Plant Engineering Branch Open Items Interim Safety Basis SITE ACT PEB Item Issue Planned Closure Quarter Disposition/Status/URI for Significance ORG LEAD Interim Safety Basis CGS PEB RPM URI Procedure provided CY 2004 Quarter 1 SRAs determined that this issue is Green. RPM 2003 inadequate post fire direction Licensee revised will provide feeder for close out this item in 002-for control room evacuation procedure current RI inspection report.
03 with two examples.
Unresolved for significancein IR 2003-02 dated June 2, 2003.
Draft Closure in review for inclusion in IR 2004-002 submitted to DRP 3/23 CWY NRR NFO URI Failure to protect associated CY 2005 Quarter 4 Waiting on associated circuits generic resolution.
2003 circuits from fire damage or Licensee has changed fire 007-provide diverse means to pre-plans to include the 01 achieve safe shutdown identified components as Unresolved for significance and compliance in IR being subject to possible 2003-007 dated 11/28/2003 fire-induced mal-operation.
R:\\2003\\CW2003-007-nfo.wod CWY NRR NFO LER Potential for draining the CY 2004 Quarter 1 Long term waiting on associated circuits generic PEB 2002 RWST to containment sumps Licensee has changed fire resolution.
006-due to hot short.
pre-plans to include the 00 identified components as On 2/19/04, decided to close the LER as an AV in being subject to possible the next resident report, consistent with the AV fire-induced mal-operation.
Enforcement Manual, and track until associated 50-Also, fire watches have circuits guidance is provided. Being written as of 483/2 been implemented.
3/30/04 for inclusion in report 2004-02.
004-
_ _ _ _ _ _0 2
Page 4 of 12 2I-