Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML23354A210 | 20 December 2023 | File 2B Exam Administrative Items | |
ML23165A249 | 14 June 2023 | 4Q 2022 Performance Summary U4 | Significance Determination Process |
ML22334A083 | 1 December 2022 | Attachment 1 - Targeted ITAAC Listing VEGP Unit 4 | |
ML22334A084 | 1 December 2022 | Attachment 2 - ITAAC Family Listing VEGP Unit 4 | |
ML21278A356 | 5 October 2021 | Enclosure 3: AP1000 Plant At-Power Internal Events PRA Risk Assessment for Spatial Separation Criteria Nonconformances | Mission time Internal Flooding Probabilistic Risk Assessment Large early release frequency |
ML21278A355 | 5 October 2021 | Enclosure 2: Safety Determination Input for IEEE 384 Separation Issues and Safety Determination Input for IEEE 384 Separation Issues within IDS Enclosures | Hot Short Emergency Lighting Battery sizing |
ML21277A021 | 4 October 2021 | 2021 Q2 Cross Cutting Page | |
ML20358A180 | 23 December 2020 | (VEGP) Units 3 and 4 - Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2) - Alternative Requirements for A8ME Section XI Examination Coverage of Weldolet Branch Connection Welds (VEGP 3&4-PSI/ISI-ALT-15) | Nondestructive Examination Liquid penetrant |
ML20343A043 | 8 December 2020 | Construction Reactor Oversight Process Resources December 2020 | |
ML20022A060 | 20 January 2020 | Assessment of Communications in Response Request for Information for Vogtle Electric Generating Plant Units 3 and 4 | FLEX Fukushima Dai-Ichi |
ML19325C672 | 21 November 2019 | Staff Bullets for October 21, 2019 Public Meeting, Vogtle Electric Generating Plant Units 3 and 4, LAR-19-017, Request for License Amendment: Removal of the PRHR-HX Natural Circulation Test | |
ML19233A007 | 22 August 2019 | NRC Contacts for New Power Reactors | |
ML19113A092 | 23 April 2019 | Functional Arrangement ITAAC Acceptance Criteria R1 | |
ML17235B148 | 23 August 2017 | U.S. Nuclear Regulatory Commission - Tornado Missile Risk Evaluator (TMRE) Methodology Topics and Methodology Feedback | Probabilistic Risk Assessment Tornado-Generated Missile Tornado Generated Missile Tornado Missile Protection Large early release frequency Tornado Missile Risk Evaluator |
ML14141A627 | 20 May 2014 | LTR-14-0288-Ticket - Senator Edward J. Markey Ltr. Information About NRC-Sanctioned Job Shadow Program with China | |
ML14094A358 | 8 April 2014 | Enclosure - PWROG Peer Review Form 4-03-14, Table 1 | Internal Flooding |
RC-14-0032, Virgil C. Summer Unit 1, License Amendment Request LAR-14-02392, Request for NRC Approval of Proposed Changes to Emergency Action Levels. Attachments Iii, Iv, V & Vi: Technical Bases for Proposed EALs (Clean Copy), NEI 99-01 Revision 6 EA | 7 April 2014 | Virgil C. Summer Unit 1, License Amendment Request LAR-14-02392, Request for NRC Approval of Proposed Changes to Emergency Action Levels. Attachments Iii, Iv, V & Vi: Technical Bases for Proposed EALs (Clean Copy), NEI 99-01 Revision 6 EAL | Safe Shutdown Time of Discovery High winds Reactor Vessel Water Level Packing leak Ultimate heat sink Offsite Dose Calculation Manual Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Operating Basis Earthquake Operator Manual Action Spent Fuel Pool Instrumentation Earthquake Fuel cladding Pressure Boundary Leakage Grace period |
RC-14-0032, License Amendment Request LAR-14-02392, Request for NRC Approval of Proposed Changes to Emergency Action Levels. Attachments III, IV, V & VI: Technical Bases for Proposed EALs (Clean Copy), NEI 99-01 Revision 6 EAL Comparison.. | 7 April 2014 | License Amendment Request LAR-14-02392, Request for NRC Approval of Proposed Changes to Emergency Action Levels. Attachments III, IV, V & VI: Technical Bases for Proposed EALs (Clean Copy), NEI 99-01 Revision 6 EAL Comparison.. | Safe Shutdown Time of Discovery High winds Reactor Vessel Water Level Packing leak Ultimate heat sink Offsite Dose Calculation Manual Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Operating Basis Earthquake Operator Manual Action Spent Fuel Pool Instrumentation Earthquake Fuel cladding Pressure Boundary Leakage Grace period |
ML14122A158 | 7 April 2014 | License Amendment Request LAR-14-02392, Request for NRC Approval of Proposed Changes to Emergency Action Levels. EPP-108, Enclosure 1, Revision 01 (Draft E) | Safe Shutdown High winds Reactor Vessel Water Level Packing leak Ultimate heat sink Internal Flooding Operator Manual Action Earthquake Fuel cladding Pressure Boundary Leakage |
ML14122A157 | 7 April 2014 | License Amendment Request LAR-14-02392, Request for NRC Approval of Proposed Changes to Emergency Action Levels. Attachment Ii: Technical Bases Document for the Proposed EALs (Marked-Up Copy) | Safe Shutdown Time of Discovery Reactor Vessel Water Level Ultimate heat sink Offsite Dose Calculation Manual Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Operating Basis Earthquake Spent Fuel Pool Instrumentation Earthquake Fuel cladding Grace period |
RC-14-0032, Virgil C. Summer Unit 1, License Amendment Request LAR-14-02392, Request for NRC Approval of Proposed Changes to Emergency Action Levels. Attachment Ii: Technical Bases Document for the Proposed EALs (Marked-Up Copy) | 7 April 2014 | Virgil C. Summer Unit 1, License Amendment Request LAR-14-02392, Request for NRC Approval of Proposed Changes to Emergency Action Levels. Attachment Ii: Technical Bases Document for the Proposed EALs (Marked-Up Copy) | Safe Shutdown Time of Discovery Reactor Vessel Water Level Ultimate heat sink Offsite Dose Calculation Manual Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Operating Basis Earthquake Spent Fuel Pool Instrumentation Earthquake Fuel cladding Grace period |
RC-14-0032, Virgil C. Summer Unit 1, License Amendment Request LAR-14-02392, Request for NRC Approval of Proposed Changes to Emergency Action Levels. EPP-108, Enclosure 1, Revision 01 (Draft E) | 7 April 2014 | Virgil C. Summer Unit 1, License Amendment Request LAR-14-02392, Request for NRC Approval of Proposed Changes to Emergency Action Levels. EPP-108, Enclosure 1, Revision 01 (Draft E) | Safe Shutdown High winds Reactor Vessel Water Level Packing leak Ultimate heat sink Internal Flooding Operator Manual Action Earthquake Fuel cladding Pressure Boundary Leakage |
ML14078A621 | 1 April 2014 | Enclosure 3 - RASCAL 4.3 Inputs for Site Boundary Dose Projections | |
ML14072A454 | 6 March 2014 | Response to NRC Request for Additional Information Site Plan, 2-1, Sheet 1 of 1 | |
ML14072A463 | 6 March 2014 | Response to NRC Request for Additional Information 2-1, Sheet 3 of 10 | |
ML12056A052 | 12 March 2012 | Enclosure 6 - List of Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status | |
ML113540625 | 10 February 2012 | Amendment to Indemnity Agreement No. B-107 - Amendment No. 6 | |
ML12010A034 | 28 December 2011 | Onsite Ground/Surface Water Questionnaire, Onsite Radiological Effluent/Remp Monitoring Program | |
ML113202870 | 15 November 2011 | V. C. Summer Initial Exam 2011-301 Final SRO Written Exam | Hot Short Locked High Radiation Area Earthquake |
ML112200505 | 4 August 2011 | Crop Tabletop Example Findings | Commercial Grade Dedication Coatings Nondestructive Examination Condition Adverse to Quality Earthquake Liquid penetrant Scaffolding |
ML111520466 | 1 June 2011 | Meeting Summary - V. C. Summer - Attendees | |
ML113260428 | 3 January 2011 | NRC 2011 Vogtle | |
ML112800529 | 20 October 2010 | NRC 2011 VC Summer | |
ML101930193 | 9 June 2010 | Undated Onsite Ground/Surface Water Monitoring Questionnaire 4 for Vogtle | |
ML101930460 | 25 March 2010 | List of Historical Leaks and Spills at Us Commercial Nuclear Power Plants | |
ML100330863 | 29 January 2010 | NFPA 805 Transition Pilot Plant FAQ 09-0057, Revision 3, New Shutdown Strategy | Safe Shutdown Fire Protection Program |
ML093350751 | 14 January 2010 | Temporary Instruction 2515/180, Managing Fatigue | |
RC-09-0159, VCSNS AST LAR RAI Response Cd Contents | 23 December 2009 | VCSNS AST LAR RAI Response Cd Contents | |
ML093440733 | 10 December 2009 | Afpb Staff Response to NFPA 805 Transition Pilot Plant FAQ 09-0057, Revision 1 | Safe Shutdown Fire Protection Program |
ML093410615 | 7 December 2009 | Evacuation Time Estimate Analysis | |
ML093020058 | 21 October 2009 | NFPA 805 Transition Pilot Plant FAQ 09-0057, Revision 1 | Safe Shutdown Fire Protection Program |
ML093520020 | 21 October 2009 | NFPA 805 Transition Pilot Plant FAQ 09-0057, Revision 2 | Safe Shutdown Fire Protection Program |
ML091060209 | 20 April 2009 | Draft Responses to Request for Additional Information for V. C. Summer Evacuation Time Estimate Analysis | |
ML091811059 | 9 April 2009 | NFPA 805 Transition Pilot Plant FAQ 09-0057 | Safe Shutdown Fire Protection Program |
ML091060212 | 9 April 2009 | V.C. Summer Evacuation Time Estimate Analysis - Open Items and Confirmatory Items | |
ML082560816 | 12 September 2008 | VCSNS GL 96-06 SRI Actions | Stroke time |
NL-08-0869, Enclosure 11, List of Regulatory Commitments | 27 June 2008 | Enclosure 11, List of Regulatory Commitments | |
ML081190202 | 24 April 2008 | End of Cycle Public Meeting Attendee List | |
ML080800036 | 13 March 2008 | List of Attendees, 03/13/2008 Summary of Meeting with Eight Operating Nuclear Power Plant Licensees to Discuss Emerging Metallurgical Issues Certain Welds in Reactor Coolant System for Pressurized-Water Reactors | |
ML080670419 | 7 March 2008 | CDBI Findings | Reactor Vessel Water Level Stroke time Past operability Battery sizing |