Operating Exam Date 10/30/2023 Written Exam Date 11/16/2023 This schedule assumes that the exit meeting occurs before the administration of the written exam and the receipt of facility post-exam comments.
Form 2.1-1 Description Calc Target Reference / Forms Examination Planning 1
Examination Administration Date Confirmed 3/4/2023 ES-2.1 A.1-5 mnk 2
NRC Examiners and Facility Contact Assigned 4/3/2023 ES-2.1 C.1 mnk 3
Facility contact briefed on exam security 4/3/2023 ES-2.1 D.4 ES-4.1 A.1 ES-4.1 B.2 mnk 3
Facility submits prescreend K/A elimination list 4/3/2023 ES-2.1 C.4.j mnk 4
Reference Material Due for NRC prepared exams 4/3/2023 ES-2.1 F n/a 5
Send Corporate Notification Letter 4/3/2023 ES-2.1 A.5 mnk 5
Contact Facility (210 Day Phone Call) 4/3/2023 ES-2.1 C.4.j mnk Examination Development 6
NRC-Developed Written Examination Outlines sent to facility (exam security established) 4/18/2023 ES-2.1 B.2 ES-4.1 A.1.b ES-4.1 A.2.a mnk 7
Develop Operating Test Outlines (B.6) 6/2/2023 ES-2.1 B.6 1.3-1, 2.3-1, 3.2-1, 3.2-2, 3.3-1, 3.4-1 Received 6/1 seb 8
Outlines Reviewed / Feedback Provided to Facility 6/16/2023 ES-2.3 sent 6/18 seb 9
Exam prepared by NRC Approved by supv and forwarded to Facility Licensee for review 7/22/2023 ES-2.3 n/a 10 Draft Examination due (written, JPMs, and senarios) updated forms 8/16/2023 1.3-1, 2.3-1, 2.3-2, 2.3-4, 3.4-1 seb 10 Reference Material Due for licensee prepaired exam 8/16/2023 seb Examination Preparation 11 Preliminary waiver/excusal requests due 8/31/2023 ES-2.2 E.1 none requested 12 Written and operating test review completed 9/10/2023 ES-2.3 mnk 12 NRC supervisor authorization to proceed with facility review 9/10/2023 ES-2.3 D mnk 13 Exam review results discussed with NRC and facility 9/10/2023 ES-2.1 B.14 mnk 14 Prep week 9/25/2023 ES-2.1 I 9/11-9/15 15 Preliminary License Applications Due and waiver/excusal request 9/30/2023 ES-2.2 C.1 mnk 16 Final License Applications Due and waiver/excusals 10/16/2023 ES-2.2 C and E 2.2-1 mnk 17 Exam approved by NRC supervisor 10/23/2023 ES-2.1 C.9 mnk 18 NRC supervisor Request facility feedback on exam 10/23/2023 ES-2.1 C.10 mnk 19 Final Applications Approved (10% Audit to confirm qualifications) 10/23/2023 ES-2.2 G mnk 19 Exam approval letter 10/23/2023 2.3-1 mnk 19 Waiver/excusal letters sent out 10/23/2023 none 20 Review exam admin guidelines with facility 10/23/2023 ES-2.1 D.14 mnk 21 Distribute approved scenarios and JPMs to examiners 10/23/2023 ES-2.1 D.12 mnk Examination Administration Administer Operating Exam 10/30/2023 mnk Administer Written Exam 11/16/2023 seb Conduct Exit Meeeting 11/3/2023 Post-Examination Activities Actual date post exam comments received:
Receive Facility Post-Examination Comments 12/6/2023 ES-4.4 B.7 11/20/2023 Notify applicants of exam results 12/20/2023 ES-5.1 D mnk Issue Exam Report 2/3/2024 OLMC 510 ADAMS record submitted 3/19/2024 OLMC 520 Contact NRR for concurrence if written and operating exams will be administered more than 30 days 12/19/2023 1 of 1 ML23354A210
Form 5.1-1 Postexamination Check Sheet Postexamination Check Sheet Facility: Summer Dates of Examination: 11/16/2023 Activity Description Date Complete
- 1. *Received postexamination package from facility licensee and verified complete. (ES-4.4) 11/20/23
- 2. *Reviewed and incorporated any necessary facility and applicant written examination comments. NRC grading of written examination completed. (ES-4.4) 11/21/23
- 3. *Reviewed and incorporated any necessary facility and applicant operating test comments. NRC grading of operating test completed.
(ES-3.6) 11/21/23
- 4. *Completed NRC chief examiner review of operating test and written examination grading. (ES-3.6 and ES-4.4) 11/28/23
- 5. Completed licensing official review.
12/14/2023
- 6. Mailed licenses, preliminary results, and pass letters.
12/18/2023
- 7. Notified facility licensee of results.
12/14/2023
- 8. Issued the examination report (refer to Operator Licensing Manual Chapter (OLMC) 510, Operator Licensing Examination Reports).
12/19/2023
- 9. Returned reference material after final resolution of any informal NRC staff reviews, hearing demands, or both.
N/A
- 10. Performed examination recordkeeping activities (refer to OLMC 520, Operator Licensing Examination Records and Documentation, and Management Directive 3.53, NRC Records and Document Management Program).
12/19/2023
- Activity may not be applicable for a retake examination. If this activity does not apply, place an N/A in the Date Complete column.