SNRC-1828, Forwards Rev 3 to Shoreham Defueled SAR & Rev 5 to Fire Hazards Analysis Rept

From kanterella
Jump to navigation Jump to search
Forwards Rev 3 to Shoreham Defueled SAR & Rev 5 to Fire Hazards Analysis Rept
ML20082M499
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 08/26/1991
From: Leonard J
LONG ISLAND LIGHTING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20082M500 List:
References
SNRC-1828, NUDOCS 9109050229
Download: ML20082M499 (3)


Text

_ _ _ _ _ .

f- , ,

, 7-

_ l

,#{@ LONG lSLAND LIGHTING COM PANY SHOREH AM NUCLE AR POWER ST ATION

.___+e =  !

P O. DOM 018. NORTH COUNT RY RO AD

  • W ADING RIVE"R. N Y 11792

- JOHN D. LEON ARD, JR.

YCE PRESIDENT .OmCE OF CORPORAlf BERVICES AND VII E PREstDENT + OFFG OF NUCLt AR SNI:C-1828 AUG 2 01991 L- U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Submittal of Revision 3 to the Shorehan. Defueled Safety Analysis Report and Revision 5 to the ,

Fire Hazards Analysis Report Shoreham Nuclear Power Station Docket. No. 50-322

{ Gentlemen:

I With the issuance of Shoreham's Possession-Only License (POL) ,

the Defueled Safety Analysis Report (DSAR) was accepted as a supplement to the USAR. He are hereby submitting 11 controlled

- copies of Revision 3 of the DSAR (for administrative reasons there was no Revision 2). The changes instituted by this .59.

revision were made pursuant to the provisions of 10 CFR 5 1 Also enclosed are 11 copies of revised Fire Hazards Analysis  !

Report pagen which constitute revision 5 to that document. Since the POL is now effective, these changes are effective.  ;

- Should you require any additional information concerning this I submittal, please do not hesitate to contact this office. ]

i

Very truly yours, 1 l

l

@ ,. >%[d

\ 1, n. .. . . w ..

n,. ? -u i

L -1 Leonar

. vi 9 Wi.h J. D. M. : (}QLLyX[e , Jr.

) M.f

/Vi e President, Ofi[c e of Corporate Services -ui; T m an Vice President, Office of Nuclear m,

_ .p sx ,

.. c., w 9109050229 910g24 e N PG ab @ ., .j(?j

.4

' Enclosures hDR ADOCK 05000377 PDR EiEDMiFalllBI S. Brown

/ $ 'g3

/

cc: - , , , ,

r T. T. Martin b _U U ' U d g l B. Norris L_.;

.g <

AFFIDAVIT STATE OF NEW YORK )

SS:

COUNTY OF SUFFOLK )

I, J011N D . LEONARD, JR., being dul) .. depose and say that I am the Vice President, Office of Cox, s Services and Vice President, Office of Nuclear for the L ng Island Lighting Company; that I am authorized on the part of said comuary to sign and file with the U.S. Nuclear Regulatory Commission llevision 3 of the Defueled Safety Analysis Report and Revision 5 of the Fire llazards Analysis Report for the Shoreham Nuclear Power Station; that these reports were prepared under my supervision and direction; and that the statements contained therein present to the best of my knowledge, information and belief, the facility, as it exists August 7, 1991.

[ ()'

Ky (

L [CQ ,

'Joh D. Leonard, Jr.  !

-J Sworn to before me this e M day of utus J

1991

( OwaA.SML wnu um' f.~ Y A NOTAfN NL oc. +

tn ? % .: n l(IN k Ai'U fe*J) 10 sU w

1 O NLR 91-0282 August 6, 1991 All Controlled Copy Holders of SNPS Updated Safety Analysis Report (USAR)

Defueled Safety Analysis Report (DSAR)

Ref: J.D. Leonard, Jr. to All Shoreham Site and Support Organizations, VPNO 91-80 (August 5, 1991)

Attached, herewith, is a controlled copy of the DSAR through and including Revision 3. This is the first issuance of the DSAR as a controlled document. This document completely replaces all other versions of DSAR (they are to be discarded).

In accordance with Mr. Leonard's referenced memo, the DSAR becomes effective 12:01 a.m. August 7, 1991.

Please acknowledge receipt of this memo and the associated document by signing the attached document transmittal form and returning it to Document Control.

-7 -7

,/ ,

e /

L. F. Britt Manager, Nuclear Licensing & Regulatory Affairs PGP/ab cc: NOSD File Records Management O ,

_ _ _ _ _ _ _ _ ______