Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
NUREG-1353, Board Notification 89-003:forwards Listed Documents Re Spent Fuel Pool Accidents for Resolution of Generic Issue 82, Beyond DBA in Spent Fuel Pools, Including NUREG-1353 | 2 May 1989 | Board Notification 89-003:forwards Listed Documents Re Spent Fuel Pool Accidents for Resolution of Generic Issue 82, Beyond DBA in Spent Fuel Pools, Including NUREG-1353 | High Radiation Area Tornado Missile Safe Shutdown Earthquake Hydrostatic Probabilistic Risk Assessment Design basis earthquake Earthquake Control of Heavy Loads Chernobyl Turbine Missile Fuel cladding Backfit Fatality |
NUREG/CR-5176, Updated Board Notification 89-01 Re Lll NUREG/CR-5176, Seismic Failure & Cask Drop Analyses of Spent Fuel Pools at Two Representative Nuclear Power Plants | 14 February 1989 | Updated Board Notification 89-01 Re Lll NUREG/CR-5176, Seismic Failure & Cask Drop Analyses of Spent Fuel Pools at Two Representative Nuclear Power Plants | Safe Shutdown Earthquake Hydrostatic Probabilistic Risk Assessment Operating Basis Earthquake Finite Element Analysis Design basis earthquake Earthquake Control of Heavy Loads |
ML20154S750 | 3 June 1988 | Board Notification 88-004:forwards Exchange of Correspondence Between Nrc,Fema & Lilco Re Recent Announcement of Agreement in Principle Between Lilco & State of Ny Re Facility.W/Certificate of Svc | |
ML20136G366 | 21 November 1985 | Board Notification 85-090:forwards Tdi 851106 Part 21 Rept Re Potential Problem W/Emergency Diesel Generator Engine Intake & Exhaust Valve Springs Furnished by Betts Springs Co.Issue Resolved | |
ML20136G371 | 21 November 1985 | Board Notification 85-091:submits Info Re Grand Gulf Tdi Emergency Diesel Generator Overspeed Condition on 851106. Probably Caused by Malfunction of Woodward Governor Mechanism.Damage Being Assessed & Evaluated | |
ML20133B260 | 3 October 1985 | Board Notification 85-087:forwards Vs Noonan to Util & Rev 2 to Staff Evaluation of Comanche Peak Response Team Program Plan:Detailed Comments/Concerns, Per Commission 840706 Revised Notification Policy | Safe Shutdown Hydrostatic Coatings FLEX |
ML20205B170 | 6 September 1985 | Board Notification 85-074:provides Addl Info Re Allegations Concerning Facility,Per Board Notification 85-014 & 85-020. Neither Staff Nor ASLB Misled by Util Testimony.Restricted Encl Withheld | |
IR 05000277/1985011 | 22 July 1985 | Board Notification 85-070:forwards Enforcement Action Notification Resulting from Insp Repts 50-277/85-11 & 50-352/85-12 Re Radiation Protection at Peach Bottom & Security at Limerick | |
ML20127G651 | 18 June 1985 | Board Notification 85-063:provides Info Re Tdi Diesel Air Start Check Valve Cracks at Facility.Encl R Starostecki 850419 Memo to Hl Thompson Describes Problems W/Cracks in & Failures of Certain Check Valves | |
ML20244C814 | 15 February 1984 | Board Notification 84-024:forwards SECY-84-34 Re Emergency Diesel Generators Mfg by Transamerica Delaval,Inc.Staff Continuing Overall Assessment of Reliability of Diesel Engines | |
IA-87-778, Board Notification 84-024:forwards SECY-84-34 Re Emergency Diesel Generators Mfg by Transamerica Delaval,Inc.Staff Continuing Overall Assessment of Reliability of Diesel Engines | 15 February 1984 | Board Notification 84-024:forwards SECY-84-34 Re Emergency Diesel Generators Mfg by Transamerica Delaval,Inc.Staff Continuing Overall Assessment of Reliability of Diesel Engines | |
ML20215H903 | 27 October 1983 | Annotated Board Notification 83-164:forwards Allegations Re Certain Qa/Qc Activities.Source of Allegations Confidential. Related Documentation Encl | |
ML20204G540 | 14 October 1983 | Board Notification 83-158:forwards Oct 1983 Sser 19 Re Matters Identified in Sser 18 & Listed in SECY-83-366,that Must Be Resolved Prior to Fuel Loading.Matters Adequately Resolved | |
ML20151H487 | 4 May 1983 | Board Notification 83-057:forwards Differing Prof Opinions Re Sys Interaction & Safety Classification.Info Relates to Board Notifications 83-17 & 83-44 Re Unresolved Safety Issue A-17 | Probabilistic Risk Assessment |
ML20151H661 | 25 April 1983 | Board Notification 83-053:forwards Notice of Violation & Proposed Imposition of Civil Penalty Based Upon Applicant Approving Preoperational Test Results for Diesel Generator Test Even Though Acceptance Criteria Not Satisfied | |
ML20204F046 | 12 April 1983 | Board Notification 83-42:forwards Info Re Unanalyzed Reactor Vessel Thermal Stress During Cooldown.B&W Informed NRC of Preliminary Safety Concern Evolving from Further Consideration of 800610 St Lucie Upper Head Voiding Event | |
ML20204F036 | 4 March 1983 | Board Notification 83-27:forwards 830221 Memo & Final Eg&G Rept Re Addl RELAP-5 Calculation for Semiscale S-SR-2 Test | |
ML20204F016 | 29 September 1982 | Board Notification 82-97:forwards Transcript of NRC 820909 Meeting W/State of CA Re Design Verification Program & Independent Design Verification Program:Auxiliary Bldg, Interim Technical Rept | |
ML20204F009 | 24 September 1982 | Board Notification 82-93:forwards Addl Info Re Semiscale Test Results Concerning Feed & Bleed Mode of Core Cooling | |
ML20062E077 | 26 July 1982 | Board Notification 82-77:provides Info Re QA During Const & Emergency Preparedness | |
ML20062E162 | 20 July 1982 | Board Notification 82-70:notifies of Differing Prof Opinion Re Sensitization of BWR Stainless Steel Weldments | |
ML20204E954 | 18 June 1982 | Board Notification 82-60:forwarding Info Re Design Verification Program from Teledyne Engineering Svcs,Rl Cloud Associates,Inc & Rf Reedy,Inc | |
ML20054E923 | 10 June 1982 | Board Notification:Notifying of Drywell to Wetwell Vacuum Breakers Which Can Be Subj to air-clearing Load Resulting from Pool Swell Following Postulated Loca.Components Can Be Overstressed by Impact Load | |
ML20054F459 | 8 June 1982 | Board Notification 82-56:informs of FEMA Interim Findings on State & Local Readiness for Offsite Radiological Emergency Preparedness & Forwards Amend 42 to FSAR | |
ML20204E951 | 4 June 1982 | Board Notification 82-57:forwarding Info Re Status of Independent Design Verification Program Activities Relevant to Safety Issue on Design Adequacy.Results Will Be Reported Prior to Reinstatement of License | |
ML20054E781 | 4 June 1982 | Board Notification 82-52:forwarding Repts Concerning Evacuation of Small Community Near Facility During Emergencies | |
ML20204E938 | 2 June 1982 | Board Notification 82-53:forwarding Summary of 820430 Discussion of Bechtel Rate in Completion of Project.Info Relevant to Design Adequacy Safety Issue | |
ML20204E933 | 27 January 1982 | Board Notification 82-06 Forwarding Design Verification Program for Power Ascension:Diablo Canyon Nuclear Power Plant Unit 1, & Qualification Document - Design Verification Program for Power Ascension | |
ML20151H179 | 20 January 1982 | Board Notification 82-04 Forwarding Info Re Pressurized Thermal Shock | |
ML20204E905 | 5 November 1981 | Forwarding Draft Board Notification 81-38, Seismic Reverification Program Presented During 811103 Meeting W/ PG&E Re Current Status of Review & Evaluation of Seismic Discrepancies in Facility Containment Annulus Area |