 Issue dateTitleTopic
ML20086D3172 September 1975AO 75-018:on 750901,steam Supply Valve 13-15 Failed to Close When Control Switch Placed in Closed Position.After Repeated Attempts,Valve 13-15 Responded & Cycled Closed.Valve Stroked,Timed to Ensure Operability & Declared Inoperable
ML20086D36725 July 1975Telecopy AO 75-014:on 750725,head Gasket on Gland Seal Exhaust Condenser Failed.Replacement of Failed Gasket Initiated Immediately.Condenser Repaired & HPCI Sys Tested & Verified Operable
ML20085E9559 July 1975AO BFAO-50-260/759T:on 750709,broken Stem Found on second- Stage Pilot of Main Steam Release Valve 1.Break Point Just Under Lock Nut Above Actuating Piston.Site Inspector Advised
ML20086D3758 July 1975Telecopy AO 75-013:on 750707,injection Valve CS-11B Failed to Open When Control Switch Placed in Open Position.Valve Immediately Opened Manually to Full Open Position.Sys Aligned to Normal Standby Mode
ML20086E0459 June 1975AO 75-12:on 750609,standby Liquid Control Pump B Delivered High Flow Rate.Cause Under Investigation
ML20086E07212 May 1975AO 75-11:on 750511,intermediate Range Monitor Channel E Failed to Respond to Increasing Neutron Flux Level.Cause Not Stated.Reactor Protection Sys Trip Sys a Manually Tripped
ML20086E14530 April 1975AO 75-10:on 750429,low Water Level Switch Associated W/ Differential Pressure Indicating Sensor 2-3-58B Actuated Low.Switch Adjusted
ML20086E1558 April 1975AO 75-08:on 750408,air Ejector Suction Valve Isolation Time Delay Relay Timer 17-157A Actuated Slow.Cause Not Stated. Timer Reset
ML20086E22221 February 1975AO 75-05:on 750220,sample Accumulator Isolation Valve to Condenser OG-9069 Found Shut,Rendering Radiation Monitors Inoperable.Cause Not Stated.Valve Immediately Opened
ML20086E3465 February 1975AO 75-03:on 750204,spray Sys Pump Discharge Pressure Sensor PS-14-44A Actuated at 82 Psig,Below Tech Spec Min. Sensor Replaced & Calibr
ML20086E2445 February 1975AO 75-04:on 750204,gradual Flow Reduction Discovered in Air Ejector Offgas Monitoring Sys.Caused by Removal of 3-way Solenoid Valve for Cleaning & Repair.Valve Replaced
ML20086E3859 January 1975AO 75-02:on 750108,personnel Discovered That Carbon Filter Beds Changed on Standby Gas Treatment Sys Train a Instead of Planned Train B.Carbon Beds in Train B Replaced
ML20086E3889 January 1975AO 75-01:on 750108,LPCI Low Reactor Pressure Permissive Switches on Instrument 2-3-52D Actuated High.Caused by Improper Calibr Technique.Switch Reset
ML20084U9502 January 1975AO 50-265/74-29:on 741223,cracks at Welds in 4 Inch Reactor Recirculation Discharge Valve Bypass Lines Indicated.Cause Undetermined.Piping on a & B Loops to Be Completely Replaced
ML20084U95623 December 1974Telecopy Ao:Three Weld Abnormalities Discovered on Welds in Bypass Piping Lines Around Recirculation Pump Discharge Valves.Plans Formulated to Replace Lines
ML20086E40720 December 1974AO 74-17:on 741219,suppression Chamber Outboard Sample Valve Stuck in Open Position.Caused by Accumulation of Dirt Causing Binding of Solenoid Piston.Valve Cleaned
ML20086E40016 December 1974AO 74-16:on 741214,containment Air Sampling Sys Found Inoperable.Caused by Nonfunctioning Heat Tracing Circuit.Sys Repaired
ML20086E4083 December 1974AO 74-15:on 741202,scram Discharge Vol High Level Scram Switch 3-231A Would Not Actuate Respective Scram Relay. Caused by Fissure in Switch Casement.Switch ReplacedScram Discharge Volume
ML20086E41116 October 1974AO 74-14:on 741015,primary Containment Leak Discovered. Caused by Missing 1/2-inch Test Connection Plug on Drywell Penetration X-16A.Plug Installed
ML20086J39114 October 1974AO 74-11:on 741004,RCIC Steam Line Drain Valve Failed to Close.Caused by Piece of Weld Slag Wedged in Below Seat Stem Guide.Valve Disassembled & Cleaned
ML20086J3954 October 1974Telecopy AO 74-11:on 741004,RCIC Steam Line Drain Valve Failed to Close.Caused by Weld Bead.Rcic Sys Blocked to Permit Disassmbly of Valve & Investigation of Problem
ML20086J4034 October 1974Telecopy AO 74-50:on 741004,cleanup Sys Dc Isolation Valve V-16-14 Failed to Close Electrically.Cause Under Investigation.Arc Horn on Contactor 2Bc Replaced
ML20086J4254 October 1974Telecopy AO 74-15:on 741004,setpoint Drift Detected on Ps 263-52A,PS 263-53A & Ps 263-53B.Caused by Setpoint Drift. Switches Recalibr
ML20084C5574 October 1974AO 50-219/74-48:on 740925,isolation Condensers a & B Inoperable Due to High Flow as Sensed by Condensate Line Break Sensors.Caused by Tripping of Line Break Sensors Due to Effects of Rated Recirculation Flow
ML20084C58030 September 1974Preliminary AO 50-219/74-48:on 740927,main Steam Line Low Pressure Switch RE23A Found to Trip at Pressure Less than Min of 860 Psig.Caused by Switch Repeatability.Ge Submitted Info to Reduce SetpointFuel cladding
ML20084C78626 August 1974Preliminary AO 50-219/74/45:on 740824,commitment to Follow MAPLHGR Limits Violated.Caused by Insufficient Guidance. Reactor Power Reduced by Recirculation Flow to Point Where No MAPLHGR Limits Violated
ML20086E41815 July 1974AO 74-11:on 740705,08 & 09,both Plant Stack Monitoring Sys Failed.Caused by Direct Lightning Strikes to Ventilation Stacks During Electrical Storms.Radiation Exposure to Personnel NegligibleGrab sample
ML20086E4288 July 1974AO 74-11:on 740705,both Plant Stack Monitoring Sys Failed Following Direct Lightning Strike During Severe Electrical Storm.Generator Turbine Tripped Causing Reactor Scram.Repair of Damaged Equipment Complete
ML20086E4323 July 1974AO 74-10:on 740626,HPCI Inverter Tripped,Rendering HPCI Sys Inoperable.Caused by Poor Connection Between Printed Circuit Board & Companion Jack.Connections Cleaned
ML20086E4603 July 1974AO 74-09:in 740625,movements of LPCI Loop Break Detection Logic Differential Pressure Indicating Switches 2-129B & 2-129C Found Sticking,Causing Pointer to Log Input Pressure. Caused by Frequent Switch Actuation
ML20086E43727 June 1974AO 74-10:on 740626,HPCI Inverter Tripped,Rendering HPCI Sys Inoperable.Cause Not Stated.Inverter Replaced
ML20086E47326 June 1974AO 74-09:on 740625,movements of LPCI Loop Break Detection Logic Differential Pressure Indicating Switches 2-129B & 2-129C Sluggish,Causing Pointer to Lag Input Pressure.Switch 2-129B Replaced & 2-129C Placed in Trip Condition
ML20086E50013 June 1974AO 74-08:on 740525,water Discovered in Ventilation Ducting & in Instrument Penetrations at Biological Shield.Caused by Leak on Control Rod Drive Hydraulic Sys Return Line to Reactor Vessel,Due to Stress Corrosion CrackingHydrostatic
Liquid penetrant
ML20086E5764 June 1974AO 74-08:detailed Rept & Analysis Including Appropriate Corrective Measures Taken Re 740526 Incident Will Be Submitted within 20 Days of Occurrence
ML20086E58328 May 1974AO 74-08:on 740525,water Leakage Discovered Along Reactor Vessel Wall.Caused by Leak on Control Rod Drive Hydraulic Sys Return Line to Reactor Vessel.Engineering Review & Assessment Underway
ML20086E63615 May 1974AO 74-07:on 740509,spike Observed on Plant Stack Gas Recorder,Resulting in Stack Release Peak Greater than Allowed by Tech Specs.Caused by Steam Packing Exhauster Operation
ML20086E63910 May 1974AO 74-07:on 740509,spike Observed on Plant Stack Gas Recorder,Resulting in Stack Release Peak Greater than Allowed by Tech Specs.Cause Not Stated
ML20086K9958 May 1974Telecopy AO 74-24:on 740507,RCIC Outboard Steam Isolation Valve MO-13-16 Failed to Open Following Surveillance Test. Caused by Failed Motor.Outboard & Operable Inboard RCIC Steam Isolation Valves Placed in Closed Position
ML20086E65225 April 1974AO 74-06:on 740418,both Access Doors to North Entrance to Reactor Bldg Found Partially Open.Caused by Personnel Failing to Verify Closure.Design Adequacy Under Review
ML20086E66419 April 1974AO 74-06:on 740418,both Access Doors to North Entrance to Reactor Bldg Found Open.Caused by Personnel Failure to Verify Closure.Methods to Assure Closure Underway
ML20084D23912 April 1974Preliminary AO 50-219/74/26:on 740412,emergency Svc Water Pump 52C Failed to Start.Cause Under Investigation
ML20086E67711 March 1974AO 74-05:on 740304,LPCI Loop a Valve V10-25A Failed to Open When Control Switch Placed in Open Position.Caused by Burned Out Valve Motor.Motor Replaced
ML20086E6965 March 1974AO 74-05:on 740304,LPCI Valve V10-25A Failed to Open When Control Switch Placed in Open Position.Caused by Tripped Motor Breaker & Unusually Warm Motor.Motor Replaced
ML20086E7131 March 1974AO 74-04:on 740223,MSIV Rv 2-71B Failed to Open at Required Setpoint.Indirectly Caused by Approved vendor-recommended Mods to Certain Relief Valve Internals.Procedure Revised
ML20086E72425 February 1974AO 74-04:on 740223,MSIV Rv 2-71B Failed to Open at Required Setpoint.Cause Under Investigation
ML20086E73211 February 1974AO 74-03:on 740204,LPCI Differential Pressure Indicating Switch 2-137B Failed to Indicate Properly Upon Isolation from Normal Sys Pressure W/Bypass Valve Open.Caused by Improper Sensor over-range Stop Setting.Sensors CalibrOvertravel
ML20086E7547 February 1974AO 74-02:on 740131,core Spray Sys Valve CS-11A Failed to Open When Control Switch Placed in Open Position.Caused by burned-out Valve Motor.Motor Replaced
ML20086E7474 February 1974AO 74-03:on 740204,LPCI Differential Pressure Indicating Switch 2-137B Failed to Indicate Properly Upon Isolation from Normal Sys Pressure W/Bypass Valve Open.Cause Not Stated.Sensor Replaced
ML20086E7631 February 1974AO 74-02:on 740131,core Spray Sys Valve CS-11A Failed to Open When Control Switch Placed in Open Position.Cause Not Stated.Surveillance Testing Completed & Sys Aligned to Standby Mode
ML20086E78231 January 1974AO 74-01:on 740124,reactor Scrammed,Resulting from Turbine Trip Causing Automatic Closure of All But One Msiv.Valve 2-80C Failed to Close Due to Failure of Pneumatic Pilot Valve to Actuate.Valve Assembly Returned to Vendor for Insp