Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
RS-23-114, Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds1 November 2023Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel WeldsHydrostatic
VT-2
Finite Element Analysis
Flow Accelerated Corrosion
Stress corrosion cracking
License Renewal
Thermal fatigue
RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles11 October 2023Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded NozzlesFinite Element Analysis
Aging Management
Flow Accelerated Corrosion
Stress corrosion cracking
License Renewal
Subsequent License Renewal
Power Uprate
RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections10 October 2023Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius SectionsFinite Element Analysis
Aging Management
Flow Accelerated Corrosion
Stress corrosion cracking
License Renewal
Subsequent License Renewal
ML23255A10411 August 2023Slides - Constellation - Pre-Application EP 9/18/2023 Draft CEG Presubmittal SG Performance Monitoring Plan Meeting HandoutSubsequent License Renewal
RS-23-056, Response to Request for Additional Information to Braidwood Station, Unit 1, and Byron Station, Unit 1, for Steam Generator License Renewal Response to Commitment 1020 April 2023Response to Request for Additional Information to Braidwood Station, Unit 1, and Byron Station, Unit 1, for Steam Generator License Renewal Response to Commitment 10Non-Destructive Examination
Stress corrosion cracking
Code Reconciliation
License Renewal
Power Uprate
Affidavit
RS-23-040, Constellation Energy Generation, LLC, Supplemental Information - Proposed Alternatives Related to the Steam Generators21 February 2023Constellation Energy Generation, LLC, Supplemental Information - Proposed Alternatives Related to the Steam Generators
ML22307A24610 November 2022Proposed Alternative to the Requirements of the American Society of Mechanical Engineers Boiler & Pressure Vessel Code (EPIDs L-2021-LLR-0035 and L-2021-LLR-0036)Probabilistic Risk Assessment
Incorporated by reference
RS-22-110, Supplemental Information - Proposed Alternatives Related to the Steam Generators and Request.20 September 2022Supplemental Information - Proposed Alternatives Related to the Steam Generators and Request.Non-Destructive Examination
Scaffolding
RS-22-071, License Renewal Response to Commitment 10 - Evaluation of Possible PWSCC Crack Initiation and Propagation in the Steam Generator Channel Head Assembly and Tube-to-Tubesheet Welds7 June 2022License Renewal Response to Commitment 10 - Evaluation of Possible PWSCC Crack Initiation and Propagation in the Steam Generator Channel Head Assembly and Tube-to-Tubesheet WeldsNon-Destructive Examination
Stress corrosion cracking
Code Reconciliation
License Renewal
Power Uprate
ML22105A07215 April 2022NRR E-mail Capture - Braidwood/Byron Verbal Authorization for Proposed Alternative I4R-15/I4R-21
RS-22-050, Supplemental Information - Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds8 April 2022Supplemental Information - Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds
ML21008A39717 December 2020Byron/Braidwood Stations - Revision 18 to Updated Final Safety Analysis Report, Appendix F, Updated Final Safety Analysis Report Supplement (License Renewal)Boric Acid
Ultimate heat sink
Non-Destructive Examination
Fire Barrier
Hydrostatic
Coatings
High Energy Line Break
Aging Management
Flow Accelerated Corrosion
Stress corrosion cracking
Eddy Current Testing
Moisture barrier
License Renewal
Liquid penetrant
Through-Wall Leakage
Overspeed trip
Thermography
Thermal fatigue
Water hammer
ML17047A03824 February 2017Request I4R-11 Relief from the Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code)Boric Acid
Nondestructive Examination
Incorporated by reference
Finite Element Analysis
Stress corrosion cracking
Liquid penetrant
RS-16-224, Relief Request for Alternative Requirements for the Repair and Examination of Reactor Vessel Head Penetrations for the Fourth Inservice Inspection Interval8 November 2016Relief Request for Alternative Requirements for the Repair and Examination of Reactor Vessel Head Penetrations for the Fourth Inservice Inspection IntervalNondestructive Examination
Finite Element Analysis
Stress corrosion cracking
License Renewal
Liquid penetrant
Exclusive Use
Affidavit
RS-16-142, Proposed Alternative for Examination of ASME Section XI, Examination Category B-G-1, Item Number B6.40, Threads in Flange31 October 2016Proposed Alternative for Examination of ASME Section XI, Examination Category B-G-1, Item Number B6.40, Threads in FlangeFinite Element Analysis
Stress corrosion cracking
Weak link
ML16300A03626 October 2016Fourth Ten-Year Interval Inservice Inspection ProgramSafe Shutdown
Boric Acid
Weld Overlay
Hydrostatic
Coatings
Nondestructive Examination
VT-2
Incorporated by reference
High Energy Line Break
Aging Management
Flow Accelerated Corrosion
Stress corrosion cracking
Moisture barrier
License Renewal
Earthquake
Through-Wall Leak
Through-Wall Leakage
Dissimilar Metal Weld
Thermography
Thermal fatigue
ML16109A33727 April 2016Relief from the Requirements of the ASME Code (CAC Nos. MF6715, MF6716, MF6717, and MF6718)Boric Acid
Nondestructive Examination
Incorporated by reference
Finite Element Analysis
Stress corrosion cracking
License Renewal
ML15350A04131 December 2015NUREG-2190 V2 - Safety Evaluation Report, Related to the License Renewal of Byron Station, Units 1 and 2, and Braidwood Station, Units 1 and 2.Boric Acid
Ultimate heat sink
Fire Barrier
Anticipated operational occurrence
Safe Shutdown Earthquake
Weld Overlay
Coatings
Operating Basis Earthquake
Nondestructive Examination
VT-2
Incorporated by reference
Finite Element Analysis
B.5.b
Aging Management
Pressure and Temperature Limits Report
Flow Accelerated Corrosion
Stress corrosion cracking
Integrated leak rate test
Eddy Current Testing
Moisture barrier
License Renewal
Earthquake
Control of Heavy Loads
Liquid penetrant
Flow Induced Vibration
Power Uprate
Measurement Uncertainty Recapture
Thermal fatigue
ML15259A04911 September 2015Units 1 and 2 - Head Penetrations with Nozzles Having Pressure-Retaining Partial-Penetration J-Groove WeldsNondestructive Examination
Finite Element Analysis
Stress corrosion cracking
License Renewal
Liquid penetrant
Affidavit
RS-15-236, Braidwood Station, Units 1 and 2 & Byron Station, Units 1 and 2 - Head Penetrations with Nozzles Having Pressure-Retaining Partial-Penetration J-Groove Welds11 September 2015Braidwood Station, Units 1 and 2 & Byron Station, Units 1 and 2 - Head Penetrations with Nozzles Having Pressure-Retaining Partial-Penetration J-Groove WeldsNondestructive Examination
Finite Element Analysis
Stress corrosion cracking
License Renewal
Liquid penetrant
Affidavit
RS-15-035, Update to Report the Completion of Commitment 47, Related to the Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, License Renewal Application23 January 2015Update to Report the Completion of Commitment 47, Related to the Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, License Renewal ApplicationHydrostatic
VT-2
Aging Management
License Renewal
RS-14-084, Responses to NRC Requests for Additional Information, Set 10, Dated February 26, 2014 Related to the License Renewal Application28 March 2014Responses to NRC Requests for Additional Information, Set 10, Dated February 26, 2014 Related to the License Renewal ApplicationLoop seal
Safe Shutdown Earthquake
VT-2
Aging Management
Flow Accelerated Corrosion
Stress corrosion cracking
License Renewal
Earthquake
Flow Induced Vibration
Affidavit
RS-13-285, Bryon, Units 1 and 2, Updated Responses to Two NRC Requests for Additional Information from Set 1, Dated October 7, 2013, Related to the License Renewal Application19 December 2013Bryon, Units 1 and 2, Updated Responses to Two NRC Requests for Additional Information from Set 1, Dated October 7, 2013, Related to the License Renewal ApplicationBoric Acid
Hydrostatic
VT-2
Aging Management
Intergranular Stress Corrosion Cracking
Stress corrosion cracking
License Renewal
ML07068009929 March 2007Requests for Relief, Evaluation of Proposed Alternatives for Inservice Inspection Examination Requirements for Third 10-Year Interval Inservice Inspection Program Plan, MD3661, MD3662, and MD3663Nondestructive Examination
Incorporated by reference
Dissimilar Metal Weld
ML05045057625 February 20052/25/05, Byron - Request for Relief I2R-50 from the American Society of Mechanical Engineers Boiler and Pressure Vessel CodeIncorporated by reference
Dissimilar Metal Weld
ML20198B9279 December 1998Forwards First 10-yr ISI Program Relief Requests NR-26, Limited Volumetric Exam of RCS Weld Due to Whip Restraint Obstruction & NR-27 & NR-28,volumetric Exam of RPV Circumferential Shell WeldHydrostatic
VT-2
ML20238F65528 August 1998SE Authorizing Licensee Request for Relief NR-20,Rev 1 & NR-25,Rev 0 Re Relief from Examination Requirement of Applicable ASME BPV Code,Section XI for First ISI Interval ExamsVT-2
Incorporated by reference
ML20198J56515 October 1997Forwards Proprietery Rev 1 to WCAP-12045 & non-proprietary WCAP-12046,which Both Demonstrate That Indication Detected in Nozzle Shell-to-Intermediate Shell Weld Is Acceptable to Continue Svc.Proprietary Rept Withheld,Per 10CFR2.790(a)4Affidavit
ML20132E83816 December 1996Forwards Response to Request for Addl Info Re Various Aspects of Second 10 Yr ISI ProgramVT-2
ML20115J94515 July 1996Provides Info Re Ultrasonic Exam of Rv Welds for Plant.Info Re Plant First Ten Yr Interval ISI Program Relief Request NR-20 EnclVT-2
ML20078F17820 January 1995Forwards Results of Last ASME Section XI ISI of Byron Unit 1 RHR HX Nozzle to Vessel Welds as Requested in 950116 Telcon. Insps Conducted During Byron Unit 1 Cycle 5 Refuel Outage Which Began 930205 & Concluded 930410
ML20078F18620 January 1995Refuel Outage B1R05 RHR HX Nozzles Ultrasonic Indication SummaryStress corrosion cracking
ML20101B31327 May 1992Submits Results of RHR Heat Exchanger Inservice Insps. Results of Analysis Confirm That RHR Heat Exchangers Acceptable,Without Repair,For Continued SvcStress corrosion cracking
Liquid penetrant
ML0311405497 November 1991Withdrawn NRC Generic Letter 1991-018: Information to Licensees Regarding Two NRC Inspection Manual Sections on Resolution of Degraded and Nonconforming Conditions and on OperabilitySafe Shutdown
Unanalyzed Condition
Fitness for Duty
Probabilistic Risk Assessment
Condition Adverse to Quality
Missed surveillance
Operability Determination
Exemption Request
Pressure Boundary Leakage
Backfit
Operational leakage