Similar Documents at Cook |
---|
Category:CONTRACTED REPORT - RTA
MONTHYEARML17335A1681998-03-31031 March 1998 Final TER on step-2 Review of IPEEE at DC Cook Nuclear Plant,Units 1 & 2, March 1998 ML17334A6111998-01-0707 January 1998 TER Confirmatory Calculations of DC Cook Sump Water Level. ML17333A6911996-06-28028 June 1996 Rev 0 to, Review of Donald C. Cook Nuclear Power Plant Methodology for Analysis of Fire Barrier Ampacity Derating Factors, Ltr Rept ML17333A5511994-12-0404 December 1994 Ltr Rept, Evaluation of Cook Ipe/Hra Matls. ML20126H1381991-07-31031 July 1991 Draft Afs Risk-Based Insp Guide for DC Cook Nuclear Power Plant ML20082K7531991-07-30030 July 1991 Final Rept SAIC-91/6677, Technical Evaluation Rept for Cook Nuclear Plant Units 1 & 2 Station Blackout Evaluation ML17328A1251989-06-30030 June 1989 Pump & Valve Inservice Testing Program,Dc Cook Nuclear Plant Units 1 & 2, Technical Evaluation Rept ML20245H2301989-02-15015 February 1989 Internal Conduit Fire Seal Program,Dc Cook Nuclear Plant Units 1 & 2, Technical Evaluation Rept ML17328A8721988-07-30030 July 1988 Technical Evaluation Rept on Second 10-Yr Interval Inservice Insp Program Plan:Indiana & Michigan Electric Co, DC Cook Nuclear Plant Unit 2. ML17328A8711988-07-30030 July 1988 Technical Evaluation Rept on Second 10-Yr Interval Inservice Insp Program Plan:Indiana & Michigan Electric Co, DC Cook Nuclear Plant,Unit 1. ML17334B1091987-04-30030 April 1987 Conformance to Generic Ltr 83-28,Item 2.2.1 - Equipment Classification for All Other Safety-Related Components:Cook 1 & 2, Final Informal Rept ML20214R8651987-03-31031 March 1987 Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface,Cook-1 & -2,Haddam Neck, Final Informal Rept ML20204G4181987-03-31031 March 1987 Conformance to Generic Ltr 83-28 Item 2.1 (Part 1) Equipment Classification (Reactor Trip Sys Components) Cook Units 1 & 2 ML17334B1101987-03-31031 March 1987 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1) Equipment Classification,Cook Units 1 & 2, Informal Rept ML17334B0721987-03-31031 March 1987 Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28 Reactor Trip Sys Vendor Interface,Cook Units 1 & 2 & Haddam Neck. ML17324B2461987-02-0606 February 1987 Dcrdr Evaluations,Phases III-V,DC Cook Units 1 & 2, Informal Technical Communication ML17334B0331986-11-30030 November 1986 Input for Ser,Beaver Valley Power Station Units 1 & 2, Braidwood Station Units 1 & 2,Byron Station Units 1 & 2, Callaway Plant Unit 1,Catawba Nuclear Station Units 1..., Reactor Trip Sys Reliability Item 4.5.2 Generic Ltr 83-28. ML17324B2191986-11-0606 November 1986 Review of App R Procedures for Post-Fire Remote Emergency Shutdown Outside Control Room,Dc Cook Nuclear Plant Units 1 & 2, Technical Evaluation Rept ML20207A7041986-06-30030 June 1986 Conformance to Reg Guide 1.97,DC Cook Nuclear Plant Units 1 & 2 ML20197J4641986-04-30030 April 1986 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Catawba Nuclear Stations 1 & 2,DC Cook Nuclear Power Plants 1 & 2,WB McGuire Nuclear Stations 1 & 2,Sequoyah Nuclear Plants 1 & 2 ML17324A9561986-03-31031 March 1986 Technical Evaluation Rept of 1984 Meteorological Data from Donald C Cook Nuclear Power Plant. ML17321A9321985-10-17017 October 1985 Review of Licensee...Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2, `Post-Trip Review:Data & Info Capabilities' for DC Cook..., Technical Evaluation Rept ML20244D3871985-07-10010 July 1985 Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2, `Post-Trip Review:Data & Info Capabilities' for Bellefonte Nuclear Plant. ML20244D4381985-06-30030 June 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Dresden Units 2 & 3,Millstone Unit 1,Monticello,Pilgrim & Quad Cities Units 1 & 2. Contains Info for Dresden & Quad Cities ML20206F3131985-02-0404 February 1985 Revised Containment Hydrogen Analysis Review of DC Cook, Program Ltr Rept.Related Documentation Encl ML17320A4811983-09-30030 September 1983 DC Cook,Units 1 & 2 Inservice Insp Plan, Technical Evaluation Rept ML20077L8511983-09-0101 September 1983 Control of Heavy Loads (C-10) Indiana & Michigan Electric Co,Dc Cook Nuclear Plant Units 1 & 2, Technical Evaluation Rept ML20077K9771983-07-27027 July 1983 Revised Masonry Wall Design (B-59),DC Cook Nuclear Plant, Units 1 & 2, Technical Evaluation Rept ML17320A5491983-02-24024 February 1983 Draft Control of Heavy Loads (C-10),Donald C Cook Nuclear Power Plant Units 1 & 2, Technical Evaluation Rept ML20076C4091983-01-27027 January 1983 ECCS Repts (F-47) TMI Action Plan Requirements,Cook Nuclear Plant,Units 1 & 2, Technical Evaluation Rept ML20027D1821982-10-28028 October 1982 Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts (F-11 & B-60),DC Cook Nuclear Plant Unit 1, Technical Evaluation Rept,Vols 1 & 2 ML20027D1811982-10-28028 October 1982 Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification SERs (F-11 & B-60), Technical Evaluation Rept.Vols I & II ML20069H8611982-10-0808 October 1982 Radiological Effluent Tech Spec Implementation (A-2),DC Cook Nuclear Plant Units 1 & 2, Technical Evaluation Rept ML20127A2891982-10-0505 October 1982 Containment Leak Rate Testing Investigations, Progress Summary for Sept 1982 ML17319B6161982-09-0303 September 1982 DC Cook Nuclear Plant Units 1 & 2,Seismic Qualification of Auxiliary Feedwater Sys, Technical Evaluation Rept ML20126F2541982-08-26026 August 1982 Containment Leak Rate Testing, Monthly Progress Rept for Aug 1982 ML20069D0761982-08-17017 August 1982 Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4, Final Technical Evaluation Rept ML20062E2251982-07-31031 July 1982 Socioeconomic Impacts of Nuclear Generating Stations.D.C. Cook Case Study.Docket Nos. 50-315 and 50-316.(Indiana and Michigan Electric Company) ML18005A0091982-04-0808 April 1982 to Request for Addl Info Re Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment. ML17319B3231982-04-0707 April 1982 to Request for Addl Info Re Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment. ML17319B2871982-02-28028 February 1982 Tech Specs for Redundant Decay Heat Removal Capability, Donald C Cook Nuclear Plant,Units 1 & 2, Technical Evaluation Rept ML20041D7251982-01-31031 January 1982 Tech Specs for Redundant Decay Heat Removal Capability, Donald C Cook Nuclear Plant,Units 1 & 2, Preliminary Technical Evaluation Rept ML17326A9271981-11-20020 November 1981 Control of Heavy Loads. ML20132C5541981-05-31031 May 1981 Technical Evaluation of Response to Position 5 of Item II.E.4.2 of NUREG-0737,Containment Isolation Setpoint for DC Cook Nuclear Power Plant Units 1 & 2 ML19347E9081981-04-30030 April 1981 Adequacy of Station Electric Distribution Sys Voltages,Dc Cook Units 1 & 2, Technical Evaluation Rept ML17319A9411981-04-27027 April 1981 Auxiliary Feedwater Sys Automatic Initiation & Flow Indication, Technical Evaluation Rept ML19240C0001981-03-31031 March 1981 Adequacy of Station Electric Distribution Sys Voltages, Technical Evaluation Rept ML20003C1061981-01-31031 January 1981 Technical Evaluation Rept,Adequacy of Station Electrical Distribution Sys Voltages,Dc Cook Nuclear Station Units 2 & 3, Preliminary Rept ML17331A6131980-11-30030 November 1980 Fracture Toughness of Steam Generator & Reactor Coolant Pump Supports,Dc Cook Units 1 & 2, Revised Technical Evaluation Rept ML17326A7511980-09-30030 September 1980 Fracture Toughness of Steam Generator & Reactor Coolant Pump Supports,Donald C. Cook Units 1 & 2, Technical Evaluation Rept 1998-03-31
[Table view] Category:QUICK LOOK
MONTHYEARML17335A1681998-03-31031 March 1998 Final TER on step-2 Review of IPEEE at DC Cook Nuclear Plant,Units 1 & 2, March 1998 ML17334A6111998-01-0707 January 1998 TER Confirmatory Calculations of DC Cook Sump Water Level. ML17333A6911996-06-28028 June 1996 Rev 0 to, Review of Donald C. Cook Nuclear Power Plant Methodology for Analysis of Fire Barrier Ampacity Derating Factors, Ltr Rept ML17333A5511994-12-0404 December 1994 Ltr Rept, Evaluation of Cook Ipe/Hra Matls. ML20126H1381991-07-31031 July 1991 Draft Afs Risk-Based Insp Guide for DC Cook Nuclear Power Plant ML20082K7531991-07-30030 July 1991 Final Rept SAIC-91/6677, Technical Evaluation Rept for Cook Nuclear Plant Units 1 & 2 Station Blackout Evaluation ML17328A1251989-06-30030 June 1989 Pump & Valve Inservice Testing Program,Dc Cook Nuclear Plant Units 1 & 2, Technical Evaluation Rept ML20245H2301989-02-15015 February 1989 Internal Conduit Fire Seal Program,Dc Cook Nuclear Plant Units 1 & 2, Technical Evaluation Rept ML17328A8721988-07-30030 July 1988 Technical Evaluation Rept on Second 10-Yr Interval Inservice Insp Program Plan:Indiana & Michigan Electric Co, DC Cook Nuclear Plant Unit 2. ML17328A8711988-07-30030 July 1988 Technical Evaluation Rept on Second 10-Yr Interval Inservice Insp Program Plan:Indiana & Michigan Electric Co, DC Cook Nuclear Plant,Unit 1. ML17334B1091987-04-30030 April 1987 Conformance to Generic Ltr 83-28,Item 2.2.1 - Equipment Classification for All Other Safety-Related Components:Cook 1 & 2, Final Informal Rept ML20214R8651987-03-31031 March 1987 Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface,Cook-1 & -2,Haddam Neck, Final Informal Rept ML20204G4181987-03-31031 March 1987 Conformance to Generic Ltr 83-28 Item 2.1 (Part 1) Equipment Classification (Reactor Trip Sys Components) Cook Units 1 & 2 ML17334B1101987-03-31031 March 1987 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1) Equipment Classification,Cook Units 1 & 2, Informal Rept ML17334B0721987-03-31031 March 1987 Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28 Reactor Trip Sys Vendor Interface,Cook Units 1 & 2 & Haddam Neck. ML17324B2461987-02-0606 February 1987 Dcrdr Evaluations,Phases III-V,DC Cook Units 1 & 2, Informal Technical Communication ML17334B0331986-11-30030 November 1986 Input for Ser,Beaver Valley Power Station Units 1 & 2, Braidwood Station Units 1 & 2,Byron Station Units 1 & 2, Callaway Plant Unit 1,Catawba Nuclear Station Units 1..., Reactor Trip Sys Reliability Item 4.5.2 Generic Ltr 83-28. ML17324B2191986-11-0606 November 1986 Review of App R Procedures for Post-Fire Remote Emergency Shutdown Outside Control Room,Dc Cook Nuclear Plant Units 1 & 2, Technical Evaluation Rept ML20207A7041986-06-30030 June 1986 Conformance to Reg Guide 1.97,DC Cook Nuclear Plant Units 1 & 2 ML20197J4641986-04-30030 April 1986 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Catawba Nuclear Stations 1 & 2,DC Cook Nuclear Power Plants 1 & 2,WB McGuire Nuclear Stations 1 & 2,Sequoyah Nuclear Plants 1 & 2 ML17324A9561986-03-31031 March 1986 Technical Evaluation Rept of 1984 Meteorological Data from Donald C Cook Nuclear Power Plant. ML17321A9321985-10-17017 October 1985 Review of Licensee...Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2, `Post-Trip Review:Data & Info Capabilities' for DC Cook..., Technical Evaluation Rept ML20244D3871985-07-10010 July 1985 Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2, `Post-Trip Review:Data & Info Capabilities' for Bellefonte Nuclear Plant. ML20244D4381985-06-30030 June 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Dresden Units 2 & 3,Millstone Unit 1,Monticello,Pilgrim & Quad Cities Units 1 & 2. Contains Info for Dresden & Quad Cities ML20206F3131985-02-0404 February 1985 Revised Containment Hydrogen Analysis Review of DC Cook, Program Ltr Rept.Related Documentation Encl ML17320A4811983-09-30030 September 1983 DC Cook,Units 1 & 2 Inservice Insp Plan, Technical Evaluation Rept ML20077L8511983-09-0101 September 1983 Control of Heavy Loads (C-10) Indiana & Michigan Electric Co,Dc Cook Nuclear Plant Units 1 & 2, Technical Evaluation Rept ML20077K9771983-07-27027 July 1983 Revised Masonry Wall Design (B-59),DC Cook Nuclear Plant, Units 1 & 2, Technical Evaluation Rept ML17320A5491983-02-24024 February 1983 Draft Control of Heavy Loads (C-10),Donald C Cook Nuclear Power Plant Units 1 & 2, Technical Evaluation Rept ML20076C4091983-01-27027 January 1983 ECCS Repts (F-47) TMI Action Plan Requirements,Cook Nuclear Plant,Units 1 & 2, Technical Evaluation Rept ML20027D1821982-10-28028 October 1982 Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts (F-11 & B-60),DC Cook Nuclear Plant Unit 1, Technical Evaluation Rept,Vols 1 & 2 ML20027D1811982-10-28028 October 1982 Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification SERs (F-11 & B-60), Technical Evaluation Rept.Vols I & II ML20069H8611982-10-0808 October 1982 Radiological Effluent Tech Spec Implementation (A-2),DC Cook Nuclear Plant Units 1 & 2, Technical Evaluation Rept ML20127A2891982-10-0505 October 1982 Containment Leak Rate Testing Investigations, Progress Summary for Sept 1982 ML17319B6161982-09-0303 September 1982 DC Cook Nuclear Plant Units 1 & 2,Seismic Qualification of Auxiliary Feedwater Sys, Technical Evaluation Rept ML20126F2541982-08-26026 August 1982 Containment Leak Rate Testing, Monthly Progress Rept for Aug 1982 ML20069D0761982-08-17017 August 1982 Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4, Final Technical Evaluation Rept ML20062E2251982-07-31031 July 1982 Socioeconomic Impacts of Nuclear Generating Stations.D.C. Cook Case Study.Docket Nos. 50-315 and 50-316.(Indiana and Michigan Electric Company) ML18005A0091982-04-0808 April 1982 to Request for Addl Info Re Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment. ML17319B3231982-04-0707 April 1982 to Request for Addl Info Re Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment. ML17319B2871982-02-28028 February 1982 Tech Specs for Redundant Decay Heat Removal Capability, Donald C Cook Nuclear Plant,Units 1 & 2, Technical Evaluation Rept ML20041D7251982-01-31031 January 1982 Tech Specs for Redundant Decay Heat Removal Capability, Donald C Cook Nuclear Plant,Units 1 & 2, Preliminary Technical Evaluation Rept ML17326A9271981-11-20020 November 1981 Control of Heavy Loads. ML20132C5541981-05-31031 May 1981 Technical Evaluation of Response to Position 5 of Item II.E.4.2 of NUREG-0737,Containment Isolation Setpoint for DC Cook Nuclear Power Plant Units 1 & 2 ML19347E9081981-04-30030 April 1981 Adequacy of Station Electric Distribution Sys Voltages,Dc Cook Units 1 & 2, Technical Evaluation Rept ML17319A9411981-04-27027 April 1981 Auxiliary Feedwater Sys Automatic Initiation & Flow Indication, Technical Evaluation Rept ML19240C0001981-03-31031 March 1981 Adequacy of Station Electric Distribution Sys Voltages, Technical Evaluation Rept ML20003C1061981-01-31031 January 1981 Technical Evaluation Rept,Adequacy of Station Electrical Distribution Sys Voltages,Dc Cook Nuclear Station Units 2 & 3, Preliminary Rept ML17331A6131980-11-30030 November 1980 Fracture Toughness of Steam Generator & Reactor Coolant Pump Supports,Dc Cook Units 1 & 2, Revised Technical Evaluation Rept ML17326A7511980-09-30030 September 1980 Fracture Toughness of Steam Generator & Reactor Coolant Pump Supports,Donald C. Cook Units 1 & 2, Technical Evaluation Rept 1998-03-31
[Table view] Category:ETC. (PERIODIC
MONTHYEARML17335A1681998-03-31031 March 1998 Final TER on step-2 Review of IPEEE at DC Cook Nuclear Plant,Units 1 & 2, March 1998 ML17334A6111998-01-0707 January 1998 TER Confirmatory Calculations of DC Cook Sump Water Level. ML17333A6911996-06-28028 June 1996 Rev 0 to, Review of Donald C. Cook Nuclear Power Plant Methodology for Analysis of Fire Barrier Ampacity Derating Factors, Ltr Rept ML17333A5511994-12-0404 December 1994 Ltr Rept, Evaluation of Cook Ipe/Hra Matls. ML20126H1381991-07-31031 July 1991 Draft Afs Risk-Based Insp Guide for DC Cook Nuclear Power Plant ML20082K7531991-07-30030 July 1991 Final Rept SAIC-91/6677, Technical Evaluation Rept for Cook Nuclear Plant Units 1 & 2 Station Blackout Evaluation ML17328A1251989-06-30030 June 1989 Pump & Valve Inservice Testing Program,Dc Cook Nuclear Plant Units 1 & 2, Technical Evaluation Rept ML20245H2301989-02-15015 February 1989 Internal Conduit Fire Seal Program,Dc Cook Nuclear Plant Units 1 & 2, Technical Evaluation Rept ML17328A8721988-07-30030 July 1988 Technical Evaluation Rept on Second 10-Yr Interval Inservice Insp Program Plan:Indiana & Michigan Electric Co, DC Cook Nuclear Plant Unit 2. ML17328A8711988-07-30030 July 1988 Technical Evaluation Rept on Second 10-Yr Interval Inservice Insp Program Plan:Indiana & Michigan Electric Co, DC Cook Nuclear Plant,Unit 1. ML17334B1091987-04-30030 April 1987 Conformance to Generic Ltr 83-28,Item 2.2.1 - Equipment Classification for All Other Safety-Related Components:Cook 1 & 2, Final Informal Rept ML20214R8651987-03-31031 March 1987 Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface,Cook-1 & -2,Haddam Neck, Final Informal Rept ML20204G4181987-03-31031 March 1987 Conformance to Generic Ltr 83-28 Item 2.1 (Part 1) Equipment Classification (Reactor Trip Sys Components) Cook Units 1 & 2 ML17334B1101987-03-31031 March 1987 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1) Equipment Classification,Cook Units 1 & 2, Informal Rept ML17334B0721987-03-31031 March 1987 Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28 Reactor Trip Sys Vendor Interface,Cook Units 1 & 2 & Haddam Neck. ML17324B2461987-02-0606 February 1987 Dcrdr Evaluations,Phases III-V,DC Cook Units 1 & 2, Informal Technical Communication ML17334B0331986-11-30030 November 1986 Input for Ser,Beaver Valley Power Station Units 1 & 2, Braidwood Station Units 1 & 2,Byron Station Units 1 & 2, Callaway Plant Unit 1,Catawba Nuclear Station Units 1..., Reactor Trip Sys Reliability Item 4.5.2 Generic Ltr 83-28. ML17324B2191986-11-0606 November 1986 Review of App R Procedures for Post-Fire Remote Emergency Shutdown Outside Control Room,Dc Cook Nuclear Plant Units 1 & 2, Technical Evaluation Rept ML20207A7041986-06-30030 June 1986 Conformance to Reg Guide 1.97,DC Cook Nuclear Plant Units 1 & 2 ML20197J4641986-04-30030 April 1986 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Catawba Nuclear Stations 1 & 2,DC Cook Nuclear Power Plants 1 & 2,WB McGuire Nuclear Stations 1 & 2,Sequoyah Nuclear Plants 1 & 2 ML17324A9561986-03-31031 March 1986 Technical Evaluation Rept of 1984 Meteorological Data from Donald C Cook Nuclear Power Plant. ML17321A9321985-10-17017 October 1985 Review of Licensee...Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2, `Post-Trip Review:Data & Info Capabilities' for DC Cook..., Technical Evaluation Rept ML20244D3871985-07-10010 July 1985 Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2, `Post-Trip Review:Data & Info Capabilities' for Bellefonte Nuclear Plant. ML20244D4381985-06-30030 June 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Dresden Units 2 & 3,Millstone Unit 1,Monticello,Pilgrim & Quad Cities Units 1 & 2. Contains Info for Dresden & Quad Cities ML20206F3131985-02-0404 February 1985 Revised Containment Hydrogen Analysis Review of DC Cook, Program Ltr Rept.Related Documentation Encl ML17320A4811983-09-30030 September 1983 DC Cook,Units 1 & 2 Inservice Insp Plan, Technical Evaluation Rept ML20077L8511983-09-0101 September 1983 Control of Heavy Loads (C-10) Indiana & Michigan Electric Co,Dc Cook Nuclear Plant Units 1 & 2, Technical Evaluation Rept ML20077K9771983-07-27027 July 1983 Revised Masonry Wall Design (B-59),DC Cook Nuclear Plant, Units 1 & 2, Technical Evaluation Rept ML17320A5491983-02-24024 February 1983 Draft Control of Heavy Loads (C-10),Donald C Cook Nuclear Power Plant Units 1 & 2, Technical Evaluation Rept ML20076C4091983-01-27027 January 1983 ECCS Repts (F-47) TMI Action Plan Requirements,Cook Nuclear Plant,Units 1 & 2, Technical Evaluation Rept ML20027D1821982-10-28028 October 1982 Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts (F-11 & B-60),DC Cook Nuclear Plant Unit 1, Technical Evaluation Rept,Vols 1 & 2 ML20027D1811982-10-28028 October 1982 Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification SERs (F-11 & B-60), Technical Evaluation Rept.Vols I & II ML20069H8611982-10-0808 October 1982 Radiological Effluent Tech Spec Implementation (A-2),DC Cook Nuclear Plant Units 1 & 2, Technical Evaluation Rept ML20127A2891982-10-0505 October 1982 Containment Leak Rate Testing Investigations, Progress Summary for Sept 1982 ML17319B6161982-09-0303 September 1982 DC Cook Nuclear Plant Units 1 & 2,Seismic Qualification of Auxiliary Feedwater Sys, Technical Evaluation Rept ML20126F2541982-08-26026 August 1982 Containment Leak Rate Testing, Monthly Progress Rept for Aug 1982 ML20069D0761982-08-17017 August 1982 Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4, Final Technical Evaluation Rept ML20062E2251982-07-31031 July 1982 Socioeconomic Impacts of Nuclear Generating Stations.D.C. Cook Case Study.Docket Nos. 50-315 and 50-316.(Indiana and Michigan Electric Company) ML18005A0091982-04-0808 April 1982 to Request for Addl Info Re Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment. ML17319B3231982-04-0707 April 1982 to Request for Addl Info Re Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment. ML17319B2871982-02-28028 February 1982 Tech Specs for Redundant Decay Heat Removal Capability, Donald C Cook Nuclear Plant,Units 1 & 2, Technical Evaluation Rept ML20041D7251982-01-31031 January 1982 Tech Specs for Redundant Decay Heat Removal Capability, Donald C Cook Nuclear Plant,Units 1 & 2, Preliminary Technical Evaluation Rept ML17326A9271981-11-20020 November 1981 Control of Heavy Loads. ML20132C5541981-05-31031 May 1981 Technical Evaluation of Response to Position 5 of Item II.E.4.2 of NUREG-0737,Containment Isolation Setpoint for DC Cook Nuclear Power Plant Units 1 & 2 ML19347E9081981-04-30030 April 1981 Adequacy of Station Electric Distribution Sys Voltages,Dc Cook Units 1 & 2, Technical Evaluation Rept ML17319A9411981-04-27027 April 1981 Auxiliary Feedwater Sys Automatic Initiation & Flow Indication, Technical Evaluation Rept ML19240C0001981-03-31031 March 1981 Adequacy of Station Electric Distribution Sys Voltages, Technical Evaluation Rept ML20003C1061981-01-31031 January 1981 Technical Evaluation Rept,Adequacy of Station Electrical Distribution Sys Voltages,Dc Cook Nuclear Station Units 2 & 3, Preliminary Rept ML17331A6131980-11-30030 November 1980 Fracture Toughness of Steam Generator & Reactor Coolant Pump Supports,Dc Cook Units 1 & 2, Revised Technical Evaluation Rept ML17326A7511980-09-30030 September 1980 Fracture Toughness of Steam Generator & Reactor Coolant Pump Supports,Donald C. Cook Units 1 & 2, Technical Evaluation Rept 1998-03-31
[Table view] Category:TEXT-PROCUREMENT & CONTRACTS
MONTHYEARML17335A1681998-03-31031 March 1998 Final TER on step-2 Review of IPEEE at DC Cook Nuclear Plant,Units 1 & 2, March 1998 ML17334A6111998-01-0707 January 1998 TER Confirmatory Calculations of DC Cook Sump Water Level. ML17333A6911996-06-28028 June 1996 Rev 0 to, Review of Donald C. Cook Nuclear Power Plant Methodology for Analysis of Fire Barrier Ampacity Derating Factors, Ltr Rept ML17333A5511994-12-0404 December 1994 Ltr Rept, Evaluation of Cook Ipe/Hra Matls. ML20126H1381991-07-31031 July 1991 Draft Afs Risk-Based Insp Guide for DC Cook Nuclear Power Plant ML20082K7531991-07-30030 July 1991 Final Rept SAIC-91/6677, Technical Evaluation Rept for Cook Nuclear Plant Units 1 & 2 Station Blackout Evaluation ML17328A1251989-06-30030 June 1989 Pump & Valve Inservice Testing Program,Dc Cook Nuclear Plant Units 1 & 2, Technical Evaluation Rept ML20245H2301989-02-15015 February 1989 Internal Conduit Fire Seal Program,Dc Cook Nuclear Plant Units 1 & 2, Technical Evaluation Rept ML17328A8721988-07-30030 July 1988 Technical Evaluation Rept on Second 10-Yr Interval Inservice Insp Program Plan:Indiana & Michigan Electric Co, DC Cook Nuclear Plant Unit 2. ML17328A8711988-07-30030 July 1988 Technical Evaluation Rept on Second 10-Yr Interval Inservice Insp Program Plan:Indiana & Michigan Electric Co, DC Cook Nuclear Plant,Unit 1. ML17334B1091987-04-30030 April 1987 Conformance to Generic Ltr 83-28,Item 2.2.1 - Equipment Classification for All Other Safety-Related Components:Cook 1 & 2, Final Informal Rept ML20214R8651987-03-31031 March 1987 Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface,Cook-1 & -2,Haddam Neck, Final Informal Rept ML20204G4181987-03-31031 March 1987 Conformance to Generic Ltr 83-28 Item 2.1 (Part 1) Equipment Classification (Reactor Trip Sys Components) Cook Units 1 & 2 ML17334B1101987-03-31031 March 1987 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1) Equipment Classification,Cook Units 1 & 2, Informal Rept ML17334B0721987-03-31031 March 1987 Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28 Reactor Trip Sys Vendor Interface,Cook Units 1 & 2 & Haddam Neck. ML17324B2461987-02-0606 February 1987 Dcrdr Evaluations,Phases III-V,DC Cook Units 1 & 2, Informal Technical Communication ML17334B0331986-11-30030 November 1986 Input for Ser,Beaver Valley Power Station Units 1 & 2, Braidwood Station Units 1 & 2,Byron Station Units 1 & 2, Callaway Plant Unit 1,Catawba Nuclear Station Units 1..., Reactor Trip Sys Reliability Item 4.5.2 Generic Ltr 83-28. ML17324B2191986-11-0606 November 1986 Review of App R Procedures for Post-Fire Remote Emergency Shutdown Outside Control Room,Dc Cook Nuclear Plant Units 1 & 2, Technical Evaluation Rept ML20207A7041986-06-30030 June 1986 Conformance to Reg Guide 1.97,DC Cook Nuclear Plant Units 1 & 2 ML20197J4641986-04-30030 April 1986 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Catawba Nuclear Stations 1 & 2,DC Cook Nuclear Power Plants 1 & 2,WB McGuire Nuclear Stations 1 & 2,Sequoyah Nuclear Plants 1 & 2 ML17324A9561986-03-31031 March 1986 Technical Evaluation Rept of 1984 Meteorological Data from Donald C Cook Nuclear Power Plant. ML17321A9321985-10-17017 October 1985 Review of Licensee...Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2, `Post-Trip Review:Data & Info Capabilities' for DC Cook..., Technical Evaluation Rept ML20244D3871985-07-10010 July 1985 Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2, `Post-Trip Review:Data & Info Capabilities' for Bellefonte Nuclear Plant. ML20244D4381985-06-30030 June 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Dresden Units 2 & 3,Millstone Unit 1,Monticello,Pilgrim & Quad Cities Units 1 & 2. Contains Info for Dresden & Quad Cities ML20206F3131985-02-0404 February 1985 Revised Containment Hydrogen Analysis Review of DC Cook, Program Ltr Rept.Related Documentation Encl ML17320A4811983-09-30030 September 1983 DC Cook,Units 1 & 2 Inservice Insp Plan, Technical Evaluation Rept ML20077L8511983-09-0101 September 1983 Control of Heavy Loads (C-10) Indiana & Michigan Electric Co,Dc Cook Nuclear Plant Units 1 & 2, Technical Evaluation Rept ML20077K9771983-07-27027 July 1983 Revised Masonry Wall Design (B-59),DC Cook Nuclear Plant, Units 1 & 2, Technical Evaluation Rept ML17320A5491983-02-24024 February 1983 Draft Control of Heavy Loads (C-10),Donald C Cook Nuclear Power Plant Units 1 & 2, Technical Evaluation Rept ML20076C4091983-01-27027 January 1983 ECCS Repts (F-47) TMI Action Plan Requirements,Cook Nuclear Plant,Units 1 & 2, Technical Evaluation Rept ML20027D1821982-10-28028 October 1982 Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts (F-11 & B-60),DC Cook Nuclear Plant Unit 1, Technical Evaluation Rept,Vols 1 & 2 ML20027D1811982-10-28028 October 1982 Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification SERs (F-11 & B-60), Technical Evaluation Rept.Vols I & II ML20069H8611982-10-0808 October 1982 Radiological Effluent Tech Spec Implementation (A-2),DC Cook Nuclear Plant Units 1 & 2, Technical Evaluation Rept ML20127A2891982-10-0505 October 1982 Containment Leak Rate Testing Investigations, Progress Summary for Sept 1982 ML17319B6161982-09-0303 September 1982 DC Cook Nuclear Plant Units 1 & 2,Seismic Qualification of Auxiliary Feedwater Sys, Technical Evaluation Rept ML20126F2541982-08-26026 August 1982 Containment Leak Rate Testing, Monthly Progress Rept for Aug 1982 ML20069D0761982-08-17017 August 1982 Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4, Final Technical Evaluation Rept ML20062E2251982-07-31031 July 1982 Socioeconomic Impacts of Nuclear Generating Stations.D.C. Cook Case Study.Docket Nos. 50-315 and 50-316.(Indiana and Michigan Electric Company) ML18005A0091982-04-0808 April 1982 to Request for Addl Info Re Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment. ML17319B3231982-04-0707 April 1982 to Request for Addl Info Re Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment. ML17319B2871982-02-28028 February 1982 Tech Specs for Redundant Decay Heat Removal Capability, Donald C Cook Nuclear Plant,Units 1 & 2, Technical Evaluation Rept ML20041D7251982-01-31031 January 1982 Tech Specs for Redundant Decay Heat Removal Capability, Donald C Cook Nuclear Plant,Units 1 & 2, Preliminary Technical Evaluation Rept ML17326A9271981-11-20020 November 1981 Control of Heavy Loads. ML20132C5541981-05-31031 May 1981 Technical Evaluation of Response to Position 5 of Item II.E.4.2 of NUREG-0737,Containment Isolation Setpoint for DC Cook Nuclear Power Plant Units 1 & 2 ML19347E9081981-04-30030 April 1981 Adequacy of Station Electric Distribution Sys Voltages,Dc Cook Units 1 & 2, Technical Evaluation Rept ML17319A9411981-04-27027 April 1981 Auxiliary Feedwater Sys Automatic Initiation & Flow Indication, Technical Evaluation Rept ML19240C0001981-03-31031 March 1981 Adequacy of Station Electric Distribution Sys Voltages, Technical Evaluation Rept ML20003C1061981-01-31031 January 1981 Technical Evaluation Rept,Adequacy of Station Electrical Distribution Sys Voltages,Dc Cook Nuclear Station Units 2 & 3, Preliminary Rept ML17331A6131980-11-30030 November 1980 Fracture Toughness of Steam Generator & Reactor Coolant Pump Supports,Dc Cook Units 1 & 2, Revised Technical Evaluation Rept ML17326A7511980-09-30030 September 1980 Fracture Toughness of Steam Generator & Reactor Coolant Pump Supports,Donald C. Cook Units 1 & 2, Technical Evaluation Rept 1998-03-31
[Table view] |
Text
TECHNICAL. EVALUATIO'N REP'ORT'R'ACTURE TOUG HNESS'OF STEAM G ENERATOR AN D REA'CTOR COO'LANT PUMP SUPPORTS INDIANA R. l'lICHIGAN POWER'ONPANY DONALD C,- COOK NUCLEAR POWER PLANT UNITS j AND 2,
'RCDOCKETNO. 50-315 and. 50-316 NRCTACNO. 08479 and 08486 FRC,PROJECT C5257 NRCCONTRACTNO. NRC43-'79-TTS FRCTASK 167 and 168 Prepared by Franklin Research Center Authors: T.C.8til~ell, A.G.Allten, The, Parkway at Twentieth Street K.E.Dorschu, P.N.Noell.
Philadelphia; PA 19103 FRC Group Leader: T.C.Stilwell Prepared for Nuclear Regulatory Commisslon-Washington, D.C. 20555 Lead NRC Engineer: J.R.Fair September, 1980 This report'was prepared as. an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, or any of their employees, makes any warranty, expressed, or implied, or assumes any legal liability or responsibility'for any third party'.s use, or the results of such; use, of any information, apparatus, product or process disclosed In this report, or represents that Its use by such third party wouldnot infringe prlvatelyownedrights.
IjIj Franklin Research center A Division of The Franklin institute The BenjarrMn frenkhnParinvey, Phire.,PL 19103{215) 44$ 1000 801008o4 9
TECHNlCAL EVALUATlON REPORT FRACTURE TOUGHNESS QF STEAM GENERATOR AND REACTOR COOLANT PUMP SUPPORTS INDIANA 5 NICHIGAN POWER COMPANY.
DONALD C. COOK NUCLEAR'POWER PLANT UNITS j. AND 2 NRCDOCKETNO. 50-315 and 50-316 NRCTACNO. 08479 and 08486 FRC PROJECT C5257 NRC CONTRACT NO. NRC43-79-tT8 FRCTASK 167 and 168 Prepared by Franklin Research Center Authors: T.C.Stilwel', A.G.Allten, The Parkway at Twentieth Street K.E.Dorschu, P.N. Noell Philadelphia, PA 19103 FRC Grou'p Leader: T.C. Srilwell Prepared for Nuclear Regulatory Commission Washington, D.C, 20555 Lead NRC Engineer: J.R.Fair September 1980 This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, or any of their employees, makes any warranty, expressed or Implied, or assumes any legal liability or responsibility for any third party's use, or the results of such use, of any information, apparatus, product or process disclosed in this report, or represents that its use by such third party would not Infringe privately owned rights.
Ffl Franklin Research Center A Division of The Franklin institute The seniamin Frankhn 1'aria ey. Pate.. Pa. 19103 (215) ms. coo 1
TER-C5257-167/168 CONTENTS Seccice Tie le ~Pa e 1
SUMMARY
2 INTRODUCTION 3 BACKGROUND ~ 2 4 CRITERIA APPLIED IN THE EVALUATION . . . . . . . 4 4.1 Fracture-Toughness Grouping of Materials Used in Support Construction .
4.1.1 Criterion . 4 4.1.2 Interpretation. 5 4.2 Plant Grouping for Fracture-Toughness Ranking of S/G and RCP Support Structures 5 4 .2.1 Criterion . ~ 5 4e2.2 Interpretation. ~ 5 4.3 Criteria for Fracture-Toughness Adequacy of S/G and RCP Supports ~ 5 4.3.1 NDT Criteria for Screening. ~ 5 4.3.2 Interpretation. 6 e
4.3.3 Alternative Criteria 6 5 TECHNICAL EVALUATION ~ 7 5.1 Review Procedure and Implementation of NRC Criteria . 7 5.2 Review Findings 10 5.2.1 Use of Group I Materials in Applications Important to Structural Integrity of Supports 10 5.2.2 Thick Section Use of Group II Materials in Applications Important to Structural Integrity . 10 5.2.3 Thin Section Use of Group II Materials in Applications Important To Structural Integrity . 10 Ill) Franklin Research Center A Drerrron of The FreN@n fnreure
TER-C5257-167/168 5.2e4 Use of Materials Classified Group II by NUREG 0577, Upon Condition.
5.2.5 Use of Materials Classified, Group III by NUREG 0577, Outright 11 5 .2.6 Issues Not Completely Resolved. 11 6 CONCLUSIONS ll TABLE Number Title ~Pa e 5.1 COMPONENT SUPPORT
SUMMARY
. . e . . . . . . 8 00 Franklin Research Center A DeviskNt cl The Ftbnkltt InttiNtte
TER-C5257-167/168 1 .
SUMMARY
Information concerning aspects of the fracture-toughness design of the steam generator (S/G) and reactor coolant pump (RCP) supports for the Donald C. Cook Nuclear Power Plant Units 1 and 2 was submitted to the Acting Director of the Office of Nuclear Regulation by the Indiana and Michigan Power Company (IMPC) by letter dated Nov. 23, 1977. This information was reviewed at the Franklin Research Center (FRC) and evaluated in accordance with the criteria of the Nuclear Regulatory Commission (NRC) as set forth in NUREG 0577-Draft (henceforth referred to simply as NUREG 0577).
The information had previously been reviewed as part of the preparation of NUREG 0577 and D. C. Cook Units 1 and 2 had been assigned a Group III (rela-tively best) plant ranking for fracture toughness of S/G and RCP supports.
This ranking was regarded as tentative. Subsequently, the NRC requested PRC to conduct an independent review prior to finalizing the ranking.
PRC's review was confined to fracture-'toughness issues in supports above the embedment. The review was conducted in accordance with NRC criteria and to a procedure standardized for the several licensees whose support designs were reviewed at FRC.
As a resu1t of its review, FRC confirmed that the Group III plant ranking assigned to Donald C. Cook Nuclear Power Plants Units 1 and 2 for fracture toughness of S/G and RCP supports is justifiable.
- 2. INTRODUCTION This report provides a technical evaluation of information supplied by IMPC with its letter of Nov. 23, 1977, to Mr. Edson G. Case, Acting Director Office of Nuclear Regulation. The information concerns the fracture-toughness design of supports for the S/Gs and RCPs for D. C. Cook Units 1 and 2. The objective of the evaluation is to rank the design for fracture-toughness integrity on a relative scale in accordance with the grouping scheme and criteria established in NUREG 0577.
Illlll Fran!din Research Center A llnskn of The Frankfn Insolate
TER-C5257-167/168 3 ~ BACKGROUND During the course of the NRC licensing review for two pressurized water reactors (PWR), North Anna Units 1 and 2, questions were raised regarding the fracture-toughness adequacy of certain members of the S/G and RCP supports.
The potential for lamellar tearing in some support members was also questioned.
The staff's concern in the North Anna licensing process was that perhaps not enough attention had been given to the selection of materials for, and fabrication of, the S/G and RCP supports.
Fracture toughness of a material is a measure of its capability to absorb energy without failure or damage. Generally, a material is considered "tough" when, under 'stated conditions of stress and temperature, the material can withstand loading to its design limit in the presence of flaws. Toughness also implies that, under certain conditions, the material has. the capability to arrest the growth of a flaw. A lack of adequate toughness (accompanied by the combination of low operating temperature, presence of flaws, and nonredun-dancy of critical support members). could result in failure of the support structure under postulated accident conditions, specifically a loss-of-coolant accident (LOCA) and safe shutdown earthquake (SSE).
To address fracture-toughness concerns at the North Anna facility, the licensee undertook tests not originally specifi.ed and not included in the relevant ASTM specifications. These tests indicated that material used in certain support members had relatively poor fracture toughness at 80'F metal temperature.
In this case the licensee agreed to raise (by ancillary electrical heat) the temperature of the S/G support beams in question to a minimum of 225'F every time, throughout the life of the plant, that the reactor coolant system (RCS) is pressurized above 1,000 psig. The NRC staff found this to be an acceptable resolution.
Because similar materials and designs were used in other plants and be-cause similar problems were therefore possible, this matter was incorporated into the NRC Program for Resolution of Generic Issues as "Generic Technical 00 Franklin Research Center A olvtsen or The Franklin Insist@
TER-C5257-167/168 Activity A12 Potential for Low Fracture Toughness and Lamellar Tearing on PWR Steam Generator and Reactor Coolant Pump Supports."
Since the original licensing action (North Anna Units 1 and 2) involved only the S/G and RCP supports of PWRs, the staff's initial efforts were di-rected toward examination of the corresponding supports at other PWR facili-ties. However, the staff has kept in mind the possibility of expanding its review to include other support structures in PWR plants and support struc-tures in boiling water reactor (BWR) plants.
The integrity of support embedments was not questi.oned during the North Anna licensing action; consequently, emphasis was placed on resolving the most immediate generic issue whether or not problems similar to those uncovered at North Anna exist at other facilities. It was the staff's judgment that inclusion of an evaluation of support embedments in the initial review would require detailed, plant"specific investigations that were beyond the scope of the preliminary, overall generic review. Such considerations were deemed more suited to a subsequent phase when more detailed investigations of individual plants might be undertaken.
Requests for information were sent to licensees in late 1977; responses to these requests were received during 1978.
Sandia Laboratories in Albuquerque, New Mexico, was retained to assist the staff in the revie~ and analysis of the information received from licensees and applicants. Based on an analysis 'of the information, the technical stud-ies performed by Sandia Laboratories, and review of the issues by the NRC staff, the NRC developed an NRC staff technical posit:ion on these issues, which is presented in NUREG 0577, "Potential for Low Fracture Toughness and Lamellar Tearing on PWR Steam Generator and Reactor Coolant Pump Supports."
In addition, NUREG 0577 establishes criteria for evaluation of the fracture-toughness adequacy of S/G and RCP supports. NUREG 0577 also applies certain of these criteria to the support structures of a number of PWR plants to achieve plant groupings according to the relative fracture-toughness inte-grity of these supports.
lJllll FranMin Research Center A 0!nsen cr The Franklin Inseam
TER-C5257-167/168 The plant ratings 'are:
~ Group I (lowest)
~ Group II (intermediate)
~ Group IIX (highest)
During the generic study, a number of PWR plants were reviewed for the fracture-toughness adequacy of their RCP and S/G designs, As a result of these reviews, each plant was assigned a tentative plant ranking of either Group I, II, or III.
Several Plants, D. C. Cook Units 1 and 2 among them, were tentatively ranked Group IXI. In the appendix to NUREG 0577 prepared by Sandia Labora-tories, who initially established the rankings which subsequently received NRC staff endorsement, the significance of the Group XII ranking is described as:
"considered to be as good as careful, reasonable engineering practice can produce."
However, before finalizing the tentative Group III rankings, the NRC reque'sted FRC to conduct an independent review of the Group IXI plants (in conjunction with similar FRC task assignments to review the fracture-toughness adequacy of corresponding supports in certain other plants) and to prepare a Technical Evaluation Report for each plant, presenting the review findings.
The technical evaluation reported herein applies the criteria of NUREG 0577 to the S/G and RCP supports for D. C. Cook Units 1 and 2 to provide an assessment of the fracture-toughness adequacy of these supports leading to a plant ranking.
- 4. CRITERIA APPLIED IN THE EVALUATION 4.1 FRACTURE-TOUGHNESS GROUPING OF MATERIALS USED IN SUPPORT CONSTRUCTION 4.1.1 Criterion Table 4.6, Material Groups, of Appendix C to NUREG 0577 groups materials according to their relative fracture toughness as:
~ Group I (poorest)
~ Group II (intermediate)
~ Group III (best)
I FranMin Research Center A Dhisen or The FnuU4n Inst+(e
TER-C5257-167/168 4.1.2 Interpretation If no supplementary requirements were called out in the material specifi-cation aimed at procuring a product with fracture-toughness properties supe-rior to those routinely supplied under the material specification, then the material was grouped in accordance with TabLe 4.6.
If additional requirements aimed at procuring a product with superior fracture-toughness properties were specified, consideration was given to cred-iting this specific material order with an improved material-group rating.
4.2 PLANT GROUPING FOR FRACTURE-TOUGHNESS RANKING OF S/G AND RCP SUPPORT STRUCTURES 4.2.1 Criterion Plants are classified on the basis of the construction materials used in the supports after giving consideration to the importance of their location and function within the structure, and their consequent importance to support-structure integrity. (Refer to pages 5 and 6 of NUREG 0577, Part I.)
4.2.2 Interpretation Plants were assigned a plant-group ranking identical to the material-group ranking of the least fracture<<tough material used in the construction, pro-vided this usage is important to support integrity.
4.3 CRITERIA FOR FRACTURE-TOUGHNESS ADEQUACY OF S/G AND RCP SUPPORTS It is the clear intent of NUREG 0577 that licensees demonstrate the fracture-toughness adequacy of the'/G and RCP supports or that they take appropriate corrective measures to assure their fracture-toughness integrity.
NUREG 0577 provides guidance for such demonstrations ~
4.3.1 NDT Criteria for Screening 30'F
+ ' < Tsupports('F>
60 F l Ill) Franklin Research Center h Dion or %be Franklin Inseam
TER-C5257-167/168 where:
~ NDT is the mean nil ductility transition temperature appro-priate to the material as given by Table 4.4 of Appendix C to NUREG 0577 '
~ cr xs the standard deviation for the data used to determine NDT as listed in Table 4.4.
~ Tsupports is the lowest metal temperature that the support member will ever experience throughout the plant life when the plant is in an operational state. In the absence of measured, plant-specific datap Tsupports is taken as 75'F.
~ The temperature term, 30'F or 60'F, is an allowance for sec-tion size (30'F for thin sections and 60'F for thick,sec<<
tions).
4.3.2 Interpretation If evidence is furnished by the licensee proving that other values of NDT, a, or T are actually valid for the S/G or RCP supports and materi-als in the licensee's plant, such data may be used. If acceptable alternative evidence is not available, the above-stipulated values should be used.
4.3.3 Alternative Criteria NUREG 0577 also recognized that fracture-toughness integrity is a complex matter involving a number of interrelated factors, most of which are plant specific. Consequently, demonstration of compliance with the screening crite-ria is but one means of providing satisfactory assurance of fracture-toughness adequacy.
NUREG 0577 not only recognizes that other means of shoving compliance with the intent of NUREG 0577 are possible, but also offers extensive guidance re-lating to several approaches by which such a demonstration may be achieved.
Because of the plant-specific character that such demonstrations must take, NUREG 0577 does not restrict the licensees to any single approach but, instead, encourages each licensee to review the fracture-toughness adequacy of his S/G and RCP supports and submit evidence of his. findings.
l)ll Franklin Research Center A Colon of The Ftsnl4n Ito5tuto
TER-C5257-167/168
- 5. TECHNICAL EVALUATION The information furnished to the NRC regarding the fracture toughness of, and the potential for lamellar tearing in, S/G and RCP supports at D. C. Cook Units 1 and 2 was reviewed at FRC. This information was supplied in response to the NRC staff's generic letter to PWR licensees concerning these issues. A copy of the staff's request-for-information letter (in generic form) may be found in NUREG 0577, Appendix B.
Only fracture toughness issues wexe addxessed in the FRC review; the review procedure is described below.
5.1 REVIEW PROCEDURE AND IMPLEMENTATION OF NRC CRITERIA The drawings and information submitted were first examined to become I familiar with the structural design, material selection, and construction practices. Key items from this information were condensed to tabular form and are presented in Table 5.1.
In accordance with a review procedure standardized for the licensees whose plants were evaluated at FRC, the first step was to compile a list of materials used-in all members significant to the structural integx'ity of the S/G and RCP supports. The listed materials were taken from those reported in the response to Item 1 of the NRC's request for information, supplemented by a survey of the support drawings for additional materials which might be indi-cated there.
To each of the materials so identified, two criteria tests were applied:
- 1. The NDT criteria for screening (paragxaph 4.3.1 of this report).
- 2. The material group ranking in accordance with the procedures of Section 4.1.
For plants which used them, materials with an assigned Group I or Group II fracture-toughness rating wex'e further categorized as thick or thin using the formula'shown on the following page to determine the section thickness above which brittle (plain strain) behavior may be anticipated under dynamic load.
I Franldin Research Center A Oh)sion d The Frank5n Insotu(c
TABLE 5 I COHPONENT SUPPORT
SUMMARY
PLANT: Donald C. Cook I & 2 UTILITY NESS AE SUPPORT SUPPLIER Indiana & Hichigan Pover )7estingbouse hnericsn Electric Pover Conpany HATEkIALS, HAXIHUH ALLOUABLK DESICN STRESS FRACTURE HILL CERTS. NEAT NDK ON TOUGHNESS NEHBRAME 6 THROUGH TYPE AVAILABLK 'TREATMENT HATERIAL TEST BENDINC (NORMAL) THICKNESS Construction Hsterials:
A-618 Cr 2 Yes h-36 to fino-grain UT under veld Tbru~ickness Nerval-Upset: 0.65 Sy A-36 Yes practice areas Reduced brea Tests AISC Hanual hllovablas h-588 Norns l ised h-588 in Energency:
Bolting Materials:
Critical nenbere. CVN for A-618, A 36, 0.9 8 h-5SB (15 ft-lbs Paul tetr A-193 87 830 F). Non-Linear A19&Cr 7 Also HAE and Meld Elastic-Plastic AISI 4145 Materials Analysis
&&90 AISI 4340 Melding Haterials:
E60XX ~ E70XX 801&-Cl, 8018-CI, 8018-C 8016-C2. 8018"C2, 2"I/2X or 3-1/2Z Ni Content sub arc consunsbles FABR1CATION HETllODS USED TO NDE AND MELDING MELDING POST-MELDINC PREVENT LAHELLAR INSPECTIONS PROCESS PROCEDURE TR EATHENT TEARING PERFORMED Hanual Hetal hrc AISC Code, Stress Relief AISC Code Joints UT or RT vhere Sub arc Section IX possible Qualified Pro- MP or LP cedures U &SICH TYPE OF SUPPORT COOK USED LOADINC CONDITIONS HINIHUH TEMPERATURE OF SUPPORT Pin~olunn Homal: DL + TL 60'F (hub(ant tenpersture near Upset: DL s TL + OBE supporti)
Energcncy: DL + TL + DBE Faulted: DL + TL + DBEs PR
TER-C5257-167/168 The critical thickness is given by:
tc-2 ~ 5<
"ID dyD
~
where:
dyD is the dynamic yield strength of the steel.
KID is the nominal, minimum assured fracture toughness of the steel in accordance with values supplied by NUREG 0577.
0 tc is the critical thickness. In members thicker than tc, brittle (i.e., plane strain) behavior may be expected.
A similar categorization for Group III materials was not deemed necessary for purposes of the review because such materials are sanctioned for thick-section use by virtue of their group rating.
Structural drawings were then examined 'for:
1 ~ All structurally significant uses of Group I materials.
2 ~ All'tructurally signifi'cant uses of Group II materials in thick sections.
- 3. Structurally significant applications of materials known to be sensitive to stress corrosion cracking or other special failure mechanisms which might make them prone to brittle behavior.
The circumstances associated with such usage were then examined. Consider-ation was given to factors such as: direction of loadings (always compressive or sometimes tensile), stress levels in the member as indicated in the licensee's response, the presence of stress raisers in member geometries, re-dundancy of load paths, and the like. Applications judged to be of problematic fracture toughness were identi.fied for more detailed evaluation at a future date.
In addition, information furnished on welding and on material specifica-tions was examined for its fracture-toughness implications by a welding engi-neer and a metallurgist, respectively.
00 Franklin Research Center A Dlvlslon d The fsankSn hseute
TER-C5257-167/168 As a result of the review findings and in accordance with the criteria procedure described in Section 4.2 of this report:, a tentative plant ranking for fracture-toughness adequacy of S/G and RCP supports was assigned.
5.2 REVIEW FINDINGS 5.2.1 Use of Group I Materials in Applications Important to Structural Integrity of Supports None found.
5.2.2 Thick Section Use of Group II Materials in Applications Important to Structural Integrity None. found.
5.2.3 Thin Section Use of Group II Materials in Applications Important To Structural Integrity ASTM A"618 steel is indicated on both S/G and RCP support drawings as the material for the main vertical columns. These are constructed of 12 inch dia-meter, double-extra-strong pipe (i.e., seamless tube of 12 3/4 inch o.d. and with 1 inch walls) ~
NUREG 0577 classifies ASTM A-618 as a Group II steel when furnished as formed and without additional specification requirements. However, ASTM A-618 Grade 2 was specified for this tubing and Charpy V-notch testing was required.
Specification ASTM A-618 Grade 2 limits silcon content to a maximum of 0.30 percent, and requires addition of vanadium. The actual steel used was analyzed to have only 0.19 percent silicon (sufficient to completely deoxide the steel according to silicon-killed practice) and to contain 0.04 percent vanadium (which would tend to promote a finer grain size) ~
The test report furnished in the information supplied to NRC by IMPC indicated that the steel possessed a Charpy V-notch impact energy of 24 ft-lbs at 30'F. This value, if typical of all heats, qualifies this steel to be of adequate quality and toughness for 1 inch section usage.
ll00 Franklin Research Center A Ovision of The Fcanklln Instate
TER-C5257-167/168 5.2.4 Use of Materials Classified Group III by NUREG 0577, Upon Condition ASTM A-588 is the major component steel of both the S/G and RCP supports and was supplied as A-588, Grade A. This steel is classified in NUREG,0577 as a Group II material in the as~oLLed or hot-worked condition. However, in sections 1/2 inch thick and over, the steel was ordered normalized and Charpy V-notch impact tests were required. The test data furnished for review indi-cate 'adequate toughness at 30 F in all thicknesses'n view of the additional requirements specified, the A-588 steel used in this application is deemed to be of sufficient quality and toughness to merit a Group III material rating.
5.2.5 Use of Materials Classified Group III by NUREG 0577, Outright All bolting and welding materials.
5.2.6 Issues Not Completely Resolved The text and materials table of the IMPC letter of response refer to use of ASTM A-36 steel as a material of construction for S/G and RCP supports in the Cook plants. These also state that it was ordered to fine grain practice and required to be subjected to Charpy impact testing. Vith such additional requirements the A-36 steel would be considered, under NUREG 0577 criteria, as sanctioned for general use in S/G and RCP supports. However, FRC did not find it indicated as a material of construction on any of the drawings furnished for review nor could mill test or other material data for this steel be found among the extensive information supplied.
This question, although unresoLved, would not appear to affect the final classification of this plant.
- 6. CONCLUSIONS The design and construction of supports for steam generators and reactor coolant pumps at Donald C. Cook Nuclear Power Plant Units 1 and 2 have been reviewed for fracture"toughness adequacy at the FRC.
Il( Franklin Research Center A Oinsion d The Fnu4din Immure
TER-C5257-167/168 Criteria for the suitability of materials and construction practices for S/G and RCP supports were provided by the NRC staff as published in NUREG 0577-Draft. In the review, general criteria of NUREG 0577 were specifically applied to information furnished by Indiana and Michigan Power Company (IMPC) concern>>
ing the supports in D. C. Cook Units 1 and 2.
The review was restricted to supports (above the embedment) for steam generators and reactor coolant pumps. Conclusions relating to them do not necessari.ly extend to the support design of other components.
In the case of D. C. Cook Units 1 and 2 FRC concludes that:
- 1. Engineering measures taken in support design, material selection, material specification, material acceptance testing, fabrication methods, and inspections provide reasonable evidence that the steam generator support structures possess adequate fracture toughness to meet NRC criteria for a Group III rating.
- 2. Engineering measures taken in the design and construction of the reactor coolant pump supports provide similar evidence to qualify them for a Group III rating also.
- 3. The Group III (relatively highest) plant rating for fracture-toughness adequacy of supports assigned to Donald C.Cook Nuclear Power Plant Units 1 and 2 in NUREG 0577-Draft is justifiable.
l)II Franklin Research Center A OMskn of The FiankSn Insane
~ t