MONTHYEARRS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-090, Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station2023-09-0707 September 2023 Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2023-08-30030 August 2023 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs RS-23-081, Request for License Amendment to Revise Technical Specifications Related to Reactor Water Cleanup Isolation Instrumentation2023-08-21021 August 2023 Request for License Amendment to Revise Technical Specifications Related to Reactor Water Cleanup Isolation Instrumentation RS-23-085, Supplemental Information Related to Request for Partial Site Release2023-08-0303 August 2023 Supplemental Information Related to Request for Partial Site Release RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations RS-23-073, Request for Partial Site Release2023-06-0707 June 2023 Request for Partial Site Release RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-23023 March 2023 Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations RS-23-039, Request for License Amendment to Revise Technical Specifications Section 3.8.3, Diesel Fuel Oil, Lube Oil, and Starting Air2023-03-0101 March 2023 Request for License Amendment to Revise Technical Specifications Section 3.8.3, Diesel Fuel Oil, Lube Oil, and Starting Air RS-23-045, Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.2032023-02-28028 February 2023 Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.203 RS-23-003, Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-102023-01-31031 January 2023 Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 RS-23-002, Application to Adopt TSTF-332, ECCS Response Time Testing2023-01-13013 January 2023 Application to Adopt TSTF-332, ECCS Response Time Testing RS-22-126, Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2022-11-30030 November 2022 Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI RS-22-121, Notice of Intent to Pursue Subsequent License Renewal Applications2022-11-0909 November 2022 Notice of Intent to Pursue Subsequent License Renewal Applications RS-22-092, Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration2022-10-0303 October 2022 Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration RS-22-107, Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station2022-09-29029 September 2022 Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station RS-22-093, Advisement of Leadership Changes for Constellation Energy Generation, LLC and Submittal of Updated Standard Practice Procedures Plans2022-08-18018 August 2022 Advisement of Leadership Changes for Constellation Energy Generation, LLC and Submittal of Updated Standard Practice Procedures Plans RS-22-089, Additional Information Supporting Request for License Amendment to Revise the Secondary Containment Design Basis to Credit the Fuel Building Railroad Airlock2022-07-25025 July 2022 Additional Information Supporting Request for License Amendment to Revise the Secondary Containment Design Basis to Credit the Fuel Building Railroad Airlock RS-22-061, Request for License Amendment to Adopt TSTF-269, Revision 2, Allow Administrative Means of Position Verification for Locked or Sealed Valves2022-05-24024 May 2022 Request for License Amendment to Adopt TSTF-269, Revision 2, Allow Administrative Means of Position Verification for Locked or Sealed Valves RS-22-060, Request for License Amendment to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling2022-05-24024 May 2022 Request for License Amendment to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling RS-22-068, Constellation Radiological Emergency Plan Addendum Revision2022-05-19019 May 2022 Constellation Radiological Emergency Plan Addendum Revision RS-22-055, Submittal of Preliminary Decommissioning Cost Estimate and Spent Fuel Management Plan2022-04-18018 April 2022 Submittal of Preliminary Decommissioning Cost Estimate and Spent Fuel Management Plan RS-22-051, Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists2022-04-12012 April 2022 Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists RS-22-020, Request for License Amendment to Revise the Secondary Containment Design Basis to Credit the Fuel Building Railroad Airlock2022-04-0707 April 2022 Request for License Amendment to Revise the Secondary Containment Design Basis to Credit the Fuel Building Railroad Airlock RS-22-049, Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellation'S Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for2022-04-0404 April 2022 Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellation'S Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for V RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations RS-22-027, Constellation, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated2022-02-23023 February 2022 Constellation, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated P RS-22-023, Constellation Energy Generation, LLC, Executed Trust Fund Agreement Amendment and Subordinate Trust Agreement2022-02-23023 February 2022 Constellation Energy Generation, LLC, Executed Trust Fund Agreement Amendment and Subordinate Trust Agreement RS-22-019, Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists2022-02-16016 February 2022 Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists RS-22-015, Notification of Completion of License Transfer and Request to Continue Processing Pending NRC Actions Previously Requested by Exelon Generation Company, LLC2022-02-0101 February 2022 Notification of Completion of License Transfer and Request to Continue Processing Pending NRC Actions Previously Requested by Exelon Generation Company, LLC RS-22-004, Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2022-01-0404 January 2022 Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RS-21-121, Proposed Changes to Decommissioning Trust Agreements and Master Terms2021-12-15015 December 2021 Proposed Changes to Decommissioning Trust Agreements and Master Terms RS-21-102, Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors2021-09-29029 September 2021 Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors RS-21-091, Implementation of Insider Threat Program Requirements Associated with the Voluntary Security Clearance Program and Advisement of Leadership Changes2021-09-13013 September 2021 Implementation of Insider Threat Program Requirements Associated with the Voluntary Security Clearance Program and Advisement of Leadership Changes RS-21-087, Additional Information Supporting Request for License Amendment to Revise Degraded Voltage Relay Allowable Values2021-08-31031 August 2021 Additional Information Supporting Request for License Amendment to Revise Degraded Voltage Relay Allowable Values RS-21-078, Response to Request for Additional Information for Application to Revise Technical Specification to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements, and TSTF-583-T, TSTF-582 Diesel2021-08-19019 August 2021 Response to Request for Additional Information for Application to Revise Technical Specification to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements, and TSTF-583-T, TSTF-582 Diesel RS-21-076, Application to Adopt TSTF-273, Safety Function Determination Program Clarifications2021-07-30030 July 2021 Application to Adopt TSTF-273, Safety Function Determination Program Clarifications RS-21-070, Proposed Alternative to Utilize Code Case N-8932021-06-30030 June 2021 Proposed Alternative to Utilize Code Case N-893 RS-21-063, Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2021-06-30030 June 2021 Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RS-21-069, Third Inservice Inspection Interval Relief Request I3R-182021-06-28028 June 2021 Third Inservice Inspection Interval Relief Request I3R-18 RS-21-054, Response to NRC Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations2021-04-29029 April 2021 Response to NRC Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations RS-21-039, Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments2021-03-25025 March 2021 Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments RS-21-037, Response to Request for Additional Information Regarding License Amendment Request to Adopt TSTF-505, Revision 22021-03-23023 March 2021 Response to Request for Additional Information Regarding License Amendment Request to Adopt TSTF-505, Revision 2 RS-21-028, Fitness for Duty Performance Data Reports - Annual 20202021-02-26026 February 2021 Fitness for Duty Performance Data Reports - Annual 2020 RS-21-032, Amended Decommissioning Trust Agreements2021-02-25025 February 2021 Amended Decommissioning Trust Agreements RS-21-014, License Amendment Request for One-Time Extension of the Containment Type a Integrated Leakage Rate Test Frequency2021-02-24024 February 2021 License Amendment Request for One-Time Extension of the Containment Type a Integrated Leakage Rate Test Frequency RS-21-030, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2021-02-24024 February 2021 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations RS-21-005, Request for License Amendment to Revise Degraded Voltage Relay Allowable Values2021-01-20020 January 2021 Request for License Amendment to Revise Degraded Voltage Relay Allowable Values RS-21-001, Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping2021-01-0404 January 2021 Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping 2023-09-07
[Table view] Category:Response to Request for Additional Information (RAI)
MONTHYEARRS-22-089, Additional Information Supporting Request for License Amendment to Revise the Secondary Containment Design Basis to Credit the Fuel Building Railroad Airlock2022-07-25025 July 2022 Additional Information Supporting Request for License Amendment to Revise the Secondary Containment Design Basis to Credit the Fuel Building Railroad Airlock CNL-22-064, Response to Request for Additional Information Regarding Tennessee Valley Authority License Amendment Request to Revise Emergency Plan Implementing Procedure Regarding Seismic Event Emergency Action Level Change2022-06-0909 June 2022 Response to Request for Additional Information Regarding Tennessee Valley Authority License Amendment Request to Revise Emergency Plan Implementing Procedure Regarding Seismic Event Emergency Action Level Change RS-22-027, Constellation, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated2022-02-23023 February 2022 Constellation, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated P NMP1L3447, Constellation Energy Generation, LLC - Response to Request for Additional Information - Proposed Relief Request Associated with Reactor Pressure Vessel Water Level Instrumentation Partial Penetration Nozzle Repairs2022-02-0202 February 2022 Constellation Energy Generation, LLC - Response to Request for Additional Information - Proposed Relief Request Associated with Reactor Pressure Vessel Water Level Instrumentation Partial Penetration Nozzle Repairs JAFP-21-0087, Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments2021-09-16016 September 2021 Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments RS-21-087, Additional Information Supporting Request for License Amendment to Revise Degraded Voltage Relay Allowable Values2021-08-31031 August 2021 Additional Information Supporting Request for License Amendment to Revise Degraded Voltage Relay Allowable Values RS-21-078, Response to Request for Additional Information for Application to Revise Technical Specification to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements, and TSTF-583-T, TSTF-582 Diesel2021-08-19019 August 2021 Response to Request for Additional Information for Application to Revise Technical Specification to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements, and TSTF-583-T, TSTF-582 Diesel NMP2L2773, Company - Response to Request for Additional Information2021-06-30030 June 2021 Company - Response to Request for Additional Information JAFP-21-0044, Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments2021-06-11011 June 2021 Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments JAFP-21-0032, Response to Request for Additional Information - Proposed Alternative Concerning ASME Section XI Repair/Replacement Documentation for Replacement of Pressure Retaining Bolting2021-04-20020 April 2021 Response to Request for Additional Information - Proposed Alternative Concerning ASME Section XI Repair/Replacement Documentation for Replacement of Pressure Retaining Bolting ML21111A0042021-04-20020 April 2021 Response to Request to Request Clinton, Unit 1, COVID-19 Related Request for Exemption from Part 26 Work Hours Requirements RS-21-037, Response to Request for Additional Information Regarding License Amendment Request to Adopt TSTF-505, Revision 22021-03-23023 March 2021 Response to Request for Additional Information Regarding License Amendment Request to Adopt TSTF-505, Revision 2 RS-20-139, Response to Request for Additional Information Regarding License Amendment Requests to Adopt TSTF-505, Revision 2, and 10 CFR 50.692020-11-24024 November 2020 Response to Request for Additional Information Regarding License Amendment Requests to Adopt TSTF-505, Revision 2, and 10 CFR 50.69 RS-20-096, Response to Request for Additional Information Related to Relief Request I4R-07 for the Fourth Inservice Inspection Interval2020-08-13013 August 2020 Response to Request for Additional Information Related to Relief Request I4R-07 for the Fourth Inservice Inspection Interval RS-20-095, Response to Request for Additional Information Related to Relief Request I4R-06 for the Fourth Inservice Inspection Interval2020-08-13013 August 2020 Response to Request for Additional Information Related to Relief Request I4R-06 for the Fourth Inservice Inspection Interval ML20188A2642020-07-0606 July 2020 Clinton Power Station, R.E. Ginna Station, Limerick Station, Nine Mile Point Station & Peach Bottom Station - Proposed Alternative to Utilize Code Case OMN-26 - Response to Request for Additional Information RS-20-069, Additional Information Supporting Request for License Amendment Regarding Automatic Operation of Transformer Load Tap Changer2020-06-29029 June 2020 Additional Information Supporting Request for License Amendment Regarding Automatic Operation of Transformer Load Tap Changer RS-20-067, Response to Request for Additional Information Related to Relief Request I4R-01 for the Fourth Inservice Inspection Interval2020-05-13013 May 2020 Response to Request for Additional Information Related to Relief Request I4R-01 for the Fourth Inservice Inspection Interval RS-20-045, Response to Request for Additional Information Related to Relief Request 14R.05 for the Fourth Inservice Inspection Interval2020-04-0101 April 2020 Response to Request for Additional Information Related to Relief Request 14R.05 for the Fourth Inservice Inspection Interval RS-19-112, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications Following Adoption of TSTF-542, Reactor Pressure Vessel Water Inventory Control2019-12-0505 December 2019 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications Following Adoption of TSTF-542, Reactor Pressure Vessel Water Inventory Control NMP2L2711, Byron Station; Calvert Cliffs; Clinton Power Station; LaSalle County Station; Limerick Generating Station; and Nine Mile Point Nuclear Station - Proposed Alternative to Utilize Code Case N-8792019-10-16016 October 2019 Byron Station; Calvert Cliffs; Clinton Power Station; LaSalle County Station; Limerick Generating Station; and Nine Mile Point Nuclear Station - Proposed Alternative to Utilize Code Case N-879 JAFP-19-0057, Response to Request for Additional Information - Proposed Alternative to Utilize Code Cases N-878 and N-8802019-06-0404 June 2019 Response to Request for Additional Information - Proposed Alternative to Utilize Code Cases N-878 and N-880 NMP1L3279, Response to Request for Additional Information - Proposed Alternatives to Utilize Code Cases N-878 and N-880 for Plants2019-05-0101 May 2019 Response to Request for Additional Information - Proposed Alternatives to Utilize Code Cases N-878 and N-880 for Plants JAFP-19-0006, Response to Request for Additional Information - Proposed Alternative to Utilize Code Cases N-878 and N-8802019-01-0808 January 2019 Response to Request for Additional Information - Proposed Alternative to Utilize Code Cases N-878 and N-880 RS-18-150, Transmittal of Supplemental Information for Exelon Evaluation of Preliminary White Finding2018-12-20020 December 2018 Transmittal of Supplemental Information for Exelon Evaluation of Preliminary White Finding RS-18-143, Supplemental Information Supporting License Amendment Requests for Approval of Changes to Emergency Plan Staffing Requirements2018-11-29029 November 2018 Supplemental Information Supporting License Amendment Requests for Approval of Changes to Emergency Plan Staffing Requirements RS-18-103, Response to Request for Additional Information Concerning License Amendment Request to Revise Alternate Source Term Dose Calculation2018-08-29029 August 2018 Response to Request for Additional Information Concerning License Amendment Request to Revise Alternate Source Term Dose Calculation RS-18-097, Response to Request for Additional Information and Supplemental Information-License Amendment.2018-07-27027 July 2018 Response to Request for Additional Information and Supplemental Information-License Amendment. RS-18-067, Response to Request for Additional Information Regarding Generic Letter 2016-012018-05-29029 May 2018 Response to Request for Additional Information Regarding Generic Letter 2016-01 RS-18-061, Response to Request for Additional Information Regarding Decommissioning Funding Plans for Independent Spent Fuel Storage Installations (Isfsis)2018-05-0202 May 2018 Response to Request for Additional Information Regarding Decommissioning Funding Plans for Independent Spent Fuel Storage Installations (Isfsis) ML18025A7992018-01-25025 January 2018 Response to Request for Additional Information Regarding Generic Letter 2016-01 RS-17-145, Supplement to Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control2017-11-15015 November 2017 Supplement to Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control RS-17-079, Response to Request for Additional Information Regarding the Permanent Extension of Leak Rate Testing2017-06-0101 June 2017 Response to Request for Additional Information Regarding the Permanent Extension of Leak Rate Testing RS-17-044, Response to Request for Additional Information Regarding Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography2017-03-13013 March 2017 Response to Request for Additional Information Regarding Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography RS-17-020, Response to RAI Concerning License Amendment Request to Revise Technical Specification Section 5.5.13, Primary Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2017-03-0202 March 2017 Response to RAI Concerning License Amendment Request to Revise Technical Specification Section 5.5.13, Primary Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies RS-16-121, Response to Request for Additional Information Concerning License Amendment Request to Incorporate Revised Alternative Source Term Dose Calculation in USAR2016-06-0202 June 2016 Response to Request for Additional Information Concerning License Amendment Request to Incorporate Revised Alternative Source Term Dose Calculation in USAR RA-16-049, Response to Request for Additional Information Regarding Requests to Withhold Emergency Preparedness Documents from Public Disclosure2016-05-26026 May 2016 Response to Request for Additional Information Regarding Requests to Withhold Emergency Preparedness Documents from Public Disclosure RS-16-077, Response to Request for Additional Information Regarding Request for License Amendment to Reduce the Reactor Steam Dome Pressure Specified in the Technical Specification 2.1.1, Reactor Core Sls.2016-04-14014 April 2016 Response to Request for Additional Information Regarding Request for License Amendment to Reduce the Reactor Steam Dome Pressure Specified in the Technical Specification 2.1.1, Reactor Core Sls. RS-15-278, Supplement to Request for Additional Information Regarding License Amendment Request for a One-Time Extension of the Shutdown Service Water Division 2 Subsystem Completion Time2015-10-20020 October 2015 Supplement to Request for Additional Information Regarding License Amendment Request for a One-Time Extension of the Shutdown Service Water Division 2 Subsystem Completion Time RS-15-260, Response to Request for Additional Information Regarding License Amendment Request for a One-Time Extension of the Shutdown Service Water Division 2 Subsystem Completion Time2015-09-30030 September 2015 Response to Request for Additional Information Regarding License Amendment Request for a One-Time Extension of the Shutdown Service Water Division 2 Subsystem Completion Time RS-15-141, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 5.5.2, Primary Coolant Sources Outside Containment.2015-06-24024 June 2015 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 5.5.2, Primary Coolant Sources Outside Containment. 2022-07-25
[Table view] |
Text
4300 Winfield Road Warrenville, IL 60555 630 657 2000 Office RS-20-096 10 CFR 50.55a August 13, 2020 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461
Subject:
Response to Request for Additional Information Related to Relief Request I4R-07 for the Fourth Inservice Inspection Interval
References:
- 1. Letter from D. M. Gullott (Exelon Generation Company, LLC) to U.S. NRC, "Relief Requests Associated with the Fourth Inservice Inspection Interval,"
dated December 16, 2019
- 2. Email from J. Wiebe (U.S. NRC) to K. M. Nicely (Exelon Generation Company, LLC), "Preliminary RAIs for Clinton Relief Request I4R-07," dated July 22, 2020 In Reference 1, in accordance with 10 CFR 50.55a, "Codes and standards," paragraph (z)(1),
Exelon Generation Company, LLC (EGC) requested NRC approval of the several relief requests associated with the fourth Inservice Inspection (ISI) interval for Clinton Power Station (CPS),
Unit 1. One of the relief requests (i.e., Relief Request I4R-07) requested approval to eliminate volumetric examination of the reactor pressure vessel (RPV) threads in flange (i.e., Category B-G-1 examinations) during the fourth inservice inspection (ISI) interval.
In Reference 2, the NRC requested additional information that is needed to complete review of Relief Request I4R-07, "Alternative to Use ASME Code Case N-864, Examination of ASME Section XI, Examination Category B-G-1, Item Number B6.40, Threads in Flange." In response to this request, EGC is providing the attached information.
August 13, 2020 U.S. Nuclear Regulatory Commission Page 2 There are no regulatory commitments contained within this letter. Should you have any questions concerning this letter, please contact Mr. Kenneth M. Nicely at (630) 657-2803.
Respectfully, Patrick R. Simpson Sr. Manager Licensing
Attachment:
Response to Request for Additional Information Regarding Relief Request I4R-07 cc: NRC Regional Administrator, Region III NRC Senior Resident Inspector - Clinton Power Station
ATTACHMENT Response to Request for Additional Information Regarding Relief Request I4R-07 NRC Request In its December 16, 2019, description of procedure MA-CL-716-102, "Reactor Disassembly,"
and procedure MA-CL-716-103, "Reactor Assembly," the licensee describes the cleaning, inspection (for nicks, marks, or signs of galling), and lubrication of nut and stud threads and washers. Regarding the RPV stud holes the licensee states that the [assembly] procedure requires cleaning RPV stud holes and lubricating threads with approved thread lubricant.
In order for the NRC staff to determine that the proposed alternative will provide an acceptable level of quality and safety, describe the inspections that are performed on the RPV stud holes and threads. Alternatively, provide information that demonstrates that gross degradation of the threads will not go unnoticed for extended periods of time.
Response
As stated in Relief Request I4R-07, to protect against non-service related degradation, Clinton Power Station (CPS) uses detailed procedures for the care and visual inspection of the reactor pressure vessel (RPV) studs and the threads in flange each time the RPV closure head is removed. Care is taken to inspect the RPV threads for damage and to protect threads from damage when the studs are removed. Prior to reinstallation, the studs and stud holes are cleaned and lubricated. The studs are then replaced and tensioned into the RPV flange. This activity is performed each time the closure head is removed, and the procedures document each step. These controlled maintenance activities provide further assurance that degradation is detected and mitigated prior to returning the reactor to service.
The following excerpts from CPS procedures describe the care and visual inspections currently performed on the RPV threads in flange and studs.
REACTOR DISASSEMBLY (MA-CL-716-102, Revision 15) 4.11.1. VERIFY RPV stud threads and RPV head flange including around nuts and washers are free of debris prior to de-tensioning, CLEAN as required and peer check.
Init FLS/TD 4.11.2. APPLY a light coating of DAG-156 to all RPV studs to assist in nut rotation, prior to de-tensioning after cleaning is completed.
4.15.1. INSPECT RPV studs and RPV flange for debris. CLEAN as required.
4.15.6. (Initial) INSTALL flange protector and if required, INSTALL stud protectors on RPV studs as directed by the refuel floor supervisor.
Page 1
ATTACHMENT Response to Request for Additional Information Regarding Relief Request I4R-07 4.17.1. CLEAN as necessary, and INSPECT RPV nut and stud threads for nicks, marks, or signs of galling.
REACTOR ASSEMBLY (MA-CL-716-103, Revision 15) 4.1. RE-ASSEMBLY PREPS 4.1.3. Clean RPV head components and flange NOTE: RPV head flange and components shall be cleaned of all dirt and granular type material by brushing, blasting with air (except O-ring grooves), wiping with lint free wipes, or by using either demineralized water or approved cleaning fluid. If bristle brushing or air blasting is used consult with RP prior to use.
- 2. CLEAN surfaces of RPV head as follows:
A. Head flange surface. Remove dirt, debris and residual silver build-up.
B. Stud holes NOTE: Closure nuts and washers are a matched set. Maintain corresponding nuts and washers as a set.
C. Stud washers D. Closure nuts E. Removed Studs F. Extensometer rods G. Extensometer rod holes in studs H. Stud cap screws I. Metal O-rings as necessary 4.5. PREPARE REACTOR CAVITY FOR RPV HEAD INSTALLATION 4.5.3. CLEAN RPV flange stud holes, and LUBRICATE threads with approved thread lubricant.
4.5.4. REMOVE thread protectors and stud caps from RPV studs, if installed.
4.5.5. ENSURE stud guide caps installed on studs C-1 and G-1.
Page 2
ATTACHMENT Response to Request for Additional Information Regarding Relief Request I4R-07 NOTE: RPV head and vessel flanges and seal components shall be cleaned of all dirt and granular type material before RPV head can be installed.
4.5.6. (Initial) REMOVE RPV vessel flange seal surface protectors and CLEAN RPV flange by wiping with lint free wipes, or by using either demineralized water or approved cleaning fluid.
4.7. SET RPV HEAD 4.7.8. LOWER RPV head to flange.
- 1. ENSURE that the RPV head remains level to within 1" across the entire diameter, by continuous measurement, as it lowers.
- 2. VERIFY, prior to landing:
- i. RPV head O-ring retaining hardware is in place.
ii. RPV flange is free from debris or any granular material.
iii. ENSURE removed studs will thread in w/out interference and RPV head will rest squarely on RPV flange.
- 3. Using slow speed and monitoring load cell LOWER RPV head ensuring head does not bind on studs or guide caps.
Init FLS/TD 4.7.9. REMOVE stud guide caps.
4.8. INSTALL RPV STUDS AND NUTS 4.8.8. CAREFULLY align and start thread engagement of RPV stud into RPV flange.
4.8.9. Using stud runner tool, cautiously THREAD RPV stud into RPV flange.
4.8.10. Slowly BOTTOM-OUT RPV stud in RPV flange hole.
4.8.11. BACK-OFF RPV stud one quarter turn.
4.8.12. REPEAT steps 4.8.1 to 4.8.11 to install remaining RPV studs.
4.8.16. LUBRICATE RPV studs/nuts with approved thread lubricant.
Page 3
ATTACHMENT Response to Request for Additional Information Regarding Relief Request I4R-07 4.8.17. (Initial) INSTALL nuts and washers on RPV studs.
- 1. ENSURE spherical side of washer is facing up and the flat side is against the RPV.
- 2. ENSURE washer is approximately centered on stud.
4.8.18. (Initial) Technical Director/FLS VERIFY correct RPV washer orientation.
4.8.19. RUN nuts down close to washer and VERIFY the nut is free to turn and that it is not in contact with the washer.
4.9. TENSION RPV STUDS 4.9.10. VERIFY RPV stud threads and flange, including around nuts and washers, are free of debris prior to tensioning. CLEAN as required.
Init FLS/TD 4.9.19. TENSION RPV studs.
Page 4