to Request for Addl Info Re Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment.
ML18005A009
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 04/08/1982
From:
FRANKLIN INSTITUTE
To:
NRC
Shared Package
ML17319B322 List:
References
RTR-NUREG-0737, RTR-NUREG-737 IEB-79-01B, IEB-79-1B, RAI-C5257-497, RAI-C5257-497-R02, RAI-C5257-497-R2, NUDOCS 8205170041
Download: ML18005A009 (8)


Text

~ M o 0 ~

~ ~

~ ~

DES TED ORIOINK0 N..

~ p 08&ifiett Bp' FOR ADDITIONAL INFORMATION 'EQUEST EQUIPMENT ENVIRONMENTAL'UALIFICATION(EEQ)

REVIEW OF LICENSEES'ESOLUTION OF OUTSTANDING ISSUES FROM NRC EQUIPMENT ENVIRONMENTAL QUALIFICATION SAFETY EVALUATION REPORTS (SER) AND TMI ACTION PLAN INSTALLED EQUIPMENT indiana a Michigan Electric Company D. C. Cook Unit 1, NRC Docket No. 50-315 December 18, 1981 NRC TAC No. 42460 Rev. 1, January 27, 1982 Rev. 2, April 8, 1982 Ilk Franklin Research Center A Division of The Franklin Institute 8205 1'g~ The Bcnlemin Franldln Parkwey, Phih.. Pe. 19103 1215) 448.10GO

~ ~

e RAIM5257-497 Rev. 2, April 8, 1982 BACKGROUND Franklin Research Center (FRC) of philadelphia, pa. is providing assistance to the U.S. Nuclear Regulatory Commission (NRC) for the equipment environmental qualification (EEQ) review of operating reactors. FRC will perform an EEQ review of the Licensee's 90-day response to outstanding issues from the NRC Equipment Environmental Qualification Safety Evaluation Report (SER) and the installed TMI Action Plan equipment. The review will be limited to safety-related equipment potentially exposed to a harsh environment. The results will be presented in the form of a technical evaluation report for each plant.

This request for additional information (RAI) is the result of an evaluation of the information provided by letters dated September 23, 1981

[l]g May 28, 1981 [2], February 3, 1981 [3], and October 31, 1980 [4]>>. FRC previously requested TMI Action Plan information by a telephone memorandum dated August ll, 1981 [5].

In response, American Electric Power (AEP) transmitted the following information on August 17, 1981 [6].

1. Several figures and tables which depict pressure, temperature, and radiation of the containment as a function of time for both LOCA and MSLB events.
2. Copies of the general notes referenced in the February 3, 1981 submi ttal.

B letter dated Februar 26 1982 9 the Licensee transmitted the re uested documents exce t A.l. A.l. A.l.r A.l.t and A.l.v which have not et been established as uglification documents and therefore are not incor orated into the central file and item A.l.s, which will be su lanted b a new reference. The Licensee also stated that a new submittal includin a revised master list would be submitted b March 31 1982. (2)

  • Numbers in brackets refer to citations found in the list of references.

<<*Throughout the text, superscript numbers in parentheses indicate the revision in which the underlined material preceding the superscript was added.

Ill) Franklin Research Center A Dtvtskn cr The FnnkÃn Insole

RAIM5257-497 Rev. 2, April 8, 1982 A FRC REVIEW OF THE LICENSEE'S 90-DAY RESPONSE TO THE NRC EEQ SER INFORMATION REQUESTED DATE RECEIVED BY FRC~**

1. Zn reference to the Licensee's 90-day response (1] to the NRC SER (7], a legible single copy of each of the following qualification documents is requested in order that the FRC evaluation may proceed:
a. Conax Test Report IPS-234
b. Conax Corp. Test Report ZPS<<137
c. Conax Corp. Test Report IPS-348 3 4 82 9 (2)
d. Cerro Wire and Cable Test Report of May 1976
e. Westinghouse - Canada Test Report 3482 9 CWAPD-332
f. Limitorque Test Report 600461 34829
g. Westinghouse Corp.'ommunication NS-PLC<<5023 dated 4/26/78 from

'R T. M. Anderson, Westinghouse, to E. G. Case, NRC

h. Westinghouse Electric Corp. 3482 9 Communications: NS-'QCA-1950
i. BIW Test Report 73C212(

BIW Test Report 75C008 34829

k. Rockbestos Qualification of Firewall IIZ Class IE Electrical Cable, May 1976 Same as d(2)
1. Conax Test Report ZPS-339
m. Conax Test Report IPS-349 3482 9
      • This column will be completed by FRC as the requested information is received.

00 FranMin Research Center A DMsion of The FrsnNn l~c

RAIM5257-497 Rev. 2, April 8, 1982 DATE RECEIVED BY FRC+**

n. Qual. by letter of 6-2-71 from: 34829 W. F. Hergreuter - Customer Service Lab, Brooklyn, NY to> A. H. Statton - Boston Edison Co.

Oe Letter of 4-17-80 from J. M. Allen (Mobil Oil Corp.) to Allen Feibelman (AEP) pe Floodup 'gube Qual. Packet (on SCEW CIl-l,

q. Instr. Cable Term. Packet (on SCEW TI1-1 of Reference 1) Not et in central

~file 9 Ie Required Time Qual. Analysis (on SCEW CI1-1; CI2-1, etc. of Reference 1) Not et in central file 9 (2) ij 44 IE s~ Letter of 4/28/80 from P. K. Eapin to To be su lanted AEP-NRC-003440 i

te E. Q. for outside containment cable (on Ue Westinghouse Elec tr ic Corp.

Correspondence with as noted identity NS-PLC-5023 (on SCEW I-14 of Reference 1)

~Same as (>)

Electrical Penetration and Analysis {on We A co of the master list of 4 (>)

safet -related electrical e ui ment. for D.C. Cook Unit 1 as re uired b IE Bulletin 79-01B Xe Identification of lant ID numbers ~24) (9) a licable to the safet -related electrical e ui ment for D. C. Cook Unit 2 if not contained in the master list re uested in x above I Franklin Research Center A 9(M(((on or The F(a())d(n 4()(()49

RAZ-C5257-497 Rev. 2, April 8, 1982 B FRC REVIEW OF INSTALLED TMI ACTION PLAN ITEMS INFORMATION REQUESTED DATE RECEIVED BY FRC***

1. References 1, 2, and 3 do not provide adequate detail with respect to identification of TMZ Action Plan equipment installed after 1/1/81.
a. Identification of TMZ Action Plan ~25 6 (2) equipment installed with implementation dates after 1/1/81 is requested.
b. The correlation of these equipment items ~25 6 with the specific sections of NUREG-0737

[8] (as applicable) is requested.

[The correlation is needed to ensure that all items are included in the review, e.g., if a transmitter is identified as a TMI Action Plan item, are the cable and terminal blocks associated with the device also identified?]

c. For all installed TMI Action Plan 5 6 (2) equipment identified, a System Component Evaluation Worksheet (SCEW) (in accordance with 79-01B format) is requested.

d The approximate installation date for the ~25 6 (2)

TMI Action Plan equipment items is requested so that the appropriate qualification criteria (NUREG-0588 or DOR Guidelines) can be used in the EEQ evaluation.

2. The qualification documents, e.g., the actual '24 82 9 (2) test reports and associated correspondence cited as evidence of qualification listed on the SCEW sheets, for all identified MZ Action Plan equipment are requested. [The identification of those reports considered to be proprietary is requested so that proper control of documents can be maintained.)

IlII Franklin Research center A Dlf9(ion of The Fran(f)n in988()(e

RAIM5257-497 Rev. 2, April 8, 1982

3. Where the Licensee has a standard position with respect to a NUREG-0737 Owners'roup technical area or has requested extensions of implementation dates, this information is requested in order to incorporate it into the review.

C. INSTRUCTIONS POR TRANSMITTING INFORMATION REQUESTED

1. The schedule for completion of the FRC assignment requires that the Licensee provide the requested information within 3 weeks of the date of the RAI.
2. The Licensee may transmit the requested information as follows:

o complete package directly to the NRC project manager or o copy of cover letter to NRC project manager and complete package to FRC.

FRC mailing address is as follows:

Mr. Cyril J. Crane Franklin Research Center The Parkway at Twentieth Street Philadelphia, PA 19103 Telephone No. 215/448-1353 Telecopy No. 215/448-1296 Telecopy Confirmation No. 215/448-1215 tlfj Frank1ln Research Center A DMsion of The Ftanl4n Ineetute

RAI-C5257-497 Rev. 2, April 8, 1982 REFERENCES G. P. Maloney Letter to H. R. Denton, NRC.

Subject:

Donald C. Cook Nuclear Plant Unit Nos. 1 and 2; Response to SER on Environmental Qualification of.

Safety-Related Electrical Equipment Indiana & Michigan Electric, 23-Sep-81 AEP:NRC:00578 20 R. S. Hunter Letter to J. G. Keppler, NRC.

Subject:

Transmittal of corrected and additional pages to Attachments 2 and 5 of response to IE Bulletin 79-01B dated May 7, 1980 Indiana & Michigan Electric, 28-May-81 AEP:NRC-0356E 3~ G. P. Maloney Letter to J. G. Keppler, NRC.

Subject:

Response to IE Bulletin 79-01B Indiana 6 Michigan Electric, 03-Feb-81 AEP:NRC:0356D 4~ G. P. Maloney Letter to J. G. Keppler, NRC.

Subject:

Revisions to Response to IE Bulletin 79-01B.

Indiana a Michigan Electric, 31-Oct-80 AEP:NRC:00356C 5 Telephone Memorandum C. J. Crane, J. Murphy (FRC), Conversation with S. Miner (NRC-PM),

J. Z. Castresana, J. Delpersico, R. Shelberg, C. Shu {D. C. Cook representatives),

Subject:

Request for TMI Information, D. C. Cook Units 1 and 2, Dated ll-Aug-81.

6. J. I. Castresana Letter to C. Crane, FRC.

Subject:

Transmittal of figures and tables to facilitate TMI Action Plan item review American Electric Power Service, 14-Aug-81 7~ Office of Nuclear Reactor Regulation Safety Evaluation Report for D. C. Cook Unit 1 Environmental Qualification of Safety-Related Electrical Equipment

'RC, 26-May-81

8. NUREG-0737, "Clarification of TMZ Action Plan Requirements" NRC, November 1980 l)ll FrankHn Research Center A Dition ol The Frankln @sante

RAIM5257-497 Rev. 2, April 8, 1982

9. K. S. Hunter Letter to S. A. Var a NRC. Sub'ect: Donald C. Cook Nuclear Plant Unit Nos. 1 and 2: Re uest for Additional Information on Environmental uglification of Safet -Related E ui ment Indiana a Michi an Electric 26-Feb-82 AEP: NRC0578C 09 Franklin Research Center A Division or The Frard4n Institute