Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
NUREG-0518, Summary of ACRS 316th Meeting on 860807-09 in Washington,Dc Re Proposed Standardization Policy Statement & Review of Issues Related to Reorganization of TVA Mgt Structure & Shutdown of TVA Nuclear Power Plants | 18 August 1986 | Summary of ACRS 316th Meeting on 860807-09 in Washington,Dc Re Proposed Standardization Policy Statement & Review of Issues Related to Reorganization of TVA Mgt Structure & Shutdown of TVA Nuclear Power Plants | Fitness for Duty Nondestructive Examination |
ML20206S736 | 13 August 1986 | Summary of ACRS Subcommittee on Westinghouse Reactor Plants 860730 Meeting in Washington,Dc Re Review of Loss of All in- Plant Ac Power & 851121 Water Hammer Event.Presentation Schedule & Sequence of Events Encl | Power Operated Valves Backfit |
ML20202G243 | 29 March 1986 | Discusses Unsettling Implications of Water Hammer Incident. Uncoupling of Util Licensing Engineering from Operations Seems to Ignore Lessons Learned from TMI | |
ML20199E341 | 18 March 1986 | Requests That NRC Meet W/Acrs 2 Wks After Completion of SER to Review Actions Necessary for Restart | |
ML20205J741 | 28 February 1986 | Summary of ACRS 310th Meeting on 860213-15 in Washington,Dc Re Review Studies Done & Procedures Proposed by Gpu Nuclear to Protect Against Inadvertent Criticality During Defueling of TMI-2 Core | Earthquake |
ML20133G997 | 10 July 1985 | Summary of ACRS SEP Subcommittee on San Onofre in Washington,Dc Re Integrated Plant Safety Analysis Rept | Probabilistic Risk Assessment Tornado Missile Protection Earthquake Backfit |
ML20127G623 | 19 June 1985 | Transcript of ACRS Subcommittee of SEP (San Onofre) 850619 Meeting in Washington,Dc.Pp 1-167.Supporting Documentation Encl | Safe Shutdown Ultimate heat sink Tornado Missile Hydrostatic Probabilistic Risk Assessment Coatings Tornado Missile Protection Earthquake Control of Heavy Loads Turbine Missile Backfit |
ML20141H012 | 2 May 1985 | Forwards Listed Info Re Consideration of Earthquakes in Emergency Planning | Safe Shutdown Earthquake Earthquake |
ML20197J694 | 2 May 1985 | Forwards Addl Info in Response to 850226 Request Re Emergency Evacuation Procedures During Seismic Events from Other Countries & Earthquake Emergency Planning Studies. W/O Encl | Earthquake |
IA-85-563, Forwards Listed Info Re Consideration of Earthquakes in Emergency Planning | 2 May 1985 | Forwards Listed Info Re Consideration of Earthquakes in Emergency Planning | Safe Shutdown Earthquake Earthquake |
ML20141G946 | 20 February 1985 | Forwards Documentation on San Onofre & Diablo Canyon Sites Re Consideration of Earthquakes in Emergency Planning,In Response to ACRS 298th Meeting Request | Earthquake |
ML20205D698 | 14 November 1984 | Advises That ACRS Comments Re Adequacy of Facility Seismic Design Features Require More than Single Meeting & Later Deadline Due to Change in Approach from Context of SEP Review to Restart Decision | |
ML20137E156 | 8 July 1982 | Discusses Control Room Effects of non-seismic Category 1 Sys Failures During Seismic Events,Based on Review of Facility Fsar.No Scenario Found Which Would Place Operator in Position of Having Inadequate Shutdown Controls | Boric Acid Shutdown Margin Ultimate heat sink Probabilistic Risk Assessment B.5.b Mitigating Strategies Earthquake |
ML20003F963 | 3 March 1981 | Requests Opportunity to Review AR Nuclear One 2 start-up Rept & Software Change Procedures to Determine Whether Sys as Changed & Procedures Which Cover Future Chages Insure That Facility Operated in Safe Manner | |
ML20126D551 | 3 December 1979 | Submits Addl Info Concerning 791116 Seismology Meeting Per 791130 Request.Meeting Minutes Encl | Earthquake |
ML20126D563 | 20 November 1979 | Summary of 791116 Meeting W/Applicant Re Seismology | Earthquake |
ML20126D526 | 19 November 1979 | Summary of 791116 Meeting W/Applicant in Washington,Dc Re seismology.Woodward-Clyde Consultants Rept Encl | Design basis earthquake Earthquake |
ML19270H351 | 7 April 1979 | Comments on NRC Licensing Review of Structural Conditions in Vicinity of Plant.Site Does Not Seem to Have Active Faulting | |
ML20126D525 | 5 October 1978 | Summary of 780928-29 Meeting in Bethesda,Md Re New Seismic Info Concerning Facility | Earthquake |
ML20148T806 | 5 October 1978 | Comments on Tera Corp Rept Simulation of Earthquake Ground Motions. Rept Is a Breakthrough in Understanding Seismic Wave Propagation & Ground Motion Characteristics.Should Not Be Used to Provide Basic Plant Design Criteria | Earthquake |
ML20148P807 | 28 September 1978 | Reviews 780531 Final Rept, Simulation of Earthquake Ground Motions for Facility. Requests Applicant Supply Math Models Used in Swis,Prose & Faltung Programs.Analysis Remains in Linear Elastic Domain & Is Crude Approximation of Reality | Earthquake |
ML20235E925 | 21 December 1972 | Forwards to Applicants Re Consequences of Postulated Pipe Failures Outside Containment Structure | |
ML20126D519 | 17 May 1972 | Summary of Div of Reactor Licensing 720517 Meeting in Menlo Park,Ca Re Seismicity | Safe Shutdown Earthquake Earthquake |
ML20126D515 | 10 February 1972 | Notes of Div of Reactor Licensing 720210 Meeting in Houston, Tx Re geology-seismology | |
ML20126D499 | 10 February 1972 | Forwards Notes of Div of Reactor Licensing 720210 Meeting in Houston,Tx Re geology-seismology | |
ML20125E430 | 12 July 1971 | Believes Applicant Proposed Acceleration Value of 0.5 G Not Sufficiently Conservative | |
ML20126D467 | 8 March 1971 | Forwards Minutes of Div of Reactor Licensing 710224 Meeting in Bethesda,Md Re seismology-geology | Earthquake |
ML20126D475 | 24 February 1971 | Minutes of Div of Reactor Licensing 710224 Meeting in Bethesda,Md Re geology-seismology | Design basis earthquake Earthquake |
ML20126D456 | 4 November 1970 | Notes of Div of Reactor Licensing 701103 Meeting in Bethesda MD Re Geology | Earthquake |
ML20126D447 | 31 July 1970 | Forwards Minutes Div of Reactor Licensing 700728-29 Meeting in Los Angeles,Ca | |
ML20126D452 | 31 July 1970 | Summary of Div of Reactor Licensing 700728-29 Meeting in Los Angeles,Ca Re Exposed Fractures of Christiantos Fault | Earthquake |