 Issue dateTitleTopic
NUREG-1353, Board Notification 89-003:forwards Listed Documents Re Spent Fuel Pool Accidents for Resolution of Generic Issue 82, Beyond DBA in Spent Fuel Pools, Including NUREG-13532 May 1989Board Notification 89-003:forwards Listed Documents Re Spent Fuel Pool Accidents for Resolution of Generic Issue 82, Beyond DBA in Spent Fuel Pools, Including NUREG-1353High Radiation Area
Tornado Missile
Safe Shutdown Earthquake
Hydrostatic
Probabilistic Risk Assessment
Design basis earthquake
Earthquake
Control of Heavy Loads
Chernobyl
Turbine Missile
Fuel cladding
Backfit
Fatality
NUREG/CR-5176, Updated Board Notification 89-01 Re Lll NUREG/CR-5176, Seismic Failure & Cask Drop Analyses of Spent Fuel Pools at Two Representative Nuclear Power Plants14 February 1989Updated Board Notification 89-01 Re Lll NUREG/CR-5176, Seismic Failure & Cask Drop Analyses of Spent Fuel Pools at Two Representative Nuclear Power PlantsSafe Shutdown Earthquake
Hydrostatic
Probabilistic Risk Assessment
Operating Basis Earthquake
Finite Element Analysis
Design basis earthquake
Earthquake
Control of Heavy Loads
ML20154S7503 June 1988Board Notification 88-004:forwards Exchange of Correspondence Between Nrc,Fema & Lilco Re Recent Announcement of Agreement in Principle Between Lilco & State of Ny Re Facility.W/Certificate of Svc
ML20136G36621 November 1985Board Notification 85-090:forwards Tdi 851106 Part 21 Rept Re Potential Problem W/Emergency Diesel Generator Engine Intake & Exhaust Valve Springs Furnished by Betts Springs Co.Issue Resolved
ML20136G37121 November 1985Board Notification 85-091:submits Info Re Grand Gulf Tdi Emergency Diesel Generator Overspeed Condition on 851106. Probably Caused by Malfunction of Woodward Governor Mechanism.Damage Being Assessed & Evaluated
ML20133B2603 October 1985Board Notification 85-087:forwards Vs Noonan to Util & Rev 2 to Staff Evaluation of Comanche Peak Response Team Program Plan:Detailed Comments/Concerns, Per Commission 840706 Revised Notification PolicySafe Shutdown
Hydrostatic
Coatings
FLEX
ML20205B1706 September 1985Board Notification 85-074:provides Addl Info Re Allegations Concerning Facility,Per Board Notification 85-014 & 85-020. Neither Staff Nor ASLB Misled by Util Testimony.Restricted Encl Withheld
IR 05000277/198501122 July 1985Board Notification 85-070:forwards Enforcement Action Notification Resulting from Insp Repts 50-277/85-11 & 50-352/85-12 Re Radiation Protection at Peach Bottom & Security at Limerick
ML20127G65118 June 1985Board Notification 85-063:provides Info Re Tdi Diesel Air Start Check Valve Cracks at Facility.Encl R Starostecki 850419 Memo to Hl Thompson Describes Problems W/Cracks in & Failures of Certain Check Valves
ML20244C81415 February 1984Board Notification 84-024:forwards SECY-84-34 Re Emergency Diesel Generators Mfg by Transamerica Delaval,Inc.Staff Continuing Overall Assessment of Reliability of Diesel Engines
IA-87-778, Board Notification 84-024:forwards SECY-84-34 Re Emergency Diesel Generators Mfg by Transamerica Delaval,Inc.Staff Continuing Overall Assessment of Reliability of Diesel Engines15 February 1984Board Notification 84-024:forwards SECY-84-34 Re Emergency Diesel Generators Mfg by Transamerica Delaval,Inc.Staff Continuing Overall Assessment of Reliability of Diesel Engines
ML20215H90327 October 1983Annotated Board Notification 83-164:forwards Allegations Re Certain Qa/Qc Activities.Source of Allegations Confidential. Related Documentation Encl
ML20204G54014 October 1983Board Notification 83-158:forwards Oct 1983 Sser 19 Re Matters Identified in Sser 18 & Listed in SECY-83-366,that Must Be Resolved Prior to Fuel Loading.Matters Adequately Resolved
ML20151H4874 May 1983Board Notification 83-057:forwards Differing Prof Opinions Re Sys Interaction & Safety Classification.Info Relates to Board Notifications 83-17 & 83-44 Re Unresolved Safety Issue A-17Probabilistic Risk Assessment
ML20151H66125 April 1983Board Notification 83-053:forwards Notice of Violation & Proposed Imposition of Civil Penalty Based Upon Applicant Approving Preoperational Test Results for Diesel Generator Test Even Though Acceptance Criteria Not Satisfied
ML20204F04612 April 1983Board Notification 83-42:forwards Info Re Unanalyzed Reactor Vessel Thermal Stress During Cooldown.B&W Informed NRC of Preliminary Safety Concern Evolving from Further Consideration of 800610 St Lucie Upper Head Voiding Event
ML20204F0364 March 1983Board Notification 83-27:forwards 830221 Memo & Final Eg&G Rept Re Addl RELAP-5 Calculation for Semiscale S-SR-2 Test
ML20204F01629 September 1982Board Notification 82-97:forwards Transcript of NRC 820909 Meeting W/State of CA Re Design Verification Program & Independent Design Verification Program:Auxiliary Bldg, Interim Technical Rept
ML20204F00924 September 1982Board Notification 82-93:forwards Addl Info Re Semiscale Test Results Concerning Feed & Bleed Mode of Core Cooling
ML20062E07726 July 1982Board Notification 82-77:provides Info Re QA During Const & Emergency Preparedness
ML20062E16220 July 1982Board Notification 82-70:notifies of Differing Prof Opinion Re Sensitization of BWR Stainless Steel Weldments
ML20204E95418 June 1982Board Notification 82-60:forwarding Info Re Design Verification Program from Teledyne Engineering Svcs,Rl Cloud Associates,Inc & Rf Reedy,Inc
ML20054E92310 June 1982Board Notification:Notifying of Drywell to Wetwell Vacuum Breakers Which Can Be Subj to air-clearing Load Resulting from Pool Swell Following Postulated Loca.Components Can Be Overstressed by Impact Load
ML20054F4598 June 1982Board Notification 82-56:informs of FEMA Interim Findings on State & Local Readiness for Offsite Radiological Emergency Preparedness & Forwards Amend 42 to FSAR
ML20204E9514 June 1982Board Notification 82-57:forwarding Info Re Status of Independent Design Verification Program Activities Relevant to Safety Issue on Design Adequacy.Results Will Be Reported Prior to Reinstatement of License
ML20054E7814 June 1982Board Notification 82-52:forwarding Repts Concerning Evacuation of Small Community Near Facility During Emergencies
ML20204E9382 June 1982Board Notification 82-53:forwarding Summary of 820430 Discussion of Bechtel Rate in Completion of Project.Info Relevant to Design Adequacy Safety Issue
ML20204E93327 January 1982Board Notification 82-06 Forwarding Design Verification Program for Power Ascension:Diablo Canyon Nuclear Power Plant Unit 1, & Qualification Document - Design Verification Program for Power Ascension
ML20151H17920 January 1982Board Notification 82-04 Forwarding Info Re Pressurized Thermal Shock
ML20204E9055 November 1981Forwarding Draft Board Notification 81-38, Seismic Reverification Program Presented During 811103 Meeting W/ PG&E Re Current Status of Review & Evaluation of Seismic Discrepancies in Facility Containment Annulus Area