Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML17335A16831 March 1998Final TER on step-2 Review of IPEEE at DC Cook Nuclear Plant,Units 1 & 2, March 1998Hot Short
Safe Shutdown
High winds
Ultimate heat sink
Fire Barrier
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Tornado Generated Missile
Design basis earthquake
Earthquake
Turbine Missile
ML17334A6117 January 1998TER Confirmatory Calculations of DC Cook Sump Water Level.
ML17333A69128 June 1996Rev 0 to, Review of Donald C. Cook Nuclear Power Plant Methodology for Analysis of Fire Barrier Ampacity Derating Factors, Ltr ReptFire Barrier
ML17333A5514 December 1994Ltr Rept, Evaluation of Cook Ipe/Hra Matls.
ML20126H13831 July 1991Draft Afs Risk-Based Insp Guide for DC Cook Nuclear Power PlantProbabilistic Risk Assessment
ML20082K75330 July 1991Final Rept SAIC-91/6677, Technical Evaluation Rept for Cook Nuclear Plant Units 1 & 2 Station Blackout EvaluationSafe Shutdown
Emergency Lighting
Battery sizing
ML17328A12530 June 1989Pump & Valve Inservice Testing Program,Dc Cook Nuclear Plant Units 1 & 2, Technical Evaluation ReptSafe Shutdown
Boric Acid
Stroke time
Cold shutdown justification
Power Operated Valves
ML20245H23015 February 1989Internal Conduit Fire Seal Program,Dc Cook Nuclear Plant Units 1 & 2, Technical Evaluation ReptFire Barrier
Fire Protection Program
ML17328A87230 July 1988Technical Evaluation Rept on Second 10-Yr Interval Inservice Insp Program Plan:Indiana & Michigan Electric Co, DC Cook Nuclear Plant Unit 2.High Radiation Area
Hydrostatic
Temporary Modification
VT-2
Incorporated by reference
ML17328A87130 July 1988Technical Evaluation Rept on Second 10-Yr Interval Inservice Insp Program Plan:Indiana & Michigan Electric Co, DC Cook Nuclear Plant,Unit 1.High Radiation Area
Hydrostatic
Temporary Modification
VT-2
Incorporated by reference
ML17334B10930 April 1987Conformance to Generic Ltr 83-28,Item 2.2.1 - Equipment Classification for All Other Safety-Related Components:Cook 1 & 2, Final Informal Rept
ML20214R86531 March 1987Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface,Cook-1 & -2,Haddam Neck, Final Informal Rept
ML20204G41831 March 1987Conformance to Generic Ltr 83-28 Item 2.1 (Part 1) Equipment Classification (Reactor Trip Sys Components) Cook Units 1 & 2
ML17334B11031 March 1987Conformance to Generic Ltr 83-28,Item 2.1 (Part 1) Equipment Classification,Cook Units 1 & 2, Informal Rept
ML17334B07231 March 1987Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28 Reactor Trip Sys Vendor Interface,Cook Units 1 & 2 & Haddam Neck.
ML17324B2466 February 1987Dcrdr Evaluations,Phases III-V,DC Cook Units 1 & 2, Informal Technical Communication
ML17334B03330 November 1986Input for Ser,Beaver Valley Power Station Units 1 & 2, Braidwood Station Units 1 & 2,Byron Station Units 1 & 2, Callaway Plant Unit 1,Catawba Nuclear Station Units 1..., Reactor Trip Sys Reliability Item 4.5.2 Generic Ltr 83-28.
ML17324B2196 November 1986Review of App R Procedures for Post-Fire Remote Emergency Shutdown Outside Control Room,Dc Cook Nuclear Plant Units 1 & 2, Technical Evaluation ReptSafe Shutdown
Fire Barrier
Emergency Lighting
Exemption Request
ML20207A70430 June 1986Conformance to Reg Guide 1.97,DC Cook Nuclear Plant Units 1 & 2Boric Acid
Grab sample
Fuel cladding
ML20197J46430 April 1986Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Catawba Nuclear Stations 1 & 2,DC Cook Nuclear Power Plants 1 & 2,WB McGuire Nuclear Stations 1 & 2,Sequoyah Nuclear Plants 1 & 2
ML17324A95631 March 1986Technical Evaluation Rept of 1984 Meteorological Data from Donald C Cook Nuclear Power Plant.
ML17321A93217 October 1985Review of Licensee...Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2, `Post-Trip Review:Data & Info Capabilities' for DC Cook..., Technical Evaluation Rept
ML20244D38710 July 1985Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2, `Post-Trip Review:Data & Info Capabilities' for Bellefonte Nuclear Plant.
ML20244D43830 June 1985Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Dresden Units 2 & 3,Millstone Unit 1,Monticello,Pilgrim & Quad Cities Units 1 & 2. Contains Info for Dresden & Quad Cities
ML20206F3134 February 1985Revised Containment Hydrogen Analysis Review of DC Cook, Program Ltr Rept.Related Documentation Encl
ML17320A48130 September 1983DC Cook,Units 1 & 2 Inservice Insp Plan, Technical Evaluation ReptHydrostatic
Incorporated by reference
ML20077L8511 September 1983Control of Heavy Loads (C-10) Indiana & Michigan Electric Co,Dc Cook Nuclear Plant Units 1 & 2, Technical Evaluation ReptSafe Shutdown
Nondestructive Examination
Control of Heavy Loads
ML20077K97727 July 1983Revised Masonry Wall Design (B-59),DC Cook Nuclear Plant, Units 1 & 2, Technical Evaluation ReptSafe Shutdown Earthquake
Operating Basis Earthquake
Design basis earthquake
Earthquake
ML17320A54924 February 1983Draft Control of Heavy Loads (C-10),Donald C Cook Nuclear Power Plant Units 1 & 2, Technical Evaluation ReptSafe Shutdown
Control of Heavy Loads
ML20076C40927 January 1983ECCS Repts (F-47) TMI Action Plan Requirements,Cook Nuclear Plant,Units 1 & 2, Technical Evaluation Rept
ML20027D18228 October 1982Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts (F-11 & B-60),DC Cook Nuclear Plant Unit 1, Technical Evaluation Rept,Vols 1 & 2Boric Acid
ML20027D18128 October 1982Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification SERs (F-11 & B-60), Technical Evaluation Rept.Vols I & IIBoric Acid
ML20069H8618 October 1982Radiological Effluent Tech Spec Implementation (A-2),DC Cook Nuclear Plant Units 1 & 2, Technical Evaluation ReptOffsite Dose Calculation Manual
Annual Radiological Environmental Operating Report
Process Control Program
ML20127A2895 October 1982Containment Leak Rate Testing Investigations, Progress Summary for Sept 1982
ML17319B6163 September 1982DC Cook Nuclear Plant Units 1 & 2,Seismic Qualification of Auxiliary Feedwater Sys, Technical Evaluation ReptBackfit
ML20126F25426 August 1982Containment Leak Rate Testing, Monthly Progress Rept for Aug 1982
ML20069D07617 August 1982Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4, Final Technical Evaluation Rept
ML20062E22531 July 1982Socioeconomic Impacts of Nuclear Generating Stations.D.C. Cook Case Study.Docket Nos. 50-315 and 50-316.(Indiana and Michigan Electric Company)Open House
ML18005A0098 April 1982to Request for Addl Info Re Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment.
ML17319B3237 April 1982to Request for Addl Info Re Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment.
ML17319B28728 February 1982Tech Specs for Redundant Decay Heat Removal Capability, Donald C Cook Nuclear Plant,Units 1 & 2, Technical Evaluation Rept
ML20041D72531 January 1982Tech Specs for Redundant Decay Heat Removal Capability, Donald C Cook Nuclear Plant,Units 1 & 2, Preliminary Technical Evaluation Rept
ML17326A92720 November 1981Control of Heavy Loads.Safe Shutdown
Control of Heavy Loads
ML20132C55431 May 1981Technical Evaluation of Response to Position 5 of Item II.E.4.2 of NUREG-0737,Containment Isolation Setpoint for DC Cook Nuclear Power Plant Units 1 & 2
ML19347E90830 April 1981Adequacy of Station Electric Distribution Sys Voltages,Dc Cook Units 1 & 2, Technical Evaluation ReptSafe Shutdown
ML17319A94127 April 1981Auxiliary Feedwater Sys Automatic Initiation & Flow Indication, Technical Evaluation ReptAnticipated operational occurrence
Power-Operated Valves
ML19240C00031 March 1981Adequacy of Station Electric Distribution Sys Voltages, Technical Evaluation ReptSafe Shutdown
ML20003C10631 January 1981Technical Evaluation Rept,Adequacy of Station Electrical Distribution Sys Voltages,Dc Cook Nuclear Station Units 2 & 3, Preliminary ReptSafe Shutdown
ML17331A61330 November 1980Fracture Toughness of Steam Generator & Reactor Coolant Pump Supports,Dc Cook Units 1 & 2, Revised Technical Evaluation ReptSafe Shutdown Earthquake
ML17326A75130 September 1980Fracture Toughness of Steam Generator & Reactor Coolant Pump Supports,Donald C. Cook Units 1 & 2, Technical Evaluation ReptSafe Shutdown Earthquake