MONTHYEARET 10-0013, License Amendment Request to the Approved Fire Protection Program to Remove High/Low Pressure Interface Designation from the Pressurizer Power Operated Relief Valves and Their Associated Block Valves2010-04-13013 April 2010 License Amendment Request to the Approved Fire Protection Program to Remove High/Low Pressure Interface Designation from the Pressurizer Power Operated Relief Valves and Their Associated Block Valves Project stage: Request ML1013703072010-05-12012 May 2010 Proposed License Amendment Request Regarding Presure Boundary Designation for Pressurizer Power Operated Relief Valves Project stage: Other ML1013703042010-05-12012 May 2010 PORV Pressure Boundary Designation, Acceptance Review-Non Acceptance with Opportunity to Supplement Project stage: Acceptance Review ML1013700912010-05-20020 May 2010 Non-Acceptance with Opportunity to Supplement License Amendment Request, Revise Approved Fire Protection Program to Remove High/Low Pressure Designation from Pressurizer Power Operated Relief Valves Project stage: Other WM 10-0016, Response to Supplemental Information Request for License Amendment to Remove the High/Low Pressure Interface Designation from the Pressurizer Power Operated Relief Valves (Porvs) and Their Associated Block Valves2010-06-0101 June 2010 Response to Supplemental Information Request for License Amendment to Remove the High/Low Pressure Interface Designation from the Pressurizer Power Operated Relief Valves (Porvs) and Their Associated Block Valves Project stage: Supplement ML1015400482010-06-16016 June 2010 Acceptance of Requested Licensing Action, License Amendment Request, Revise Approved Fire Protection Program to Remove High/Low Pressure Designation from Pressurizer Power Operated Relief Valves Project stage: Acceptance Review ML1101106702011-02-0707 February 2011 Fire Protection Safety Evaluation Input for Wolf Creek Generating Station Regarding License Amendment Request for Deviation from the Fire Protection Program Requirements Project stage: Approval ET 11-0002, Changes to License Condition 2.C(5)2011-02-17017 February 2011 Changes to License Condition 2.C(5) Project stage: Request ML1105301832011-03-0909 March 2011 Issuance of Amendment No. 193, Revise Approved Fire Protection Program, Described in the Updated Safety Analysis Report, to Remove High/Low Pressure Designation from Pressurizer Power Operated Relief Valves Project stage: Approval 2010-06-01
[Table View] |
|
---|
Category:- No Document Type Applies
MONTHYEARML22034A3952022-02-16016 February 2022 Enclosure 3 - IP 96001 CY2021 - IR 8 Baseline Inspection Completion ML22034A3972022-02-16016 February 2022 Enclosure 2 - IP 92707 CY2021 - IR 8 Baseline Inspection Completion ML22034A3992022-02-16016 February 2022 Enclosure 1 - IP 71130.03 Cy 2021 - IR 8 Baseline Inspection Completion ML18044A1052018-02-0707 February 2018 Summary of Changes to One Procedure and One Form That Implement the Wolf Creek Generating Station (WCGS) Radiological Emergency Response Plan (Rerp). Includes Procedure AP 06-004, Rev. 8 & Form Epf 06-011-01, Rev. 5 ML17284A1852017-10-0505 October 2017 Attachment to RA 17-0110 - Summary of Changes to Two Procedures and Two Forms That Implement the Wolf Creek Generating Station Radiological Emergency Response Plan ML17060A1492017-02-10010 February 2017 FOIA/PA-2017-0110 - Resp 1 - Final, Agency Records Subject to the Request Are Enclosed. Part 3 of 6 ML17060A1462017-02-10010 February 2017 FOIA/PA-2017-0110 - Resp 1 - Final, Agency Records Subject to the Request Are Enclosed. Part 1 of 6 ML15014A1532015-01-14014 January 2015 Attachment 1- NEI Comments on NRC Working Group Recommendations to Revise the Substantive Cross-Cutting Issue Process ML15014A1602015-01-14014 January 2015 Attachment 2 - NRC Working Group Recommendations to Revise the Substantive Cross-Cutting Issue Process ML14258B0892014-09-18018 September 2014 Public Notice, Notice of Consideration of Issuance of Amendment, Revise Technical Specification 3.4.15, RCS Leakage Detection Instrumentation, Completion Time Extension (Exigent Circumstances) ML13246A3712013-06-19019 June 2013 Ope Communication on Augmented Inspection - Wolf Creek Generating Station Loss of Offsite Power and Notification of Unusual Event ML13073A2052013-03-15015 March 2013 YT020130045 - Wolf Creek Generating Station - Enclosure - Preliminary Accident Sequence Precursor Analysis of January 2012 Loss of Offsite Power Event ML12056A0522012-03-12012 March 2012 Enclosure 6 - List of Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status ML1013703072010-05-12012 May 2010 Proposed License Amendment Request Regarding Presure Boundary Designation for Pressurizer Power Operated Relief Valves ML0933507512010-01-14014 January 2010 Temporary Instruction 2515/180, Managing Fatigue ML0806704192008-03-0707 March 2008 CDBI Findings ML0804603992008-02-13013 February 2008 Power Reactor Inattentive Officer Findings 2004-Present ML0732400242007-10-25025 October 2007 Examples of Max Thermal Power License Conditions ML0726303192007-09-14014 September 2007 P. Paquin Ltr Amendment to Certificate of Compliance No. 6574 for the Model No. 3-82B Package (TAC L24116)/ Register User List ML0720000552007-07-17017 July 2007 License Renewal; USAR Information on Liquid, Gaseous, and Solid Radioactive Waste Management Systems ML0714501502007-05-0909 May 2007 Responses A39 - A45 and A48 - A50 to Additional Information Needs Identified During Audit of NRC Request for Additional Information Related to License Renewal Application ML0714501492007-05-0909 May 2007 Responses A11 - A19 and A23 to Additional Information Needs Identified During Audit of NRC Request for Additional Information Related to License Renewal Application ML0717704612007-02-0606 February 2007 Procedure AP 05F-001, Rev. 3, Design Verification. ML0634705992006-12-14014 December 2006 Plant Service List ML0717704602006-07-12012 July 2006 Procedure AP 05-005, Rev. 11A, Design, Implementation & Configuration Control of Modifications. ML0607502682006-03-10010 March 2006 Protection of Safe Shutdown Capabilities ML0606902752006-03-0303 March 2006 Plant Engineering Branch Open Items, Interim Safety Basis ML0606902792006-02-28028 February 2006 Revised Oversight Process - Item List Report ML0606902892005-10-31031 October 2005 PIR 20052757 Information ML0505404692004-02-10010 February 2004 Dynamic Web Page Printout Dated 02/10/2004, ROP PIM Report - All Sites - Event Dates: 01/01/2003 - 02/10/2004 ML0505404642004-02-0909 February 2004 Dynamic Web Page Printout Dated 02/09/2004 Regarding Applied Violations for Nuclear Power Plants ML0329401042003-10-0707 October 2003 Riv Backfit Status ML0606902772003-05-30030 May 2003 Sp - 10 CFR-50 Appendix R - Fire Protection of Safe Shutdown Capability ML0329400982003-03-27027 March 2003 Riv Backfit Status 2022-02-16
[Table view] |
Text
SUPPLEMENTAL INFORMATION NEEDED PROPOSED LICENSE AMENDMENT REQUEST REGARDING THE PRESSURE BOUNDARY DESIGNATION FOR THE PRESSURIZER POWER OPERATED RELIEF VALVES (PORVS)
AND THEIR ASSOCIATED BLOCK VALVES (ME3766)
WOLF CREEK NUCLEAR GENERATING STATION DOCKET NO. 50-482 By letter dated April 13, 2010, (Agencywide Documents Access and Management System (ADAMS) Accession Number ML101100479), Wolf Creek Nuclear Operating Corporation (WCNOC) requested an amendment to the Renewed Facility Operating License No. NPF-42 for the Wolf Creek Generating Station (WCGS). This license amendment request (LAR) is seeking approval by the Commission, pursuant to License Condition 2.C(5), to make changes to the approved fire protection program as described in the WCGS Updated Safety Analysis Report (USAR). Specifically, a revision to the response to Nuclear Regulatory Commission (NRC)
Question 280.5, documented on page 280-5 of the NRC Questions Section at the end of the USAR is requested regarding the removal of the high/low pressure interface designation from the pressurizer Power Operated Relief Valves (PORVs) and their associated block valves.
The above referenced license condition allows WCNOC to make changes to the approved fire protection program without prior NRC approval only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire. WCNOC has determined that NRC review and approval of the proposed change is warranted.
The NRC Fire Protection Branch has reviewed the LAR and concluded that the scope of the analysis is incomplete (LIC-109, 3.1.2) since impacts on the plant are not discussed in the amendment. Therefore, additional information is needed to enable an independent assessment regarding the acceptability of the proposed amendment request.
To enable this independent assessment the following information is required:
- Provide a description of the safety impact that the proposed license change would have on the plant.
- Provide a description of any modifications or changes to the operation of the pressurizer Power Operated Relief Valves (PORVs) and their associated block valves, including electrical control circuits and cable rerouting, which would occur if this license change were accepted.
- Provide a description of any changes to Post Fire Safe Shutdown Analysis, including new or revised procedures, operator manual actions and other operator post fire guidance documents, which would occur if this license change were accepted.