MAR-12 98 10:08 FROM: NUCLE R LIC5NSING 419-249-2302 T0:913014153061 PAGE:02

~

bcbc.l C?ST) 4c.5 'Id, 1%:A L,,- lrm s 3 h z.19e Discussion Notes for NRC Conference Call:

Status of Thermo-Lag Resolution.1st O 1998 Update j

As described in April 3,1997 meeting, Thermo-Lag (T-L) replacement effort is a five Phase approach.

Phase I was completed in 4Q1996.

T-L was removed from circuits in 3 rooms.

T-L was replaced on fire dampers in 5 rooms.

Phase II consists of replacement of T-L on CTMT radiant energy shields.

Design has been completed via issuance of a Supplement to the MOD package.

Work requires an outage of sufficient duration (planned for 11RFO, which is scheduled to e

commence 4/11/98).

Phase III was completed in IQ98 and consisted of removal of most of the remaining accessible T-L (i.e., except CTMT and annulus) and installation of altemate material on circuits and structural steel in selected rooms.

T-L was removed from circuits in 5 rooms.

T-L was installed on circuits in 2 rooms.

T-L was removed from structural steelin 3 rooms.

T-L was removed and replaced from structural steel in 6 rooms.

Phase IV is scheduled for 2Q97 to 2Q98(11RFO) and consists of replacing annulus radiant energy shields with 3-hr rated alternate barrier, and completing Phase 11.

E Design work for the annulus fire barriers is complete.

E.,

Fire test for the annulus design has been successfully completed.

E e

EE.

I Phase V is scheduled for 3Q97 to 4Q98 and consists ofinstallation of alternate material E.

i on remaining circuits.

E-

$a

  • Design work is in progress.

M-Physical work is scheduled to commence in 3Q98.

6 00 gg Other Items:

For several installations, where further analysis shows that fire barrier protection is no longer e

o-required, the Thermo-Lag fire barrier may be abandoned-in place in lieu of removing it.

$o Any Thermo-Lag which has been abandoned-in-place will continue to be taken into account

@8 in the fire loading for the area. In addition, NRC Information Notice 95-049 Supplement 1,

'@g

" Seismic Adequacy of Thermo-Lag Panels," dated December 10,1997, will be addressed.

{V s

MOD 96-0005, was completed week of 3/2/98, modifying CCW pump control circuitry to

${

e allow removal of T-L from circuits in Rooms 313 and 328.

g Fire test for misc. 3 hour3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> configurations is scheduled for week of 3/15/98 at Omega Point e

Lab.

Fire test for misc.1-hour configurations will be scheduled later, following 1 IRFO.

.