ST-HL-AE-4001, Forwards Emergency Response Data Sys Implementation Plan, Per 10CFR50,App E,Section VI.4.a.Implementing Procedures Will Be Modified to Require That Sys Be Activated within 1 H of Declaration of Alert

From kanterella
(Redirected from ST-HL-AE-4001)
Jump to navigation Jump to search
Forwards Emergency Response Data Sys Implementation Plan, Per 10CFR50,App E,Section VI.4.a.Implementing Procedures Will Be Modified to Require That Sys Be Activated within 1 H of Declaration of Alert
ML20079L389
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 10/28/1991
From: Jump W
HOUSTON LIGHTING & POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
ST-HL-AE-4001, NUDOCS 9111060253
Download: ML20079L389 (5)


Text

- - - --

The Light co m p a n y h""d' l "" "0"' U""" ""'"*""" "'""" ' * "" ' # * * * * "" h ' l " " "

llouston 1.ighting A Pourt October 28, 1991 ST ilL AE 4 001 File No.: G03.15, G03.17 10 CFR 50 56 FR 40178 U.S. Nuclear Reguletory Commission Attention: Doewnent Control Desk Washington, DC 20555 South Texas Project Electric Generating Station Units 1 and 2 Docket Nos. STN 50 498, STN 50 499 ERDS Impleyentation Plan The Emergency Response Data System (ERDS) itoplementation program plan for South Texas Project Units 1 and 2 is attached pursunne to 10 CFR Part 50, Appendix E, V1.4.a.

The ERDS datalink will be .ented on the STP Emergency Responst Facility Data Acquisition and Disp 1 .em (ERFDADS) for each unit as separate single feeder sites. The ERFDADS s u . re was originally developed by the same systems group that developed ERDS for the NRC, now known as llALL1 BURTON NUS Energy Group. This group is intimately f amiliar with both rystems; consequently, no significant compatibility issues are anticipated. No problems are anticipated in nieeting the 15-60 second rate for transmitting the data.

Configuration management will be used as an integral part of this modification. The Data Point Library (DPL), Plant Attribute Library (PAL) and hardware ins,allation configuration will be incorporated into engineering design documents under engineering change procedures. The ERFDADS database is controlled by the Database Change Request (DBCR) Procedure. The ERFDADS sof tware is controlled by the Computer Software Change Request (CSCR) procedute. All of these procedures will be changed to reficct the spirit and intent of NUREG-1394, Rev. 1, to ensure the integr ny of the ERDS hardware and software configuration at each reactor unit. These procedure changes will include appropriate provisions to allow the NRC to review proposed ERFDADS modifications which could affect the data communication protocol in advance of these changes to ensure that the changes are compatible with the ERDS.

The Ernergency Response plan implementing procedures will be rnodified to require ERDS to be activated as soon as possible within one hour of the declaration of an Alert or higher emergency classification level. The procedure changes are scheduled on the attached implementation plan.

msc\st 296.002 A Subsidiary of Ilouston indusuies incorporated I

9111060253 911018 \\

PDR ADOCK 05000498 i F PDR

.. Ilou' don Lighting & Power Company South Tuan Projett Elettric Generalitig Station .

ST ill, AE 4 001

  • Filo lio.: 003.15, 003.17 Page 2 If you should have any questions on this matter, please contact A V. liarrison at ($12) 972 728.

~

y /; g g Q e t c .

l Vil.liam J. Jump

" f lianage r .

fiuclear t.teensing ,

1 1

AWil/arop .

Attachaent: STP ERDS Implementation Plan ,

1 i

1

}

T h

MISC \91 288.002 Il i.

_..:.._ -._._,___.._,.-.-___~..__.__....__._.c.._ . . _ _ _ _ . . . . . . , . - , _ . . . . ...._,c____._.._.-_ . , _ - , _

. I ST ItL. AE 4001

. File No. : G03.15, 003.17 Page 3 1

cc:

John R. Jolicoeur ERDS Project Manager U S, Nuclear Regulatory Conunission Hall Stop MNBB 3206 Washington, DC 20555 Tony P. LaRosa Manager, Special Projects IIALLIBURTON NUS P.O. Box 50736 Idaho Falls, ID 83405  ;

Toto Crawford/DED j

4 t .. -

l s

?

4 5

r L

e r

e HISC\P1 398.002

ST llL AE 4 001 llouston Lighting & Powcr Company Pile No.- GO3.15 G03,17 South Tnas Projut 1.lutric Genu ating Station Page 4 cc:

Regional Administrator, Region IV Rufus S. Scott Nuclear Regulatory Commission Associate General Counsel 611 Ryan Plaza Drive, Suite 400 llouston Lighting & Power company Arlington, TX 76011 P. O. Box 51867 llounton, TX 77208 George Dick, Project Manager U.S. Nuclear Regulatory Commission INPO Vashington, DC 20555 Records Center 1100 Circle 75 Parkway J. I. Tapia Atlanta, CA 30339-3064 Senior Resident Inapector c/o U. S. Nucicar Regulatory Dr. Joseph M. llendrie Commission 50 Be11 port Lane P. O. Box 910 Be11 port, NY 11713 Bay City, TX 77414 D. K. Lacher J. R. Newman, Esquire Bureau of Radiation Control Newman & llolu:inger, P.C. Texas Department of Health 1615 L Street, N.V. 1100 Vest 49th Street Vashington, DC 20036 Aastin, TX 78756-3189 D. E. Ward /T M. Puckett Central Power and Light Company P. O. Box 2121 Corpus Chrisci, TX 78403 J. C. Lanier/M. B. Lee City of Austin Electric Utility Department P.O. box 1088 Austin, TX 78767 K. J . Fiedler/M. T. Hardt City Public Service Board P. O. Box 1771 San Antonio, TX 78296 Revised 10/11/91 L4/NRC/

Attachment

,' S*t llL. AE 4 001 Page 1 of 1 STP ERDS IMPLEMENTATION PIAN 1

ACTIVITY NUMBER. ACTIVITY START E.lti.1111 ST 01 STP keceives Questionnaire --

07/10/91 ST 02 NRC Contacts STP -

08/27/91 ST403 NRC Conducts STP Site Visit (Reg, IV Of fice) - - -

09/24/91 ST.04 STP Submit Implementation Plan to NRC 09/91 10/28/91 ST 05 NRC Install Phone Lines and Provide liardware - - -

05/01/92 ST 06 STi - Complete Data Point- Library / Plant Attribute Library (DPL/ PAL) and send to NRC 10/91 03/06/92 ST 07 Perform ERLS Modifications 10/91 06/01/92 ST408 . Develop Software for DPL 03/92 04/17/92 ST 09 _STP-Develop Site-Software 03/92 05/01/92 ST 10 STP (U1) conduct Prelimitiary Test 05/04/9;' 05/08/92 I ST 11 STP (02) conduct Preliminary Test 05/11/92 05/15/92 ST 12 . STP conduct Factory System Test 05/18/92 05/22/92 ST 13 STP & NRC Final Sith Acceptance Test 05/25/92 05/29/92 ST 14 STP ERDS-"0N LINE" -

06/01/92 ,

ST-15 Issue Change to Emergeacy Responso Plan - - --

06/01/92  ;

ST 16 Issue Change te Configuration Procedutes --

06/01/92 ST 17 STP ERDS Implementation Complete -

06/01/92 NOTE: This ambitious schedule is recommended by STP to accommooste the earliest I installation and minimize critical path loading on the NPC for final testing, !,hould problems arise, the schedule affords scheduling latitude -

up to the 10CFR Part 50 ERDS implementation date of Februtary 13, 1993, t

HISC)Dt-298.002