ML23346A122 | Sequoyah | 12 December 2023 | Annual Non-Radiological Environmental Operating Report - 2023 | |
ML23285A154 | Hermes | 12 October 2023 | Official Exhibit - NRC-005B-MA-CM01 - Kairos Power LLC, Construction Permit Application - Preliminary Safety Analysis Report (Psar), Revision 3 (May 31, 2023) | Safe Shutdown High winds Shutdown Margin High Radiation Area Ultimate heat sink Mission time Offsite Dose Calculation Manual Fire Barrier Anticipated operational occurrence Tornado Missile Safe Shutdown Earthquake Internal Flooding Hydrostatic Coatings Nondestructive Examination Temporary Modification Cyber Security Emergency Lighting Condition Adverse to Quality Tornado Generated Missile Design basis earthquake Earthquake Minimum staff Fire Protection Program Tritium Power change Flow Induced Vibration Tristructural Isotropic |
ML23285A161 | Hermes | 12 October 2023 | Official Exhibit - NRC-007-MA-CM01 - Safety Evaluation Related to the Kairos Power LLC Construction Permit Application for the Hermes Test Reactor (June 13, 2023) | Safe Shutdown High winds Shutdown Margin High Radiation Area Ultimate heat sink Non-Destructive Examination Fire Barrier Anticipated operational occurrence Tornado Missile Internal Flooding Probabilistic Risk Assessment Coatings Design basis earthquake Earthquake Fire Protection Program Power change Coast down Tristructural Isotropic |
ML23237B484 | Triso-X | 25 August 2023 | Response to Request for Additional Information (Set 2) for the TRISO-X License Application | |
ML23200A020 | Sequoyah | 13 July 2023 | Discharge Monitoring Report (Dmr), June 2023 | |
ML23158A268 | Hermes | 13 June 2023 | Safety Evaluation for Hermes Construction Permit Application | Safe Shutdown High winds Shutdown Margin High Radiation Area Ultimate heat sink Non-Destructive Examination Fire Barrier Anticipated operational occurrence Tornado Missile Internal Flooding Probabilistic Risk Assessment Coatings Design basis earthquake Earthquake Fire Protection Program Power change Coast down Tristructural Isotropic |
ML23151A745 | Hermes | 31 May 2023 | Enclosure 1 - Preliminary Safety Analysis Report | Safe Shutdown High winds Shutdown Margin High Radiation Area Ultimate heat sink Mission time Offsite Dose Calculation Manual Fire Barrier Anticipated operational occurrence Tornado Missile Safe Shutdown Earthquake Internal Flooding Hydrostatic Coatings Nondestructive Examination Temporary Modification Cyber Security Emergency Lighting Condition Adverse to Quality Tornado Generated Missile Design basis earthquake Earthquake Minimum staff Fire Protection Program Tritium Power change Flow Induced Vibration Tristructural Isotropic |
ML23108A119 | Hermes | 18 April 2023 | Hermes CP Approved Safety Evaluation | Safe Shutdown High winds Shutdown Margin High Radiation Area Ultimate heat sink Non-Destructive Examination Fire Barrier Anticipated operational occurrence Tornado Missile Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Coatings Design basis earthquake Earthquake Fire Protection Program Power change Coast down Tristructural Isotropic |
ML23062A505 | Triso-X | 3 March 2023 | TRISO-X Fuel Fabrication Facility Scoping Meetings and Audit Summary - January 2023 | Open House |
ML23055A674 | Hermes | 24 February 2023 | HER-PSAR-001, Revision 2, Hermes Non?Power Reactor Preliminary Safety Analysis Report | Safe Shutdown High winds Shutdown Margin High Radiation Area Ultimate heat sink Mission time Offsite Dose Calculation Manual Fire Barrier Anticipated operational occurrence Tornado Missile Safe Shutdown Earthquake Internal Flooding Hydrostatic Coatings Nondestructive Examination Temporary Modification Cyber Security Emergency Lighting Condition Adverse to Quality Tornado Generated Missile Design basis earthquake Earthquake Minimum staff Fire Protection Program Tritium Power change Flow Induced Vibration Tristructural Isotropic |
ML23048A065 | Triso-X | 16 February 2023 | 01/23-25/2023 Trip Report for the TRISO-X Scoping Outreach from the Fuel Fabrication Facility Branch | |
ML23017A157 | Hermes | 10 January 2023 | Preliminary Hermes CP SE Chapter 12, Conduct of Operations for ACRS | |
ML22347A081 | Sequoyah | 13 December 2022 | Annual Non-Radiological Environmental Operating Report 2022 | |
ML22336A251 | Erwin | 2 December 2022 | Erwin Citizen Awareness Network, Inc.'S Combined Reply in Support of Petition for Leave to Intervene | |
ML22326A244 | | 21 November 2022 | FOIA-2023-000005 - Resp 1 - Final, Agency Records Subject to the Request Are Enclosed | Unanalyzed Condition Time of Discovery Fitness for Duty Shutdown Margin Safe Shutdown Earthquake Enforcement Discretion Operating Basis Earthquake Earthquake Moisture Density Gauge Downpower |
ML22272A595 | Hermes | 29 September 2022 | Enclosure 1: HER-PSAR-001, Preliminary Safety Analysis Report, Rev. 1 | Safe Shutdown High winds Shutdown Margin High Radiation Area Ultimate heat sink Mission time Offsite Dose Calculation Manual Fire Barrier Anticipated operational occurrence Tornado Missile Safe Shutdown Earthquake Internal Flooding Hydrostatic Coatings Nondestructive Examination Temporary Modification Cyber Security Emergency Lighting Condition Adverse to Quality Tornado Generated Missile Design basis earthquake Earthquake Minimum staff Fire Protection Program Tritium Power change Flow Induced Vibration Tristructural Isotropic |
ML22107A006 | Hermes | 17 April 2022 | Oak Ridge Reservation Annual Site Environmental Report 2017: Reference for Kairos Hermes CP Application | High winds Grab sample Cyber Security |
ENS 55741 | Watts Bar | 16 February 2022 16:59:00 | Loss of Offsite Communication Capability | Siren |
ENS 55742 | Sequoyah | 16 February 2022 16:28:00 | Loss of Offsite Communication Capability | Siren |
CNL-22-021, Plants, Units 1 and 2 - Withdrawal of One-Time Exemption from 10 CFR 50, Appendix E, Section IV.F.2.d | Sequoyah | 27 January 2022 | Plants, Units 1 and 2 - Withdrawal of One-Time Exemption from 10 CFR 50, Appendix E, Section IV.F.2.d | Exemption Request |
CNL-21-099, Plants, Units 1 and 2 - One-Time Exemption from 10 CFR 50, Appendix E, Section IV.F.2.d | Sequoyah | 17 December 2021 | Plants, Units 1 and 2 - One-Time Exemption from 10 CFR 50, Appendix E, Section IV.F.2.d | Exemption Request Coronavirus COVID-19 |
ML21348A337 | Sequoyah | 14 December 2021 | Annual Non-Radiological Environmental Operating Report - 2021 | |
ML21291A009 | Browns Ferry Watts Bar Sequoyah | 3 November 2021 | Tennessee Valley Authority Fleet - Summary of October 13, 2021, Teleconference with Tennessee Valley Authority to Discuss Planned License Amendment Requests Related to the Emergency Action Level Scheme | Operating Basis Earthquake Earthquake |
ML21301A041 | | 25 October 2021 | Tennessee Regulations 0400-20-13 | Cyber Security |
ML21301A025 | | 25 October 2021 | Tennessee Regulations 0400-20-05 | High Radiation Area Deep Dose Equivalent Chernobyl Brachytherapy Stolen |
ML21301A015 | | 25 October 2021 | Tennessee Regulations 0400-20-04 | |
A000194, Oak Ridge Reservation Annual Site Environmental Report 2020: Reference for Kairos Hermes CP Application | Hermes | 30 September 2021 | Oak Ridge Reservation Annual Site Environmental Report 2020: Reference for Kairos Hermes CP Application | High winds Grab sample Coatings Cyber Security Earthquake Pandemic Coronavirus COVID-19 |
ML21355A175 | Sequoyah | 18 December 2020 | FEMA After Action Report - Sequoyah Nuclear Plant | Pandemic |
ML20343A254 | Sequoyah | 3 December 2020 | Annual Non-Radiological Environmental Operating Report - 2020 | |
ENS 54918 | Sequoyah | 28 September 2020 15:43:00 | Offsite Notification - Oil Spill | |
ML19218A345 | Clinch River | 23 December 2019 | Issuance of the Uncontested Hearing Decision and Summary Record of Decision for the Early Site Permit Application Review for Clinch River Nuclear Site - Letter | |
ML19189A228 | Clinch River | 19 December 2019 | Issuance of Early Site Permit for the Clinch River Nuclear Site Early Site Permit-006 to the Tennessee Valley Authority - Letter | |
ML19351D663 | Clinch River | 17 December 2019 | Commission Memorandum and Order (CLI-19-10) | Probabilistic Risk Assessment Incorporated by reference Exemption Request Environmental Justice |
ML19346G001 | Sequoyah | 12 December 2019 | Annual Non-Radiological Environmental Operating Report - 2019 | |
ML19296B786 | Sequoyah | 31 October 2019 | NUREG/CR-7245 State-of-the-Art Reactor Consequence Analyses (Soarca) Project Sequoyah Integrated Deterministic and Uncertainty Analyses | Loop seal Probabilistic Risk Assessment Finite Element Analysis FLEX Design basis earthquake Severe Accident Management Guideline Earthquake Hardened vent Fuel cladding Coast down |
ML19232A230 | Clinch River | 20 August 2019 | Memorandum from the Secretary Providing Hearing Transcript | Exemption Request |
ML19231A373 | Clinch River | 19 August 2019 | Order (Setting Deadline for Proposed Transcript Corrections) | Probabilistic Risk Assessment Exemption Request |
ML19227A244 | Clinch River | 7 August 2019 | Official Exhibit - NRC-017-MA-CM01 - Staff Presentation Slides - Safety Panel (Aug. 2019) | Probabilistic Risk Assessment Exemption Request |
ML19227A202 | Clinch River | 7 August 2019 | Official Exhibit - NRC-010-MA-CM01 - Clinch River Nuclear Site Early Site Permit Application, Rev. 1 - Part 5, Emergency Planning (Dec. 15, 2017) | Fitness for Duty Health Physics Network High winds Emergency Lighting Severe Accident Management Guideline Earthquake Minimum staff Grace period |
ML19219B319 | Clinch River | 7 August 2019 | NRC-017 - Staff Presentation Slides - Safety Panel (Aug. 2019) | Probabilistic Risk Assessment Exemption Request |
ML19219A048 | Clinch River | 7 August 2019 | NRC-005 - NRC Staff Responses to Commission Prehearing Questions (June 26, 2019) | Probabilistic Risk Assessment License Renewal Exemption Request Earthquake |
ML19219A058 | Clinch River | 7 August 2019 | NRC-010 - Clinch River Nuclear Site Early Site Permit Application, Rev. 1 - Part 5, Emergency Planning (Dec. 15, 2017) | Fitness for Duty Health Physics Network High winds Emergency Lighting Severe Accident Management Guideline Earthquake Minimum staff Grace period |
ML19227A251 | Clinch River | 7 August 2019 | Official Exhibit - NRC-005-MA-CM01 - NRC Staff Responses to Commission Prehearing Questions (June 26, 2019) | Probabilistic Risk Assessment License Renewal Exemption Request Earthquake |
ML19207A235 | Clinch River | 26 July 2019 | NRC Staff Responses to Pre-hearing Questions | Probabilistic Risk Assessment License Renewal Exemption Request Earthquake |
ML19073A109 | Clinch River | 30 April 2019 | NUREG-2226, Vol. 2, Environmental Impact Statement for an Early Site Permit (ESP) at the Clinch River Nuclear Site, Final Report, Appendices A-M. | Safe Shutdown Ultimate heat sink Offsite Dose Calculation Manual Probabilistic Risk Assessment Coatings Met Tower Cyber Security Zebra Mussel Fukushima Dai-Ichi Frazil ice License Renewal Exemption Request Earthquake Chernobyl Fuel cladding Environmental Justice Siren Depleted uranium |
ML19219A768 | Clinch River | 30 April 2019 | NRC-015B - NUREG-2226, Environmental Impact Statement for an Early Site Permit (ESP) at the Clinch River Nuclear Site; Final Report, Volume 2, Appendices (Apr. 2019) | Safe Shutdown Ultimate heat sink Offsite Dose Calculation Manual Probabilistic Risk Assessment Coatings Met Tower Cyber Security Zebra Mussel Fukushima Dai-Ichi Frazil ice License Renewal Exemption Request Earthquake Chernobyl Fuel cladding Environmental Justice Siren Depleted uranium |
ML19227A215 | Clinch River | 30 April 2019 | Official Exhibit - NRC-015B-MA-CM01 - NUREG-2226, Environmental Impact Statement for an Early Site Permit (ESP) at the Clinch River Nuclear Site; Final Report, Volume 2, Appendices (Apr. 2019) | Safe Shutdown Ultimate heat sink Offsite Dose Calculation Manual Probabilistic Risk Assessment Coatings Met Tower Cyber Security Zebra Mussel Fukushima Dai-Ichi Frazil ice License Renewal Exemption Request Earthquake Chernobyl Fuel cladding Environmental Justice Siren Depleted uranium |
ML19045A621 | Clinch River | 3 April 2019 | Reader'S Guide for the Final Environmental Impact Statement for an Early Site Permit at the Clinch River Nuclear Site | Ultimate heat sink Environmental Justice |
ML19079A244 | Sequoyah | 5 February 2019 | FEMA - After Action Report for Sequoyah Nuclear Power Plant Radiological Emergency Preparedness Exercise, October 3, 2018 | |
ML19030A352 | Clinch River | 18 January 2019 | Part 02 Ssar (Rev. 2) - Part 02 - Ssar - Chapter 13 - Conduct of Operations | Probabilistic Risk Assessment Incorporated by reference Large early release frequency |