Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
NUREG-0518, Summary of ACRS 316th Meeting on 860807-09 in Washington,Dc Re Proposed Standardization Policy Statement & Review of Issues Related to Reorganization of TVA Mgt Structure & Shutdown of TVA Nuclear Power Plants18 August 1986Summary of ACRS 316th Meeting on 860807-09 in Washington,Dc Re Proposed Standardization Policy Statement & Review of Issues Related to Reorganization of TVA Mgt Structure & Shutdown of TVA Nuclear Power PlantsFitness for Duty
Nondestructive Examination
ML20206S73613 August 1986Summary of ACRS Subcommittee on Westinghouse Reactor Plants 860730 Meeting in Washington,Dc Re Review of Loss of All in- Plant Ac Power & 851121 Water Hammer Event.Presentation Schedule & Sequence of Events EnclPower Operated Valves
Backfit
ML20202G24329 March 1986Discusses Unsettling Implications of Water Hammer Incident. Uncoupling of Util Licensing Engineering from Operations Seems to Ignore Lessons Learned from TMI
ML20199E34118 March 1986Requests That NRC Meet W/Acrs 2 Wks After Completion of SER to Review Actions Necessary for Restart
ML20205J74128 February 1986Summary of ACRS 310th Meeting on 860213-15 in Washington,Dc Re Review Studies Done & Procedures Proposed by Gpu Nuclear to Protect Against Inadvertent Criticality During Defueling of TMI-2 CoreEarthquake
ML20133G99710 July 1985Summary of ACRS SEP Subcommittee on San Onofre in Washington,Dc Re Integrated Plant Safety Analysis ReptProbabilistic Risk Assessment
Tornado Missile Protection
Earthquake
Backfit
ML20127G62319 June 1985Transcript of ACRS Subcommittee of SEP (San Onofre) 850619 Meeting in Washington,Dc.Pp 1-167.Supporting Documentation EnclSafe Shutdown
Ultimate heat sink
Tornado Missile
Hydrostatic
Probabilistic Risk Assessment
Coatings
Tornado Missile Protection
Earthquake
Control of Heavy Loads
Turbine Missile
Backfit
ML20141H0122 May 1985Forwards Listed Info Re Consideration of Earthquakes in Emergency PlanningSafe Shutdown Earthquake
Earthquake
ML20197J6942 May 1985Forwards Addl Info in Response to 850226 Request Re Emergency Evacuation Procedures During Seismic Events from Other Countries & Earthquake Emergency Planning Studies. W/O EnclEarthquake
IA-85-563, Forwards Listed Info Re Consideration of Earthquakes in Emergency Planning2 May 1985Forwards Listed Info Re Consideration of Earthquakes in Emergency PlanningSafe Shutdown Earthquake
Earthquake
ML20141G94620 February 1985Forwards Documentation on San Onofre & Diablo Canyon Sites Re Consideration of Earthquakes in Emergency Planning,In Response to ACRS 298th Meeting RequestEarthquake
ML20205D69814 November 1984Advises That ACRS Comments Re Adequacy of Facility Seismic Design Features Require More than Single Meeting & Later Deadline Due to Change in Approach from Context of SEP Review to Restart Decision
ML20137E1568 July 1982Discusses Control Room Effects of non-seismic Category 1 Sys Failures During Seismic Events,Based on Review of Facility Fsar.No Scenario Found Which Would Place Operator in Position of Having Inadequate Shutdown ControlsBoric Acid
Shutdown Margin
Ultimate heat sink
Probabilistic Risk Assessment
B.5.b Mitigating Strategies
Earthquake
ML20003F9633 March 1981Requests Opportunity to Review AR Nuclear One 2 start-up Rept & Software Change Procedures to Determine Whether Sys as Changed & Procedures Which Cover Future Chages Insure That Facility Operated in Safe Manner
ML20126D5513 December 1979Submits Addl Info Concerning 791116 Seismology Meeting Per 791130 Request.Meeting Minutes EnclEarthquake
ML20126D56320 November 1979Summary of 791116 Meeting W/Applicant Re SeismologyEarthquake
ML20126D52619 November 1979Summary of 791116 Meeting W/Applicant in Washington,Dc Re seismology.Woodward-Clyde Consultants Rept EnclDesign basis earthquake
Earthquake
ML19270H3517 April 1979Comments on NRC Licensing Review of Structural Conditions in Vicinity of Plant.Site Does Not Seem to Have Active Faulting
ML20126D5255 October 1978Summary of 780928-29 Meeting in Bethesda,Md Re New Seismic Info Concerning FacilityEarthquake
ML20148T8065 October 1978Comments on Tera Corp Rept Simulation of Earthquake Ground Motions. Rept Is a Breakthrough in Understanding Seismic Wave Propagation & Ground Motion Characteristics.Should Not Be Used to Provide Basic Plant Design CriteriaEarthquake
ML20148P80728 September 1978Reviews 780531 Final Rept, Simulation of Earthquake Ground Motions for Facility. Requests Applicant Supply Math Models Used in Swis,Prose & Faltung Programs.Analysis Remains in Linear Elastic Domain & Is Crude Approximation of RealityEarthquake
ML20235E92521 December 1972Forwards to Applicants Re Consequences of Postulated Pipe Failures Outside Containment Structure
ML20126D51917 May 1972Summary of Div of Reactor Licensing 720517 Meeting in Menlo Park,Ca Re SeismicitySafe Shutdown Earthquake
Earthquake
ML20126D51510 February 1972Notes of Div of Reactor Licensing 720210 Meeting in Houston, Tx Re geology-seismology
ML20126D49910 February 1972Forwards Notes of Div of Reactor Licensing 720210 Meeting in Houston,Tx Re geology-seismology
ML20125E43012 July 1971Believes Applicant Proposed Acceleration Value of 0.5 G Not Sufficiently Conservative
ML20126D4678 March 1971Forwards Minutes of Div of Reactor Licensing 710224 Meeting in Bethesda,Md Re seismology-geologyEarthquake
ML20126D47524 February 1971Minutes of Div of Reactor Licensing 710224 Meeting in Bethesda,Md Re geology-seismologyDesign basis earthquake
Earthquake
ML20126D4564 November 1970Notes of Div of Reactor Licensing 701103 Meeting in Bethesda MD Re GeologyEarthquake
ML20126D44731 July 1970Forwards Minutes Div of Reactor Licensing 700728-29 Meeting in Los Angeles,Ca
ML20126D45231 July 1970Summary of Div of Reactor Licensing 700728-29 Meeting in Los Angeles,Ca Re Exposed Fractures of Christiantos FaultEarthquake