Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML19301A00118 September 2019Draft of TSTF-577, Revision 0a, Performance Based Frequencies for Steam Generator Tube InspectionsPost Accident Monitoring
Nondestructive Examination
Pressure and Temperature Limits Report
Surveillance Frequency Control Program
ML19099A2218 April 2019Draft of TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated PositionUltimate heat sink
Surveillance Frequency Control Program
ML18211A43731 May 2018Draft TSTF-568, Revision 1, Clarify Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2Surveillance Frequency Control Program
ML17297B78624 October 2017Email Attachment Pages from TSTF-542-ARev2Hydrostatic
ML17289A97116 October 2017TSTF-542 Variation DiscussionReactor Vessel Water Level
ML17026A23223 January 20171/23/17 Meeting Attendees Page 1
ML16215A1312 August 2016TSTF-553R1 Justification, Attachment 2 - DraftPost Accident Monitoring
Enforcement Discretion
ML16124A85828 April 2016Meeting Attendees
ML16054A50518 February 2016TSTF Quarterly Meeting Attendee List
ML16056A25118 February 2016Technical Specifications Task Force Improved Standard Technical Specifications Change Traveler (TSTF-557-T, Revision 0)Surveillance Frequency Control Program
ML15288A36520 November 2015TSTF-553 Pre-submittal Meeting Attendee List
ML15104A5725 February 2015TSTF Meeting Attendees
ML14196A4197 July 2014TSTF Handout from 7/10/14 Meeting Draft Secondary Containment TS MarkupSurveillance Frequency Control Program
ML15034A15610 April 2014TSTF Handout from 04/10/2014 Meeting - Traveler Review PriorityWater Inventory Control
ML13036A38120 May 2013Model SE for Plant-Specific Adoption of TSTF-426, Revision 5, Revise or Add Actions to Preclude Entry Into LCO 3.0.3 - RITSTF Initiatives 6b & 6c, Using the CLIIPShutdown Margin
Anticipated operational occurrence
Probabilistic Risk Assessment
Large early release frequency
ML12158A51313 September 2012TSTF-522 NOA Disposition of Comments
ML14328A42628 June 2012TSTF Handout from November 13, 2014, Meeting - Agenda Item 3.D - TSTF-412 White Paper IITornado Generated Missile
ML12072A1592 May 2012Disposition of Comments on Federal Register Notice for Comment on Traveler TSTF-432
ML1202003842 May 2012Model SE for NOA of TSTF-432Shutdown Margin
Reactor Vessel Water Level
Ultimate heat sink
Probabilistic Risk Assessment
Pressure Boundary Leakage
Recently irradiated fuel
Offsite Circuit
ML1202004847 March 2012TSTF-505 Disposition of Comments for NOAProbabilistic Risk Assessment
ML1202004017 March 2012Model SE of TSTF-505 Published for NOAProbabilistic Risk Assessment
Large early release frequency
Backfit
ML11322017130 November 2011Draft TS and TS Bases for 11/17/11 Meeting TSTF-523 RevisionSurveillance Frequency Control Program
ML1126902396 November 2011Proposed Model Safety Evaluation for Plant-Specific Adoption of Technical Specifications Task Force Traveler TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b.Probabilistic Risk Assessment
Large early release frequency
Backfit
ML1125900918 September 2011WOG 3.4.16 RCS Specific Activity for TSTF-490
ML11175179222 August 2011Model Application for Plant-Specific Adoption of Traveler TSTF-500, Revision 2, DC Electrical Rewrite - Update to TSTF-360Shutdown Margin
Anticipated operational occurrence
Probabilistic Risk Assessment
ML11175178822 August 2011NRC Staff Disposition of Comments to May 4, 2010 (75 Fr 23822), Federal Register Nfc TSTF-500, Rev 2Probabilistic Risk Assessment
ML1113206198 June 2011Meeting Handout for Discussion of Interaction Between TSTF-425 and TSTF-500
ML11038031123 March 20112/9/11 Meeting Handout - NRC Staff'S Draft LCO 3.0.X
ML1027003732 February 2011NRC Staff Disposition of Comments to TSTF-423, Revision 1
ML11014001212 January 2011Industry Review of NRC Proposed TSTF-505 Approach
ML10134027820 December 2010NRC Disposition of Public Comments on TSTF-513, Rev. 2, Revise PWR Operability Requirements & Actions for RCS Leakage InstrumentationMission time
Functionality Assessment
Fuel cladding
ML11014001113 December 2010TSTF-505 NRC Proposed ApproachSafe Shutdown
Ultimate heat sink
Offsite Circuit
ML1031902748 December 2010Meeting Handout Draft of Proposed Model Application for Plant-Specific Adoption of TSTF Traveler TSTF-500, Revision 2, DC Electrical Rewrite - Update to TSTF-360.Shutdown Margin
Anticipated operational occurrence
Probabilistic Risk Assessment
Surveillance Frequency Control Program
ML1023007277 December 2010Disposition of Public Comments Received on TSTF-514
ML10231036423 November 2010Disposition of Public Comments Received on TSTF-431Probabilistic Risk Assessment
ML10092056314 May 2010NRC Staff Disposition of Comments to August 20, 2009, Federal Register Notice, Notice of Opportunity for Public Comment on the Proposed Model Safety Evaluation for Plant Specific Adoption of Technical Specification Task Force Traveler-501,
ML10085009414 May 2010TSTF-501 Models
ML09343008610 March 2010NRC Staff Disposition of Comments to November 10, 2009, Federal Register Notice for Comment on TSTF-493Anticipated operational occurrence
Incorporated by reference
ML09308002830 October 2009Proposed Models for Plant-Specific Adoption of TSTF Traveler 493, Revision 4, Clarify Application of Setpoint Methodology for Lsss Functions.Reactor Vessel Water Level
Anticipated operational occurrence
Incorporated by reference
Scram Discharge Volume
ML0819004433 July 2008Enclosure to TSTF-507, Revision 0, Part 3 of 3Safe Shutdown
Time of Discovery
Shutdown Margin
Stroke time
Anticipated operational occurrence
Incorporated by reference
Missed surveillance
Scram Discharge Volume
Overtravel
Earthquake
Recently irradiated fuel
Offsite Circuit
Grace period
Failure to Scram
ML0819004423 July 2008Enclosure to TSTF-507, Revision 0, Part 2 of 3
ML0819004323 July 2008Enclosure to TSTF-507, Revision 0, Part 1 of 3
ML07200047319 July 2007Questions on NRC Review Fees
ML19101A21518 December 2006TSTF-471, Revision 1, Eliminate Use of Term Core Alterations in Actions and NotesShutdown Margin