Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML22034A39516 February 2022Enclosure 3 - IP 96001 CY2021 - IR 8 Baseline Inspection Completion
ML22034A39716 February 2022Enclosure 2 - IP 92707 CY2021 - IR 8 Baseline Inspection Completion
ML22034A39916 February 2022Enclosure 1 - IP 71130.03 Cy 2021 - IR 8 Baseline Inspection Completion
ML18044A1057 February 2018Summary of Changes to One Procedure and One Form That Implement the Wolf Creek Generating Station (WCGS) Radiological Emergency Response Plan (Rerp). Includes Procedure AP 06-004, Rev. 8 & Form Epf 06-011-01, Rev. 5
ML17284A1855 October 2017Attachment to RA 17-0110 - Summary of Changes to Two Procedures and Two Forms That Implement the Wolf Creek Generating Station Radiological Emergency Response Plan
ML17060A14910 February 2017FOIA/PA-2017-0110 - Resp 1 - Final, Agency Records Subject to the Request Are Enclosed. Part 3 of 6
ML17060A14610 February 2017FOIA/PA-2017-0110 - Resp 1 - Final, Agency Records Subject to the Request Are Enclosed. Part 1 of 6
ML15014A15314 January 2015Attachment 1- NEI Comments on NRC Working Group Recommendations to Revise the Substantive Cross-Cutting Issue Process
ML15014A16014 January 2015Attachment 2 - NRC Working Group Recommendations to Revise the Substantive Cross-Cutting Issue Process
ML14258B08918 September 2014Public Notice, Notice of Consideration of Issuance of Amendment, Revise Technical Specification 3.4.15, RCS Leakage Detection Instrumentation, Completion Time Extension (Exigent Circumstances)Shutdown Margin
ML13246A37119 June 2013Ope Communication on Augmented Inspection - Wolf Creek Generating Station Loss of Offsite Power and Notification of Unusual EventShutdown Margin
Ultimate heat sink
ML13073A20515 March 2013YT020130045 - Wolf Creek Generating Station - Enclosure - Preliminary Accident Sequence Precursor Analysis of January 2012 Loss of Offsite Power EventFitness for Duty
Non-Destructive Examination
Mission time
Fire impairment
Temporary Modification
Significance Determination Process
Continuous fire watch
ML12056A05212 March 2012Enclosure 6 - List of Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status
ML10137030712 May 2010Proposed License Amendment Request Regarding Presure Boundary Designation for Pressurizer Power Operated Relief ValvesSafe Shutdown
Operator Manual Action
Fire Protection Program
ML09335075114 January 2010Temporary Instruction 2515/180, Managing Fatigue
ML0806704197 March 2008CDBI FindingsReactor Vessel Water Level
Stroke time
Past operability
Battery sizing
ML08046039913 February 2008Power Reactor Inattentive Officer Findings 2004-PresentSignificance Determination Process
ML07324002425 October 2007Examples of Max Thermal Power License Conditions
ML07263031914 September 2007P. Paquin Ltr Amendment to Certificate of Compliance No. 6574 for the Model No. 3-82B Package (TAC L24116)/ Register User List
ML07200005517 July 2007License Renewal; USAR Information on Liquid, Gaseous, and Solid Radioactive Waste Management SystemsSafe Shutdown
Boric Acid
Grab sample
Offsite Dose Calculation Manual
Anticipated operational occurrence
Process Control Program
Earthquake
ML0714501509 May 2007Responses A39 - A45 and A48 - A50 to Additional Information Needs Identified During Audit of NRC Request for Additional Information Related to License Renewal ApplicationSafe Shutdown Earthquake
Operating Basis Earthquake
Earthquake
ML0714501499 May 2007Responses A11 - A19 and A23 to Additional Information Needs Identified During Audit of NRC Request for Additional Information Related to License Renewal ApplicationGrab sample
Offsite Dose Calculation Manual
ML0717704616 February 2007Procedure AP 05F-001, Rev. 3, Design Verification.
ML06347059914 December 2006Plant Service List
ML07177046012 July 2006Procedure AP 05-005, Rev. 11A, Design, Implementation & Configuration Control of Modifications.Ultimate heat sink
Temporary Modification
Emergency Lighting
Fire Protection Program
Scaffolding
ML06075026810 March 2006Protection of Safe Shutdown CapabilitiesSafe Shutdown
Fire Barrier
Significance Determination Process
Fire Protection Program
ML0606902753 March 2006Plant Engineering Branch Open Items, Interim Safety BasisHot Short
Safe Shutdown
ML06069027928 February 2006Revised Oversight Process - Item List Report
ML06069028931 October 2005PIR 20052757 InformationHot Short
Safe Shutdown
Fire Barrier
Operator Manual Action
Hourly Fire Watch
ML05054046910 February 2004Dynamic Web Page Printout Dated 02/10/2004, ROP PIM Report - All Sites - Event Dates: 01/01/2003 - 02/10/2004Safe Shutdown
Fire Barrier
Condition Adverse to Quality
Significance Determination Process
Fire Protection Program
ML0505404649 February 2004Dynamic Web Page Printout Dated 02/09/2004 Regarding Applied Violations for Nuclear Power Plants
ML0329401047 October 2003Riv Backfit StatusBackfit
ML06069027730 May 2003Sp - 10 CFR-50 Appendix R - Fire Protection of Safe Shutdown CapabilityHot Short
Safe Shutdown
Fire Barrier
ML03294009827 March 2003Riv Backfit StatusBackfit