ML23165A249 | 14 June 2023 | 4Q 2022 Performance Summary U4 | Significance Determination Process |
ML22334A083 | 1 December 2022 | Attachment 1 - Targeted ITAAC Listing VEGP Unit 4 | |
ML22334A084 | 1 December 2022 | Attachment 2 - ITAAC Family Listing VEGP Unit 4 | |
ML21278A355 | 5 October 2021 | Enclosure 2: Safety Determination Input for IEEE 384 Separation Issues and Safety Determination Input for IEEE 384 Separation Issues within IDS Enclosures | Hot Short Emergency Lighting Battery sizing |
ML21278A356 | 5 October 2021 | Enclosure 3: AP1000 Plant At-Power Internal Events PRA Risk Assessment for Spatial Separation Criteria Nonconformances | Mission time Internal Flooding Probabilistic Risk Assessment Large early release frequency |
ML21277A021 | 4 October 2021 | 2021 Q2 Cross Cutting Page | |
ML20358A180 | 23 December 2020 | (VEGP) Units 3 and 4 - Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2) - Alternative Requirements for A8ME Section XI Examination Coverage of Weldolet Branch Connection Welds (VEGP 3&4-PSI/ISI-ALT-15) | Nondestructive Examination Liquid penetrant |
ML20343A043 | 8 December 2020 | Construction Reactor Oversight Process Resources December 2020 | |
ML20022A060 | 20 January 2020 | Assessment of Communications in Response Request for Information for Vogtle Electric Generating Plant Units 3 and 4 | FLEX Fukushima Dai-Ichi |
ML19325C672 | 21 November 2019 | Staff Bullets for October 21, 2019 Public Meeting, Vogtle Electric Generating Plant Units 3 and 4, LAR-19-017, Request for License Amendment: Removal of the PRHR-HX Natural Circulation Test | |
ML19233A007 | 22 August 2019 | NRC Contacts for New Power Reactors | |
ML19113A092 | 23 April 2019 | Functional Arrangement ITAAC Acceptance Criteria R1 | |
ML17235B148 | 23 August 2017 | U.S. Nuclear Regulatory Commission - Tornado Missile Risk Evaluator (TMRE) Methodology Topics and Methodology Feedback | Probabilistic Risk Assessment Tornado-Generated Missile Tornado Generated Missile Tornado Missile Protection Large early release frequency Tornado Missile Risk Evaluator |
ML14141A627 | 20 May 2014 | LTR-14-0288-Ticket - Senator Edward J. Markey Ltr. Information About NRC-Sanctioned Job Shadow Program with China | |
ML14094A358 | 8 April 2014 | Enclosure - PWROG Peer Review Form 4-03-14, Table 1 | Internal Flooding |
ML14078A621 | 1 April 2014 | Enclosure 3 - RASCAL 4.3 Inputs for Site Boundary Dose Projections | |
ML14072A454 | 6 March 2014 | Response to NRC Request for Additional Information Site Plan, 2-1, Sheet 1 of 1 | |
ML14072A463 | 6 March 2014 | Response to NRC Request for Additional Information 2-1, Sheet 3 of 10 | |
ML12056A052 | 12 March 2012 | Enclosure 6 - List of Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status | |
ML113540625 | 10 February 2012 | Amendment to Indemnity Agreement No. B-107 - Amendment No. 6 | |
ML12010A034 | 28 December 2011 | Onsite Ground/Surface Water Questionnaire, Onsite Radiological Effluent/Remp Monitoring Program | |
ML112200505 | 4 August 2011 | Crop Tabletop Example Findings | Commercial Grade Dedication Coatings Nondestructive Examination Condition Adverse to Quality Earthquake Liquid penetrant Scaffolding |
ML113260428 | 3 January 2011 | NRC 2011 Vogtle | |
ML101930193 | 9 June 2010 | Undated Onsite Ground/Surface Water Monitoring Questionnaire 4 for Vogtle | |
ML101930460 | 25 March 2010 | List of Historical Leaks and Spills at Us Commercial Nuclear Power Plants | |
NL-08-0869, Enclosure 11, List of Regulatory Commitments | 27 June 2008 | Enclosure 11, List of Regulatory Commitments | |
ML081190202 | 24 April 2008 | End of Cycle Public Meeting Attendee List | |
ML080800036 | 13 March 2008 | List of Attendees, 03/13/2008 Summary of Meeting with Eight Operating Nuclear Power Plant Licensees to Discuss Emerging Metallurgical Issues Certain Welds in Reactor Coolant System for Pressurized-Water Reactors | |
ML080670419 | 7 March 2008 | CDBI Findings | Reactor Vessel Water Level Stroke time Past operability Battery sizing |
ML073240764 | 5 November 2007 | Vogtle - FSAR-2, Calculation Package | |
ML073240747 | 5 November 2007 | Electrical Design Parameters of Typical 230kv and 500kv Transmission Lines Terminating Into Plant Vogtle | |
ML073240711 | 5 November 2007 | Project Wings (Wildlife Incentives for Nongame and Game Species) | |
ML073240024 | 25 October 2007 | Examples of Max Thermal Power License Conditions | |
ML072630114 | 14 September 2007 | / P. Paquin Ltr Amendment to Certificate of Compliance No. 9208 for the Model No. 10-142B Package (TAC L24117)/S121170 | |
ML073240704 | 27 June 2007 | Cooperative Safe Harbor Management Agreement (2005 Updated Version) No. 28 for Red-Cockaded Woodpeckers (Picoides Borealis) and Their Habitat on Private Land in Georgia | |
ML071410385 | 17 May 2007 | Enclosure 1 - Attendee List for 05/17/2007 Vogtle Public Meeting | |
ML071340212 | 10 May 2007 | Log of Congressional Correspondence for January 16, 2007 - February 28, 2007 | |
ML063470599 | 14 December 2006 | Plant Service List | |
ML061920335 | 14 April 2006 | Attachment 3 - List of Attendees for April 14, 2006 Public Meeting to Discuss Vogtle Early Site Permit Seismic Activities | Earthquake |
ML060900641 | 11 October 2005 | Spent Fuel Pool Action Plan, from Entergy | |
ML073240743 | 22 August 2005 | Submittal of Photocopies of the Highway Capacity Manual 2000 | |
ML073240736 | 21 February 2005 | Safe Drinking Water Information System | |
ML040410492 | 20 February 2004 | Order EA-03-009 Service List | |
ML073240717 | 24 July 2003 | Movement and Population Size of American Shad Near a Low-Head Lock and Dam | |
ML073240729 | 31 January 2000 | Habitat Utilization and Biological Characteristics of Adult Atlantic Sturgeon in Two South Carolina Rivers | |
ML073240766 | 31 July 1999 | Savannah River Basin Comprehensive Reconnaissance Study | |
ML073240741 | 6 June 1999 | State of Georgia, Permit No. GA0026786, Authorization to Discharge Under the National Pollutant Discharge Elimination System | Grab sample |
ML073240690 | 1 April 1998 | State of Georgia, Permit to Operate a Public Water System Issued on 04/01/1998 to Vogtle Plant | |
ML073240746 | 8 May 1997 | Georgia Power Transmission Bulletin, Maintenance of Plant Vogtle Transmission Line Corridors | |
ML063000225 | 8 May 1997 | Georgia Power Transmission Bulletin No. 6-10: Maintenance of Plant Vogtle Transmission Line Corridors. Revised |