Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML23354A21020 December 2023File 2B Exam Administrative Items
ML23165A24914 June 20234Q 2022 Performance Summary U4Significance Determination Process
ML22334A0831 December 2022Attachment 1 - Targeted ITAAC Listing VEGP Unit 4
ML22334A0841 December 2022Attachment 2 - ITAAC Family Listing VEGP Unit 4
ML21278A3565 October 2021Enclosure 3: AP1000 Plant At-Power Internal Events PRA Risk Assessment for Spatial Separation Criteria NonconformancesMission time
Internal Flooding
Probabilistic Risk Assessment
Large early release frequency
ML21278A3555 October 2021Enclosure 2: Safety Determination Input for IEEE 384 Separation Issues and Safety Determination Input for IEEE 384 Separation Issues within IDS EnclosuresHot Short
Emergency Lighting
Battery sizing
ML21277A0214 October 20212021 Q2 Cross Cutting Page
ML20358A18023 December 2020(VEGP) Units 3 and 4 - Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2) - Alternative Requirements for A8ME Section XI Examination Coverage of Weldolet Branch Connection Welds (VEGP 3&4-PSI/ISI-ALT-15)Nondestructive Examination
Liquid penetrant
ML20343A0438 December 2020Construction Reactor Oversight Process Resources December 2020
ML20022A06020 January 2020Assessment of Communications in Response Request for Information for Vogtle Electric Generating Plant Units 3 and 4FLEX
Fukushima Dai-Ichi
ML19325C67221 November 2019Staff Bullets for October 21, 2019 Public Meeting, Vogtle Electric Generating Plant Units 3 and 4, LAR-19-017, Request for License Amendment: Removal of the PRHR-HX Natural Circulation Test
ML19233A00722 August 2019NRC Contacts for New Power Reactors
ML19113A09223 April 2019Functional Arrangement ITAAC Acceptance Criteria R1
ML17235B14823 August 2017U.S. Nuclear Regulatory Commission - Tornado Missile Risk Evaluator (TMRE) Methodology Topics and Methodology FeedbackProbabilistic Risk Assessment
Tornado-Generated Missile
Tornado Generated Missile
Tornado Missile Protection
Large early release frequency
Tornado Missile Risk Evaluator
ML14141A62720 May 2014LTR-14-0288-Ticket - Senator Edward J. Markey Ltr. Information About NRC-Sanctioned Job Shadow Program with China
ML14094A3588 April 2014Enclosure - PWROG Peer Review Form 4-03-14, Table 1Internal Flooding
RC-14-0032, Virgil C. Summer Unit 1, License Amendment Request LAR-14-02392, Request for NRC Approval of Proposed Changes to Emergency Action Levels. Attachments Iii, Iv, V & Vi: Technical Bases for Proposed EALs (Clean Copy), NEI 99-01 Revision 6 EA7 April 2014Virgil C. Summer Unit 1, License Amendment Request LAR-14-02392, Request for NRC Approval of Proposed Changes to Emergency Action Levels. Attachments Iii, Iv, V & Vi: Technical Bases for Proposed EALs (Clean Copy), NEI 99-01 Revision 6 EALSafe Shutdown
Time of Discovery
High winds
Reactor Vessel Water Level
Packing leak
Ultimate heat sink
Offsite Dose Calculation Manual
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Operating Basis Earthquake
Operator Manual Action
Spent Fuel Pool Instrumentation
Earthquake
Fuel cladding
Pressure Boundary Leakage
Grace period
RC-14-0032, License Amendment Request LAR-14-02392, Request for NRC Approval of Proposed Changes to Emergency Action Levels. Attachments III, IV, V & VI: Technical Bases for Proposed EALs (Clean Copy), NEI 99-01 Revision 6 EAL Comparison..7 April 2014License Amendment Request LAR-14-02392, Request for NRC Approval of Proposed Changes to Emergency Action Levels. Attachments III, IV, V & VI: Technical Bases for Proposed EALs (Clean Copy), NEI 99-01 Revision 6 EAL Comparison..Safe Shutdown
Time of Discovery
High winds
Reactor Vessel Water Level
Packing leak
Ultimate heat sink
Offsite Dose Calculation Manual
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Operating Basis Earthquake
Operator Manual Action
Spent Fuel Pool Instrumentation
Earthquake
Fuel cladding
Pressure Boundary Leakage
Grace period
ML14122A1587 April 2014License Amendment Request LAR-14-02392, Request for NRC Approval of Proposed Changes to Emergency Action Levels. EPP-108, Enclosure 1, Revision 01 (Draft E)Safe Shutdown
High winds
Reactor Vessel Water Level
Packing leak
Ultimate heat sink
Internal Flooding
Operator Manual Action
Earthquake
Fuel cladding
Pressure Boundary Leakage
ML14122A1577 April 2014License Amendment Request LAR-14-02392, Request for NRC Approval of Proposed Changes to Emergency Action Levels. Attachment Ii: Technical Bases Document for the Proposed EALs (Marked-Up Copy)Safe Shutdown
Time of Discovery
Reactor Vessel Water Level
Ultimate heat sink
Offsite Dose Calculation Manual
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Operating Basis Earthquake
Spent Fuel Pool Instrumentation
Earthquake
Fuel cladding
Grace period
RC-14-0032, Virgil C. Summer Unit 1, License Amendment Request LAR-14-02392, Request for NRC Approval of Proposed Changes to Emergency Action Levels. Attachment Ii: Technical Bases Document for the Proposed EALs (Marked-Up Copy)7 April 2014Virgil C. Summer Unit 1, License Amendment Request LAR-14-02392, Request for NRC Approval of Proposed Changes to Emergency Action Levels. Attachment Ii: Technical Bases Document for the Proposed EALs (Marked-Up Copy)Safe Shutdown
Time of Discovery
Reactor Vessel Water Level
Ultimate heat sink
Offsite Dose Calculation Manual
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Operating Basis Earthquake
Spent Fuel Pool Instrumentation
Earthquake
Fuel cladding
Grace period
RC-14-0032, Virgil C. Summer Unit 1, License Amendment Request LAR-14-02392, Request for NRC Approval of Proposed Changes to Emergency Action Levels. EPP-108, Enclosure 1, Revision 01 (Draft E)7 April 2014Virgil C. Summer Unit 1, License Amendment Request LAR-14-02392, Request for NRC Approval of Proposed Changes to Emergency Action Levels. EPP-108, Enclosure 1, Revision 01 (Draft E)Safe Shutdown
High winds
Reactor Vessel Water Level
Packing leak
Ultimate heat sink
Internal Flooding
Operator Manual Action
Earthquake
Fuel cladding
Pressure Boundary Leakage
ML14078A6211 April 2014Enclosure 3 - RASCAL 4.3 Inputs for Site Boundary Dose Projections
ML14072A4546 March 2014Response to NRC Request for Additional Information Site Plan, 2-1, Sheet 1 of 1
ML14072A4636 March 2014Response to NRC Request for Additional Information 2-1, Sheet 3 of 10
ML12056A05212 March 2012Enclosure 6 - List of Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status
ML11354062510 February 2012Amendment to Indemnity Agreement No. B-107 - Amendment No. 6
ML12010A03428 December 2011Onsite Ground/Surface Water Questionnaire, Onsite Radiological Effluent/Remp Monitoring Program
ML11320287015 November 2011V. C. Summer Initial Exam 2011-301 Final SRO Written ExamHot Short
Locked High Radiation Area
Earthquake
ML1122005054 August 2011Crop Tabletop Example FindingsCommercial Grade Dedication
Coatings
Nondestructive Examination
Condition Adverse to Quality
Earthquake
Liquid penetrant
Scaffolding
ML1115204661 June 2011Meeting Summary - V. C. Summer - Attendees
ML1132604283 January 2011NRC 2011 Vogtle
ML11280052920 October 2010NRC 2011 VC Summer
ML1019301939 June 2010Undated Onsite Ground/Surface Water Monitoring Questionnaire 4 for Vogtle
ML10193046025 March 2010List of Historical Leaks and Spills at Us Commercial Nuclear Power Plants
ML10033086329 January 2010NFPA 805 Transition Pilot Plant FAQ 09-0057, Revision 3, New Shutdown StrategySafe Shutdown
Fire Protection Program
ML09335075114 January 2010Temporary Instruction 2515/180, Managing Fatigue
RC-09-0159, VCSNS AST LAR RAI Response Cd Contents23 December 2009VCSNS AST LAR RAI Response Cd Contents
ML09344073310 December 2009Afpb Staff Response to NFPA 805 Transition Pilot Plant FAQ 09-0057, Revision 1Safe Shutdown
Fire Protection Program
ML0934106157 December 2009Evacuation Time Estimate Analysis
ML09302005821 October 2009NFPA 805 Transition Pilot Plant FAQ 09-0057, Revision 1Safe Shutdown
Fire Protection Program
ML09352002021 October 2009NFPA 805 Transition Pilot Plant FAQ 09-0057, Revision 2Safe Shutdown
Fire Protection Program
ML09106020920 April 2009Draft Responses to Request for Additional Information for V. C. Summer Evacuation Time Estimate Analysis
ML0918110599 April 2009NFPA 805 Transition Pilot Plant FAQ 09-0057Safe Shutdown
Fire Protection Program
ML0910602129 April 2009V.C. Summer Evacuation Time Estimate Analysis - Open Items and Confirmatory Items
ML08256081612 September 2008VCSNS GL 96-06 SRI ActionsStroke time
NL-08-0869, Enclosure 11, List of Regulatory Commitments27 June 2008Enclosure 11, List of Regulatory Commitments
ML08119020224 April 2008End of Cycle Public Meeting Attendee List
ML08080003613 March 2008List of Attendees, 03/13/2008 Summary of Meeting with Eight Operating Nuclear Power Plant Licensees to Discuss Emerging Metallurgical Issues Certain Welds in Reactor Coolant System for Pressurized-Water Reactors
ML0806704197 March 2008CDBI FindingsReactor Vessel Water Level
Stroke time
Past operability
Battery sizing