | Boric Acid |
ML20069H861 | 8 October 1982 | Radiological Effluent Tech Spec Implementation (A-2),DC Cook Nuclear Plant Units 1 & 2, Technical Evaluation Rept | Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report Process Control Program |
ML20127A289 | 5 October 1982 | Containment Leak Rate Testing Investigations, Progress Summary for Sept 1982 | |
ML17319B616 | 3 September 1982 | DC Cook Nuclear Plant Units 1 & 2,Seismic Qualification of Auxiliary Feedwater Sys, Technical Evaluation Rept | Backfit |
ML20126F254 | 26 August 1982 | Containment Leak Rate Testing, Monthly Progress Rept for Aug 1982 | |
ML20069D076 | 17 August 1982 | Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4, Final Technical Evaluation Rept | |
ML20062E225 | 31 July 1982 | Socioeconomic Impacts of Nuclear Generating Stations.D.C. Cook Case Study.Docket Nos. 50-315 and 50-316.(Indiana and Michigan Electric Company) | Open House |
ML18005A009 | 8 April 1982 | to Request for Addl Info Re Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment. | |
ML17319B323 | 7 April 1982 | to Request for Addl Info Re Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment. | |
ML17319B287 | 28 February 1982 | Tech Specs for Redundant Decay Heat Removal Capability, Donald C Cook Nuclear Plant,Units 1 & 2, Technical Evaluation Rept | |
ML20041D725 | 31 January 1982 | Tech Specs for Redundant Decay Heat Removal Capability, Donald C Cook Nuclear Plant,Units 1 & 2, Preliminary Technical Evaluation Rept | |
ML17326A927 | 20 November 1981 | Control of Heavy Loads. | Safe Shutdown Control of Heavy Loads |
ML20132C554 | 31 May 1981 | Technical Evaluation of Response to Position 5 of Item II.E.4.2 of NUREG-0737,Containment Isolation Setpoint for DC Cook Nuclear Power Plant Units 1 & 2 | |
ML19347E908 | 30 April 1981 | Adequacy of Station Electric Distribution Sys Voltages,Dc Cook Units 1 & 2, Technical Evaluation Rept | Safe Shutdown |
ML17319A941 | 27 April 1981 | Auxiliary Feedwater Sys Automatic Initiation & Flow Indication, Technical Evaluation Rept | Anticipated operational occurrence Power-Operated Valves |
ML19240C000 | 31 March 1981 | Adequacy of Station Electric Distribution Sys Voltages, Technical Evaluation Rept | Safe Shutdown |
ML20003C106 | 31 January 1981 | Technical Evaluation Rept,Adequacy of Station Electrical Distribution Sys Voltages,Dc Cook Nuclear Station Units 2 & 3, Preliminary Rept | Safe Shutdown |
ML17331A613 | 30 November 1980 | Fracture Toughness of Steam Generator & Reactor Coolant Pump Supports,Dc Cook Units 1 & 2, Revised Technical Evaluation Rept | Safe Shutdown Earthquake |
ML17326A751 | 30 September 1980 | Fracture Toughness of Steam Generator & Reactor Coolant Pump Supports,Donald C. Cook Units 1 & 2, Technical Evaluation Rept | Safe Shutdown Earthquake |