Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20196J5171 December 1998Audit Rept for Audit Conducted on 981027-29 on Implementation of GL-98-01, Year 2000 Readiness of Computer Sys at Npp
ML20216C13712 March 1998Package Consisting of Update on Status of Thermo-Lag ResolutionFire Barrier
ML20129C71023 October 1996Press Release III-96-65, NRC Staff Proposed $50,000 Fine Against Centerior Svc Co for Fire Protection Violations at DbnpsSafe Shutdown
ML20138J15228 August 1995Rev 1 to SQUG Walkdown Sample - Floor/Ceiling Cable Tray Supports
ML20058P14420 August 1993Package Consisting of Attachment to Employee Concerns Programs
ML20085M63611 November 1991Response to NUMARC Questions Concerning 316(b) Demonstration.Document Undated
ML20235G66225 September 1987Package of Documents Re 870101 Plant Trip,Including Region III Daily Rept for 870102,plant Daily Status Rept for 870102 & Main Feedwater Pump Turbine Rept
IA-87-589, Package of Documents Re 870101 Plant Trip,Including Region III Daily Rept for 870102,plant Daily Status Rept for 870102 & Main Feedwater Pump Turbine Rept25 September 1987Package of Documents Re 870101 Plant Trip,Including Region III Daily Rept for 870102,plant Daily Status Rept for 870102 & Main Feedwater Pump Turbine Rept
ML20214L0443 February 1987Partially Withheld Package of Ltrs Discussing Actions Being Taken as Result of Allegation of Employee Coming to Facility & Acting in Loud Manner After Consuming AlcoholFitness for Duty
IA-87-224, Partially Withheld Package of Ltrs Discussing Actions Being Taken as Result of Allegation of Employee Coming to Facility & Acting in Loud Manner After Consuming Alcohol3 February 1987Partially Withheld Package of Ltrs Discussing Actions Being Taken as Result of Allegation of Employee Coming to Facility & Acting in Loud Manner After Consuming AlcoholFitness for Duty
ML20214L03929 January 1987Partially Withheld Summary of Allegation Re Distracting Behavior of Individual in Control Room After Drinking Alcohol Offsite on 861231
ML20235C06121 January 1987Package of Documents Consisting of Work Assignment Mgt Event Record,Description of Plant Status & Overview Rept of Plant for Dec 1986
IA-87-584, Package of Documents Consisting of Work Assignment Mgt Event Record,Description of Plant Status & Overview Rept of Plant for Dec 198621 January 1987Package of Documents Consisting of Work Assignment Mgt Event Record,Description of Plant Status & Overview Rept of Plant for Dec 1986
ML20235G60831 December 1986Package Consisting of Davis-Besse Daily Status for 861231Fire Barrier
ML20151S59230 September 1986Prudency Audit,Davis-Besse Nuclear Power Station, Final ReptNon-Destructive Examination
Post Accident Monitoring
Probabilistic Risk Assessment
Temporary Modification
Emergency Lighting
Condition Adverse to Quality
Systematic Assessment of Licensee Performance
Operability Determination
Earthquake
Fire Protection Program
Backfit
ML20129D45826 July 1985Package Consisting of Sequence of Events Reviews Re 850609 EventStroke time
ML20262D85426 July 1985Package Consisting of 16 Oversize Main Feedwater,Auxiliary Feedwater & Main Steam Sys Figures.Aperture Cards Available in PDR
ML20129D42518 June 1985Package Consisting of Revs 0 & II to Action Item List from 850609 Reactor Trip, Attachment 1, Post-Trip Review (Program Description & Procedure) & Strip Charts for Makeup Tank
ML20129D44217 June 1985Package Consisting of Results of 850611 Initial Look at Turbine Bypass Valve Sp 13A2 & Associated Piping & Walkdown of Main Steam Sys Outside of Containment Documented Under 850614 QC Insp Plan
ML20129D46317 June 1985Package Consisting of Review & Availability of Transcripts & Instructions for Checking Out Transcripts
ML20129D43713 June 1985Package Consisting of Statements of Work Performed on Equipment Affected After Transient & Prior to Hold in Abeyance Confirmatory Action Ltr,Including Surveillance Tests & Maint Work OrdersStroke time
Temporary Modification
ML20129D51512 June 1985Package Consisting of Action Plan 12, Auxiliary Feedwater Sys Valve Problem Analylsis (AF 599 & 608), J Long & M Bajestani 850614 Memo Re Failure of Auxiliary Feedwater Valve 599 & Rev 2 to J Wood 850613 Memo Re 850609 IncidentStroke time
ML20129D48112 June 1985Package Consisting of Two Equipment Freeze Lists Re Licensee Proposal for Continued Quarantine
ML20129D42912 June 1985Package Consisting of Maint Mgt Sys,Mwo Browse, Preliminary Status Repts on Action Plans 1A,1B & 10,Rev 2 to Available Inputs for SPDS & Problem Summary Chart for Auxiliary Feedwater Pump Turbines 1-1 & 1-2Stroke time
ML20129D42111 June 1985Package Consisting of Listing of Personnel W/Corresponding Company Positions for 850611 Entrance Briefing
ML20129D3563 June 1985Package of 850602-07,10,11 & 17 Daily Status Repts & General Insp Guidelines
ML20129F4839 May 1985Package of Compilations of Results of Operator Licensing & Requalification Exams
ML20207L5022 August 1982Package of Info Re HPI stop-check Valves
ML20207P1554 December 1981Collection of Drawing Change Notices for Rev 22 to E-361 & Rev 32 to M-041 Under Tac Number 48364
ML20125D89831 August 1978Calculation Data Re Davis-Besse 1 Pressurizer Levels During Reactor Trips
ML20125D88524 September 1977Data on RCS Pressure Transient for Electromagnetic Pressurizer Relief Valve That Stuck Open,Causing Small Break in RCS Piping
ML20207B62822 April 1977Collection of Documents,Including Forwarding Evaluation of 790411 & 790416 Responses to IE Bulletin 79-05,under IE Bulletins 79-05A & 79-05B