Text
United States Nuclear Regulatory Commission Official Hearing Exhibit In the Matter of: TENNESSEE VALLEY AUTHORITY (Clinch River Nuclear Site Early Site Permit Application)
Commission Mandatory Hearing Docket #: 05200047 Exhibit #: NRC-017-MA-CM01 Identified: 8/14/2019 Admitted: 8/14/2019 Withdrawn:
Rejected: Stricken:
Other:
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of TENNESSEE VALLEY AUTHORITY Docket No. 52-047-ESP (Clinch River Nuclear Site Early Site Permit Application)
Hearing Exhibit Exhibit Number: NRC-017 Exhibit
Title:
Staff Presentation Slides - Safety Panel (Aug. 2019).
Early Site Permit Application (ESPA) Review Clinch River Nuclear Site Safety Panel August 14, 2019
Panelists
- Allen Fetter - Senior Project Manager
- Mallecia Sutton - Senior Project Manager
- Bruce Musico - Senior Emergency Preparedness Specialist
- Michelle Hart - Senior Reactor Engineer
- Michael Scott - Division Director 2
Clinch River PPE
- The safety review accounts for the plants that might be located at the site
- Single unit does not exceed 800 MWt (reactor core)
- Site total does not exceed 2,420 MWt (800 MWe) 3
Clinch River PPE (cont.)
BWXT mPower SMR, 530 MWt (180 MWe)
NuScale SMR, 160 MWt (50 MWe)
Holtec SMR-160, 525 MWt (160 MWe)
Westinghouse SMR, 800 MWt (225 MWe) 4
- A combined license (COL) or construction permit (CP) application that incorporates the ESP by reference must:
Identify the chosen SMR technology for the Clinch River Nuclear Site Address COL action items and permit conditions Provide other information necessary to support COL or CP issuance 5
Staff Safety Review
- 5 audits and 1 inspection
- 12 requests for additional information
- 50 questions
- Final Safety Evaluation Report 41 COL Action Items 7 Permit Conditions 6
Clinch River ESPA Safety Review (cont.)
Specific Topics Covered Seismology Site Hazards Evaluation Geology Radiological Effluents Hydrology Radiological Dose Consequences Meteorology Emergency Preparedness Geography Security Plan Feasibility Demography (inc. Quality Assurance population distribution) 7
Permit Conditions
- Assessment of potential facility hazards Permit Conditions 1 & 2
- Site investigation and improvement activities associated with excavation Permit Conditions 3 & 4
- Emergency Planning Permit Conditions 5 & 6
Staff Conclusions
- The ESPA satisfies the applicable standards in 10 CFR Parts 50, 52, and 100
- ESP issuance will not be inimical to the common defense and security or to the health and safety of the public 9
Staff Conclusions (cont.)
Two or more SMRs can be safely sited on the Clinch River Nuclear Site if they:
(1) have design characteristics falling within the design parameters for the site, (2) have site parameters falling within the site characteristics for the site, and (3) meet the ESP terms and conditions 10
Overview of TVAs Unique Approach to EPZ Sizing
- Risk-informed, dose-based, and consequence-oriented methodology for plume exposure pathway (PEP) emergency planning zone (EPZ) sizing
- Associated exemption requests 11
Emergency Planning (EP)
TVA ESPA The ESPA requested review of 3 key areas, which consist of:
- 2 Major Features (onsite) Emergency Plans (ESPA Part 5)
- 25 exemption requests (ESPA Part 6)
- PEP EPZ sizing methodology 12
2 Major Features Emergency Plans (Onsite)
- ESPA Part 5A reflects a Site Boundary PEP EPZ
- 10 CFR 50.33(g) & 50.47(c)
Requests to exempt both emergency plans from the 10-mile radius requirement for the PEP EPZ
- 10 CFR 50.47 & Appendix E to 10 CFR Part 50 Site boundary EPZ only: Requests for exemption from various offsite emergency planning requirements (e.g., State/local emergency plans, offsite exercises) 14
Overview
- EPZ sizing methodology Technical criteria and description Dose criteria Review basis and finding
- Permit Condition 5 Plant parameters
Review of EPZ Sizing Methodology
- Novel and unique review Staff looked at technical basis for PEP EPZ size in current regulations to support review Concept of allowing site-specific EPZ sizing for SMRs supported by previous Commission decisions 16
TVA EPZ Sizing Methodology Technical Criteria
- PEP EPZ should encompass areas where projected dose from design basis accidents (DBAs) could exceed Environmental Protection Agency (EPA) early phase protective action guides (PAGs) where consequences of less severe core melt accidents could exceed the EPA early phase PAGs 17
TVA EPZ Sizing Methodology Technical Criteria (cont.)
- PEP EPZ should be of sufficient size to provide for substantial reduction in early health effects in the event of more severe core melt accidents 18
TVA EPZ Sizing Methodology Steps
- Accident scenario selection Use bounding DBA Use site- and design-specific probabilistic risk assessment (PRA) to categorize severe accident scenarios 19
TVA EPZ Sizing Methodology Steps (cont.)
- Determine source term releases to atmosphere
- Calculate dose consequences at distance from plant
- Determine PEP EPZ size that meets the dose criteria 20
TVA EPZ Sizing Methodology Dose Criteria
- Dose to individual from exposure to the airborne plume and groundshine
- More severe accidents Conditional probability to exceed 200 rem whole body from 24-hr exposure is less than 10-3 per reactor year outside PEP EPZ 21
- TVAs methodology is consistent with NUREG-0396 Considers a range of accidents Performs accident consequence analyses Determines an area outside of which early protective actions are not likely to be necessary TVAs technical criteria essentially the same as criteria used in NUREG-0396 22
Conclusions on PEP EPZ Size Methodology
- The methodology maintains the same level of radiation protection that the 10-mi PEP EPZ provides for large light-water reactors
- The methodology is reasonable and consistent with the analyses that form the basis for the current 10-mile PEP EPZ requirement 23
Permit Condition 5
- COL or CP applicant must demonstrate that the design-specific accident release source term used in the EPZ sizing analysis is bounded by the source term in Permit Condition 5 24
Permit Condition 5 (cont.)
- The ESP accident release source term is not design-specific Bounding 4-day accident release source term that meets EPZ size criteria at the site boundary Same idea as DBA source term to envelop an unknown design COL/CP applicant must meet Permit Condition 5 to use ESP exemptions, unless a variance is approved 25
Exemption Review 10 CFR 50.12
- Authorized by law
- Will not present an undue risk to the public health and safety
- Consistent with the common defense and security
- Special circumstances are present 26
Exemption Review (cont.)
- The staff determined that the requested exemptions are:
authorized by law do not present an undue risk to the public health and safety are consistent with the common defense and security 27
Exemption Review (cont.)
- 10 CFR 50.12 identifies 6 possible special circumstances.
- For this review, the applicable special circumstance is:
Application of the regulation in the particular circumstances is not necessary to achieve the underlying purpose of the rule 28
Exemptions Review (cont.)
The staff finds that:
- The establishment of a PEP EPZ in a COLA or CPA using criteria proposed by the ESP applicant will maintain the same level of protection (i.e., dose savings) surrounding the Clinch River Nuclear Site, as that which currently exists at the 10-mi PEP EPZ for large light-water reactors
- TVAs approach will meet the same underlying purpose as current regulations 29
Federal Emergency Management Agency (FEMA) Consultation
- NRC performed its review in consultation with FEMA, in accordance with 10 CFR 52.17 and 52.18, pursuant to the FEMA-NRC Memorandum of Understanding (MOU) (December 7, 2015, ML15344A371) 30
FEMA Consultation (cont.)
FEMA review was limited because:
- The ESPA did not include offsite emergency plans But the ESPA did include an ETE for the 2-mile PEP EPZ
- The major features plans only addressed limited onsite EP features 31
FEMA Consultation (cont.)
FEMAs January 24, 2018, letter (ML18031B055) stated that:
- FEMA did not identify physical characteristics of the proposed site that could pose a significant impediment to the development of emergency plans, including evacuation from the 2-mi PEP EPZ 32
FEMA Consultation (cont.)
- The boundary established for the proposed 2-mi PEP EPZ was established relative to local emergency response needs and capabilities, as they are affected by such conditions as demography, topography, land characteristics, access routes, and jurisdictional boundaries 33
FEMA Consultation (cont.)
- At this time, FEMAs findings do not endorse or determine the adequacy of a proposed 2-mi PEP EPZ for the site if proposed
- FEMA looks forward to continued consultative support during any future application review 34
Recent FEMA Correspondence
- In response to an NRC staff suggestion, FEMA provided a letter dated July 8, 2019, that shared its views on the ESP application
- The letter expressed concerns regarding EPZ sizing for SMRs that could be sited at the Clinch River Nuclear Site 35
NRC Staff Response
- NRC regulations are risk-informed, not focused on worst conceivable case
- Dose outcome (hence input to EPZ sizing) for human-induced events similar to outcomes of other events
- EPZ sizing will suit the protection to the hazard
- Staffs approach to Clinch River EPZ sizing review is consistent with the approach taken when the EPZ regulations were developed 36
NRC Staff Response (cont.)
- Staff seeks input on EP, but Commission decides what requirements are
- States, local authorities, and licensees free to arrange additional capabilities
- Massive/rapid all-hazards response not needed if site boundary EPZ is justified
- Similar to other very low hazard facilities such as non-power reactors 37
Outreach Staff has reached out to, and sought views of, numerous stakeholders on EPZ sizing for SMRs
- Conference of Radiation Control Program Directors
- National Emergency Management Association
- Federal Radiological Preparedness Coordinating Committee 38
- Upon issuance of the ESP, the applicant acquires approval, with conditions, on:
The PEP EPZ sizing methodology The 2 major features emergency plans (site boundary/2-mile PEP EPZ)
The 25 requested exemptions 39
EP in COLA or CPA A COLA or CPA, which incorporates the ESP by reference, must:
- Demonstrate that the EPZ sizing methodology supports either the site boundary or 2-mile PEP EPZ and the use of the exemptions COLA/CPA analysis will be based on the chosen SMR technology Address 16 COL Action Items and 2 Permit Conditions related to EP
- Provide all other required EP information 40
EP Review Conclusions The staff concludes that:
- The PEP EPZ sizing methodology is acceptable for determining the appropriate size of the PEP EPZ for the Clinch River Nuclear Site because it is consistent with the analyses that form the technical basis for the current 10-mile PEP EPZ requirement 41
EP Review Conclusions (cont.)
- The 2 major features emergency plans meet applicable regulatory requirements
- The exemption requests are acceptable because they are authorized by law, will not present an undue risk to the public health and safety, are consistent with the common defense and security, and special circumstances are present 42