ML20129D481

From kanterella
Jump to navigation Jump to search
Package Consisting of Two Equipment Freeze Lists Re Licensee Proposal for Continued Quarantine
ML20129D481
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 06/12/1985
From:
TOLEDO EDISON CO.
To:
References
NUDOCS 8507300059
Download: ML20129D481 (2)


Text

. . . . , ,

6/12/85 fW 4:00 PM 2]

EQUIPMENT FREEZE 44 The following list of items )f"the licensee's proposal for continued quarantine:

1. MFP's Turbine and Controls
2. SFRCS and associated instrument channels
3. AuxFeed Pump Turbines and Controls
4. MSIVs including controls - Actuating Circuits, Pneumatic supplies
5. S/U Feed Valve SP-7A - and controls
6. Source Range instrument channels
7. Turbine Bypass Valve SP-13A2 - Any other components for which there is found an indication of water hammer damage
8. PORV 6 Controls and Actuation system
9. Main Steam Safety valves
10. AF 599 & 608 valves, Actuators and Controls This item was released by the Fact-Finding Team:
1. SPDS This item was added by the Fact-Finding Team:
1. SW Valve and Controls on AFW alternate supply It is agreed that no work will be done in the proximity of, or on, this equipment.

The licensee agreed to complete a walkdown of the Main Steam System by m___

appropriate personnel to identify any additional damage that may have

. been caused by water hammer.

The Fact-Finding Team stated that:

(a) If required for safety, work shall proceed.

(b) Surveillance Requirements of the Technical Specifications should be satisfied.

(c) The team should be advised of any actions taken in the two areas above.

8507300059 850612 PDR ADOCK 05000346 P PDR

r -

g di 6lI Tf Y*L EQUIPMENT FREEZE The following list of items is the licensee's proposal for continued quarantine:f'

1. MFP's Turbine and Controls 2.- SFRCS
3. AuxFPumps Turbine and Controls
4. MSIV's Controls - Actuating Circuits
5. SUFP Valve SP-7A - and controls
6. Source-Range Detectors
7. Turbine Bypass Valve SP-13A2 - Any other indication of water hammer damage
8. PORV & Controls and Actuation system
9. MSS
10. AF 599 &'608 Actuators and Controls
11. SPDS Team cancelled ,

This item was'added on by the Fact Finding Team:

1.- SW Valve and Controls <,n AFW alternate supply It is understood that no work will be done in the proximity of, or on this equipment.

o