RS-03-236, Transmittal of Non-Proprietary Version of Information Supporting Request for Amendment to Technical Specifications Section 5.6.5, Core Operating Limiits Report (Colr).
From kanterella
(Redirected from RS-03-236)
Jump to navigation
Jump to search
ML033520508 | |
Person / Time | |
---|---|
Site: | LaSalle |
Issue date: | 12/17/2003 |
From: | Ainger K Exelon Generation Co, Exelon Nuclear |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
RS-03-236 NEDO-33106, Rev 0 | |
Download: ML033520508 (46) | |
Similar Documents at LaSalle | |
---|---|
Category:Letter type:RS
MONTHYEARRS-24-064, Nuclear Radiological Emergency Plan Document Revisions2024-06-28028 June 2024
[Table view]Nuclear Radiological Emergency Plan Document Revisions RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report RS-24-038, Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-05-0202 May 2024 Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report RS-24-014, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2024-02-22022 February 2024 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors RS-23-120, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information2023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information RS-23-103, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-10-13013 October 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2023-08-30030 August 2023 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs RS-23-087, Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor2023-08-0404 August 2023 Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor RS-23-084, Response to Request for Additional Information Regarding the Application to Revise Design Basis to Allow Use of Plastic Section Properties in Lower Downcomer Braces Analysis2023-07-24024 July 2023 Response to Request for Additional Information Regarding the Application to Revise Design Basis to Allow Use of Plastic Section Properties in Lower Downcomer Braces Analysis RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-23023 March 2023 Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations RS-23-048, Exigent Amendment Request to Revise Design Basis Related to Seismic Requirements2023-03-0707 March 2023 Exigent Amendment Request to Revise Design Basis Related to Seismic Requirements RS-23-045, Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.2032023-02-28028 February 2023 Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.203 RS-23-037, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for LaSalle County Station2023-02-22022 February 2023 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for LaSalle County Station RS-23-003, Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-102023-01-31031 January 2023 Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 RS-22-085, Application to Revise Design Basis to Allow Use of Plastic Section Properties in Lower Downcomer Braces Analysis2023-01-12012 January 2023 Application to Revise Design Basis to Allow Use of Plastic Section Properties in Lower Downcomer Braces Analysis RS-23-006, Supplemental Information Regarding License Amendment Request Relocation of Pressure and Temperature Limit Curves to the Pressure and Temperature Limits Report2023-01-10010 January 2023 Supplemental Information Regarding License Amendment Request Relocation of Pressure and Temperature Limit Curves to the Pressure and Temperature Limits Report RS-22-126, Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2022-11-30030 November 2022 Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI RS-22-109, Response to Request for Additional Information License Amendments Related to Fuel Storage2022-10-12012 October 2022 Response to Request for Additional Information License Amendments Related to Fuel Storage RS-22-092, Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration2022-10-0303 October 2022 Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration RS-22-093, Advisement of Leadership Changes for Constellation Energy Generation, LLC and Submittal of Updated Standard Practice Procedures Plans2022-08-18018 August 2022 Advisement of Leadership Changes for Constellation Energy Generation, LLC and Submittal of Updated Standard Practice Procedures Plans RS-22-083, Response to Request for Additional Information Related to the License Amendment Request to Change New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies, with Proposed Changes to Technical2022-06-17017 June 2022 Response to Request for Additional Information Related to the License Amendment Request to Change New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies, with Proposed Changes to Technical RS-22-051, Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists2022-04-12012 April 2022 Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists RS-22-049, Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellation'S Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for2022-04-0404 April 2022 Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellation'S Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for V RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations RS-22-035, Supplemental Information Regarding Relief Request I4R-13 Relief from Code Examinations for 1B33-F060A and 1B33-F060B Repairs2022-03-0404 March 2022 Supplemental Information Regarding Relief Request I4R-13 Relief from Code Examinations for 1B33-F060A and 1B33-F060B Repairs RS-22-033, Response to Request for Additional Information Regarding Relief Request I4R-13 Relief from Code Examinations for 1B33-F060A and 1B33-F060B Repairs2022-03-0303 March 2022 Response to Request for Additional Information Regarding Relief Request I4R-13 Relief from Code Examinations for 1B33-F060A and 1B33-F060B Repairs RS-22-032, Relief Request I4R-13 Relief from Code Examinations for 1B33-F060A and 1B33-F060B Repairs2022-03-0202 March 2022 Relief Request I4R-13 Relief from Code Examinations for 1B33-F060A and 1B33-F060B Repairs RS-22-027, Constellation, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated2022-02-23023 February 2022 Constellation, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated P RS-22-023, Constellation Energy Generation, LLC, Executed Trust Fund Agreement Amendment and Subordinate Trust Agreement2022-02-23023 February 2022 Constellation Energy Generation, LLC, Executed Trust Fund Agreement Amendment and Subordinate Trust Agreement RS-22-018, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for LaSalle County Station2022-02-22022 February 2022 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for LaSalle County Station RS-22-019, Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists2022-02-16016 February 2022 Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists RS-22-015, Notification of Completion of License Transfer and Request to Continue Processing Pending NRC Actions Previously Requested by Exelon Generation Company, LLC2022-02-0101 February 2022 Notification of Completion of License Transfer and Request to Continue Processing Pending NRC Actions Previously Requested by Exelon Generation Company, LLC RS-22-004, Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2022-01-0404 January 2022 Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RS-21-121, Proposed Changes to Decommissioning Trust Agreements and Master Terms2021-12-15015 December 2021 Proposed Changes to Decommissioning Trust Agreements and Master Terms RS-21-115, Supplemental Information for License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies, with Proposed Changes to Technical Specifications 4.3.1 and 5.6.52021-11-0404 November 2021 Supplemental Information for License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies, with Proposed Changes to Technical Specifications 4.3.1 and 5.6.5 RS-21-109, Request to Withhold Meeting Materials for the Non-Public Meeting Held on September 2, 20212021-10-14014 October 2021 Request to Withhold Meeting Materials for the Non-Public Meeting Held on September 2, 2021 RS-21-091, Implementation of Insider Threat Program Requirements Associated with the Voluntary Security Clearance Program and Advisement of Leadership Changes2021-09-13013 September 2021 Implementation of Insider Threat Program Requirements Associated with the Voluntary Security Clearance Program and Advisement of Leadership Changes RS-21-078, Response to Request for Additional Information for Application to Revise Technical Specification to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements, and TSTF-583-T, TSTF-582 Diesel2021-08-19019 August 2021 Response to Request for Additional Information for Application to Revise Technical Specification to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements, and TSTF-583-T, TSTF-582 Diesel RS-21-085, Response to Request for Additional Information Regarding License Amendment Request to Incorporate Licensing Topical Report NEDE-33885PA, Revision 1, GNF CRDA Application Methodology (EPID-L-2021-LLA-0016)2021-08-17017 August 2021 Response to Request for Additional Information Regarding License Amendment Request to Incorporate Licensing Topical Report NEDE-33885PA, Revision 1, GNF CRDA Application Methodology (EPID-L-2021-LLA-0016) RS-21-070, Proposed Alternative to Utilize Code Case N-8932021-06-30030 June 2021 Proposed Alternative to Utilize Code Case N-893 RS-21-063, Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2021-06-30030 June 2021 Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RS-21-064, License Amendment Request Re New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies - Cover Letter2021-06-30030 June 2021 License Amendment Request Re New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies - Cover Letter RS-21-055, Response to Third Round Request for Additional Information (Rals) for LaSalle License Amendment Request to Adopt Risk Informed Completion Times TSTF- 505, Revision 2, Provide Risk-Informed Extended.2021-05-10010 May 2021 Response to Third Round Request for Additional Information (Rals) for LaSalle License Amendment Request to Adopt Risk Informed Completion Times TSTF- 505, Revision 2, Provide Risk-Informed Extended. RS-21-054, Response to NRC Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations2021-04-29029 April 2021 Response to NRC Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations 2024-06-28 Category:Report MONTHYEARRA24-008, Post-Outage Inservice Inspection (ISI) Summary Report2024-06-20020 June 2024
[Table view]Post-Outage Inservice Inspection (ISI) Summary Report RS-24-014, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2024-02-22022 February 2024 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors ML23181A1522023-06-30030 June 2023 Attachment 2 - LaSalle County Station Units 1 and 2, Pressure and Temperature Limits Report (PTLR) Up to 54 Effective Full-Power Years (Efpy), Revision 3 RS-23-066, Containment Post-Tensioning System Inservice Inspection Basis for Proposed Extension of Examination Interval Technical Report2023-05-0303 May 2023 Containment Post-Tensioning System Inservice Inspection Basis for Proposed Extension of Examination Interval Technical Report RA22-060, Regulatory Commitment Change Summary Report2022-11-30030 November 2022 Regulatory Commitment Change Summary Report ML22332A4552022-11-10010 November 2022 Attachment 7 - BWRVIP-135, Revision 4: BWR Vessel Internals Project Integrated Surveillance Program (ISP) Data Source Book and Plant Evaluations (Non-Proprietary Version) ML22332A4542022-11-10010 November 2022 Attachment 6 - LaSalle County Generating Station Units 1 and 2 Pressure and Temperature Limits Report (PTLR) for 54 Effective Full-Power Years (EFPY) (Non-Proprietary) NMP1L3469, Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits2022-06-30030 June 2022 Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits RS-22-018, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for LaSalle County Station2022-02-22022 February 2022 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for LaSalle County Station RS-21-115, Supplemental Information for License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies, with Proposed Changes to Technical Specifications 4.3.1 and 5.6.52021-11-0404 November 2021 Supplemental Information for License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies, with Proposed Changes to Technical Specifications 4.3.1 and 5.6.5 ML21265A5582021-06-30030 June 2021 Attachment 5: Appendix C, NEI 12-16 Criticality Analysis Checklist RA21-016, Netco Rack Insert 10-year Surveillance Report2021-04-15015 April 2021 Netco Rack Insert 10-year Surveillance Report RS-21-001, Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping2021-01-0404 January 2021 Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping ML20303A1752020-10-23023 October 2020 Proposed Relief Request from Section XI Repair/Replacement Documentation for Bolting Replacement of Pressure Retaining Bolting RS-20-133, Response to Request for Additional Information Re License Amendment Request to Renewed Facility Operating Licenses to Adopt 10 CFR 50.692020-10-16016 October 2020 Response to Request for Additional Information Re License Amendment Request to Renewed Facility Operating Licenses to Adopt 10 CFR 50.69 ML20085F8612020-03-24024 March 2020 Corrected Drawing for One-Line Electric Power Supply for Lasalle Hardened Containment Vent System (HCVS) Final Integrated Plan (FIP) RA20-015, Triennial Chlorine Survey Report2020-03-20020 March 2020 Triennial Chlorine Survey Report RS-20-024, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2020-03-0909 March 2020 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors ML19228A0232019-08-15015 August 2019 Proposed Alternative to Utilize Code Case N-879 RA19-005, Regulatory Commitment Change Summary Report2019-01-14014 January 2019 Regulatory Commitment Change Summary Report RA18-110, Submittal of 2017 Regulatory Commitment Change Summary Report2018-12-27027 December 2018 Submittal of 2017 Regulatory Commitment Change Summary Report RS-18-131, Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions2018-12-14014 December 2018 Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions ML18024A2772018-08-16016 August 2018 Lessons Learned from Us NRC Response to the February 2017 LaSalle County Station Unit 2 High Pressure Core Spray Injection Valve Failure RA17-072, Post Accident Monitoring Report2017-08-0202 August 2017 Post Accident Monitoring Report RA17-069, Post Accident Monitoring Report2017-07-21021 July 2017 Post Accident Monitoring Report RS-17-025, Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 3, Flooding Focused Evaluation Summary Submittal2017-03-0808 March 2017 Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 3, Flooding Focused Evaluation Summary Submittal ML16355A4182017-01-11011 January 2017 Flood Hazard Mitigation Strategies Assessment RA16-092, Regulatory Commitment Change Summary Report2016-12-27027 December 2016 Regulatory Commitment Change Summary Report RS-16-182, Mitigating Strategies Flood Hazard Assessment (Msfha) Submittal2016-10-28028 October 2016 Mitigating Strategies Flood Hazard Assessment (Msfha) Submittal ML16305A2962016-10-27027 October 2016 0000-0163-8881-R0-NP, Revision 0, Exelon Nuclear LaSalle County Generating Station Units 1 & 2 Pool Swell Response. ML16167A5022016-09-0606 September 2016 UFSAR, Rev 22, Chap 09 Figures Part 12 of 14 - Redacted ML16167A4462016-09-0606 September 2016 MF7633 and MF7634, UFSAR, Las Fpr Rev._Redacted RS-16-125, Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident2016-08-31031 August 2016 Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident ML16224A7862016-08-26026 August 2016 Notice of Availability of the Final Plant-Specific Supplement 57 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding LaSalle County Station, Units 1 and 2 (TAC Nos. MF5567 and MF5568) ML16200A1562016-07-18018 July 2016 Report on the Safety Aspects of the License Renewal Application of the LaSalle County Station, Units 1 and 2 RS-15-300, Phase 1 (Updated) and Phase 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident..2015-12-16016 December 2015 Phase 1 (Updated) and Phase 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident.. RA15-075, Transmittal of the 2014 Regulatory Commitment Change Summary Report2015-11-20020 November 2015 Transmittal of the 2014 Regulatory Commitment Change Summary Report ML15107A1542015-04-21021 April 2015 Final Accident Sequence Precursor Analysis for the April 17, 2013, Dual Unit Loss of Offsite Power RS-15-004, County Station Introduction of Lead Use Assemblies2015-01-20020 January 2015 County Station Introduction of Lead Use Assemblies ML14352A1902014-12-18018 December 2014 7491-318563-HAO-1, Rev. 2, LaSalle Requested Documents RS-14-277, Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 12014-09-24024 September 2014 Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1 ML14177A8592014-06-30030 June 2014 Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima DAI-ICHI Nuclear Power Plant Accident ML14176A9612014-06-24024 June 2014 Submittal of Non-Proprietary BWROG Technical Product, BWROGTP-11-006 - ECCS Containment Walkdown Procedure, Rev 1 (January 2011), as Formally Requested During the Public Meeting Held on April 30, 2014 RS-14-054, LaSalle, Unit 1, Supplemental Information Supporting License Amendment Request to Revise Reactor Coolant System (RCS) Pressure and Temperature (Pit) Curves2014-02-26026 February 2014 LaSalle, Unit 1, Supplemental Information Supporting License Amendment Request to Revise Reactor Coolant System (RCS) Pressure and Temperature (Pit) Curves ML14057A5492014-02-26026 February 2014 Supplemental Information Supporting License Amendment Request to Revise Reactor Coolant System (RCS) Pressure and Temperature (Pit) Curves ML14030A2232014-02-21021 February 2014 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) ML14042A3252014-02-19019 February 2014 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for LaSalle County Station, Units 1 and 2, TAC Nos.: MF1121 and MF1122 ML13358A3652013-12-20020 December 2013 Attachment 5: LaSalle County Station, Unit 1, Pressure/Temperature Limits Report ML13344A9822013-12-0909 December 2013 2012 Regulatory Commitment Change Summary Report ML13282A3502013-10-0404 October 2013 Final Report, Assessment of Wind Speeds Over the LaSalle County Station Ultimate Heat Sink. 2024-06-20 Category:Technical MONTHYEARML23181A1522023-06-30030 June 2023
[Table view]Attachment 2 - LaSalle County Station Units 1 and 2, Pressure and Temperature Limits Report (PTLR) Up to 54 Effective Full-Power Years (Efpy), Revision 3 RS-23-066, Containment Post-Tensioning System Inservice Inspection Basis for Proposed Extension of Examination Interval Technical Report2023-05-0303 May 2023 Containment Post-Tensioning System Inservice Inspection Basis for Proposed Extension of Examination Interval Technical Report ML22332A4552022-11-10010 November 2022 Attachment 7 - BWRVIP-135, Revision 4: BWR Vessel Internals Project Integrated Surveillance Program (ISP) Data Source Book and Plant Evaluations (Non-Proprietary Version) ML22332A4542022-11-10010 November 2022 Attachment 6 - LaSalle County Generating Station Units 1 and 2 Pressure and Temperature Limits Report (PTLR) for 54 Effective Full-Power Years (EFPY) (Non-Proprietary) NMP1L3469, Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits2022-06-30030 June 2022 Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits RS-22-018, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for LaSalle County Station2022-02-22022 February 2022 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for LaSalle County Station RS-21-115, Supplemental Information for License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies, with Proposed Changes to Technical Specifications 4.3.1 and 5.6.52021-11-0404 November 2021 Supplemental Information for License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies, with Proposed Changes to Technical Specifications 4.3.1 and 5.6.5 RS-21-001, Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping2021-01-0404 January 2021 Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping RS-20-133, Response to Request for Additional Information Re License Amendment Request to Renewed Facility Operating Licenses to Adopt 10 CFR 50.692020-10-16016 October 2020 Response to Request for Additional Information Re License Amendment Request to Renewed Facility Operating Licenses to Adopt 10 CFR 50.69 ML20085F8612020-03-24024 March 2020 Corrected Drawing for One-Line Electric Power Supply for Lasalle Hardened Containment Vent System (HCVS) Final Integrated Plan (FIP) ML19228A0232019-08-15015 August 2019 Proposed Alternative to Utilize Code Case N-879 RS-18-131, Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions2018-12-14014 December 2018 Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions ML16167A4462016-09-0606 September 2016 MF7633 and MF7634, UFSAR, Las Fpr Rev._Redacted ML16167A5022016-09-0606 September 2016 UFSAR, Rev 22, Chap 09 Figures Part 12 of 14 - Redacted ML15107A1542015-04-21021 April 2015 Final Accident Sequence Precursor Analysis for the April 17, 2013, Dual Unit Loss of Offsite Power RS-15-004, County Station Introduction of Lead Use Assemblies2015-01-20020 January 2015 County Station Introduction of Lead Use Assemblies RS-14-277, Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 12014-09-24024 September 2014 Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1 ML14176A9612014-06-24024 June 2014 Submittal of Non-Proprietary BWROG Technical Product, BWROGTP-11-006 - ECCS Containment Walkdown Procedure, Rev 1 (January 2011), as Formally Requested During the Public Meeting Held on April 30, 2014 ML14057A5492014-02-26026 February 2014 Supplemental Information Supporting License Amendment Request to Revise Reactor Coolant System (RCS) Pressure and Temperature (Pit) Curves RS-14-054, LaSalle, Unit 1, Supplemental Information Supporting License Amendment Request to Revise Reactor Coolant System (RCS) Pressure and Temperature (Pit) Curves2014-02-26026 February 2014 LaSalle, Unit 1, Supplemental Information Supporting License Amendment Request to Revise Reactor Coolant System (RCS) Pressure and Temperature (Pit) Curves ML14030A2232014-02-21021 February 2014 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) ML14042A3252014-02-19019 February 2014 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for LaSalle County Station, Units 1 and 2, TAC Nos.: MF1121 and MF1122 ML13358A3652013-12-20020 December 2013 Attachment 5: LaSalle County Station, Unit 1, Pressure/Temperature Limits Report ML13282A3502013-10-0404 October 2013 Final Report, Assessment of Wind Speeds Over the LaSalle County Station Ultimate Heat Sink. ML13192A4462013-05-21021 May 2013 Enclosure 1, Updated Transmittal # 1 (Annex a) Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the LaSalle County Station, Unit 2, Report No. R ML13199A0412013-01-17017 January 2013 Attachment 11 - Netco Report NET-300054-01, Revision 0, Inspection and Testing of Fast Start Surveillance Coupons F22-F1 1 from the LaSalle County Unit 2 Station RS-11-067, Response to Request for Additional Information Regarding Unit 2 Spent Fuel Pool Storage Racks2011-04-18018 April 2011 Response to Request for Additional Information Regarding Unit 2 Spent Fuel Pool Storage Racks RS-10-007, 375636, Revision 0, Dewatered Resin Flammable Gas Generation Assessment, Appendix B2009-09-28028 September 2009 375636, Revision 0, Dewatered Resin Flammable Gas Generation Assessment, Appendix B RS-10-007, LaSalle Station, Units 1 and 2 - Irsf LAR Support Technical Report Supporting Engineering Change (EC) No. 375636 Type: Document Change Request (DCR) Subtype: Dsgn2009-09-28028 September 2009 LaSalle Station, Units 1 and 2 - Irsf LAR Support Technical Report Supporting Engineering Change (EC) No. 375636 Type: Document Change Request (DCR) Subtype: Dsgn ML1000703012009-09-28028 September 2009 Irsf LAR Support Technical Report Supporting Engineering Change (EC) No. 375636 Type: Document Change Request (DCR) Subtype: Dsgn ML13199A0402009-09-10010 September 2009 Attachment 10 - Netco Report NET-332-01, Revision 1, Inspection and Testing of Boral and Fast Start Surveillance Coupons from the LaSalle County Units 1 & 2 Stations RS-09-133, Attachment 6, LaSalle, Unit 2, Nuclear Power Station Spent Fuel Storage Pool Criticality Safety Analysis with Neutron Absorbing Inserts and Without Boraflex2009-08-31031 August 2009 Attachment 6, LaSalle, Unit 2, Nuclear Power Station Spent Fuel Storage Pool Criticality Safety Analysis with Neutron Absorbing Inserts and Without Boraflex RS-09-100, Additional Information Supporting the Request for a License Amendment to Revise Local Power Range Monitor Calibration Frequency2009-07-27027 July 2009 Additional Information Supporting the Request for a License Amendment to Revise Local Power Range Monitor Calibration Frequency RA09-012, Evaluation of the Water Spray System in the Overlab Area Fire Zone 4F32009-03-10010 March 2009 Evaluation of the Water Spray System in the Overlab Area Fire Zone 4F3 RS-09-037, Supplemental Information Concerning License Amendment to Allow Ganged Rod Drive Capability of the Rod Control Management System2009-03-0505 March 2009 Supplemental Information Concerning License Amendment to Allow Ganged Rod Drive Capability of the Rod Control Management System ML0900803852008-12-31031 December 2008 ANP-2789(NP), Revision 0, Atrium Tm 10XM Lead Test Assemblies for LaSalle Unit 2. RS-09-133, Attachment 5, Northeast Technology Corp. Report No. NET-259-03, Material Qualification of Alcan Composite for Spent Fuel Storage, Revision 52008-08-31031 August 2008 Attachment 5, Northeast Technology Corp. Report No. NET-259-03, Material Qualification of Alcan Composite for Spent Fuel Storage, Revision 5 ML0928102802008-08-31031 August 2008 Attachment 5, Northeast Technology Corp. Report No. NET-259-03, Material Qualification of Alcan Composite for Spent Fuel Storage, Revision 5 ML0821900132008-08-0707 August 2008 Monthly Operating Reports Second Quarter 2008 RS-08-091, Request for a License Amendment to Revise Local Power Range Monitor Calibration Frequency2008-07-25025 July 2008 Request for a License Amendment to Revise Local Power Range Monitor Calibration Frequency RS-08-063, Supplemental Information Concerning License Amendment to Allow Ganged Rod Drive Capability of the Rod Control Management System2008-05-13013 May 2008 Supplemental Information Concerning License Amendment to Allow Ganged Rod Drive Capability of the Rod Control Management System ML0634601312006-12-0707 December 2006 Attachment 11, Exelon/Amergen Response to the Request for Additional Information, EP-EAL-0611, Criteria for Choosing Containment Radiation Monitor Reading Indicative Loss of the RCS Barrier ML1011303712004-05-31031 May 2004 GE-NE-0000-0003-5526-02R1a, Rev, 1, Pressure-Temperature Curves for Exelon LaSalle Unit 1. ML0419501972004-05-31031 May 2004 GE-NE-0000-0003-5526-02R1a, Pressure-Temperature Curves for LaSalle Unit 1 and GE-NE-0000-0003-5526-01R1a, Pressure-Temperature Curves for LaSalle Unit 2, Non-proprietary ML0411400332004-03-0909 March 2004 Plant Specific ECCS Evaluation Changes - 10 CFR 50.46 Report ML0802902312004-02-12012 February 2004 Westinghouse Technical Bulletin: Information Regarding Recent Crossflow Ultrasonic Flow Measurement System Performance Observations, TB-04-4 RS-03-236, Transmittal of Non-Proprietary Version of Information Supporting Request for Amendment to Technical Specifications Section 5.6.5, Core Operating Limiits Report (Colr).2003-12-17017 December 2003 Transmittal of Non-Proprietary Version of Information Supporting Request for Amendment to Technical Specifications Section 5.6.5, Core Operating Limiits Report (Colr). RS-03-123, Response to Request for Additional Information to Support Request for Amendment to TS Table 3.3.5.1-1, Emergency Core Cooling System Instrumentation2003-06-26026 June 2003 Response to Request for Additional Information to Support Request for Amendment to TS Table 3.3.5.1-1, Emergency Core Cooling System Instrumentation ML0317703462003-06-17017 June 2003 Additional Information Regarding Notice of Proposed Amendments to Trust Agreement to Implement Assignment of Decommissioning Trust Funds for Exelon Generation Company, LLC RS-03-010, Supporting Documentation for Amendment to Technical Specifications Section 3.4.11, RCS Pressure and Temperature (P/T) Limits. Attachment 4, Table of Contents - Appendix F2003-01-31031 January 2003 Supporting Documentation for Amendment to Technical Specifications Section 3.4.11, RCS Pressure and Temperature (P/T) Limits. Attachment 4, Table of Contents - Appendix F 2023-06-30 |