RS-09-133, Attachment 5, Northeast Technology Corp. Report No. NET-259-03, Material Qualification of Alcan Composite for Spent Fuel Storage, Revision 5
ML092810280 | |
Person / Time | |
---|---|
Site: | LaSalle |
Issue date: | 08/31/2008 |
From: | Northeast Technology Corp |
To: | Office of Nuclear Reactor Regulation |
References | |
RS-09-133 NET-259-03, Rev. 5 | |
Download: ML092810280 (76) | |
Text
ATTACHMENT 5 Northeast Technology Corp. Report No. NET-259-03,"Material Qualification of Alcan Composite for Spent Fuel Storage," Revision 5 NET-259-03 MATERIAL QUALIFICATION OF ALCAN COMPOSITE FOR SPENT FUEL STORAGE Prepared by: Northeast Technology Corp.108 N. Front Street Kingston, NY 12401 August 2008 Rev. Date Prepared by: Reviewed by: Approved (QA): 5 7/Ap/of K I I______*1 t 4 4 NET-259-03 Rev 5 Table of Contents 1.0 Introduction and S um m ary .........................................................................
1-1 2.0 Description of the NETCO-SNAP-IN and Installation Tooling ...................
2-1 3.0 Manufacturing the NETCO-SNAP-IN Neutron Absorber Insert ................
3-1 3 .1 B illet P ro d uctio n ..................................................................................
3-1 3.2 NETCO-SNAP-IN Production
............................................................
3-2 3.3 Applicable Codes, Standards and Regulatory Guidance ....................
3-2 3.4 Q uality A ssurance ...............................................................................
3-3 4.0 Engineering Evolution of the Alcan Composite
..........................................
4-1 4.1 Comparison of the Alcan Composite with BORAL T M ...............
............ 4-1 4.2 In-Service Performance of Aluminum Matrix Neutron A bso rbe r M ate rial .................................
..............................................
4-9 5 4.3 N ET C O C redentials
..........................................................................
4-15 5.0 Accelerated Corrosion Testing ...................................................................
5-1 5 .1 T est D escriptio n ..................................................................................
5-1 5.2 Test Matrices and Coupon Description
...............................................
5-1 5.3 W ater C hem istry .................................................................................
5-4 5.4 Corrosion Test Results .....................................
5-8 5.5 Discussion of Test Results and Conclusions
....................................
5-30 6.0 Fast Start Coupon Program Description
....................................................
6-1 7.0 Long Term Surveillance Program .....................
- .........................................
7-1 7.1 Tree and Coupon Description
.............................................................
7-1 7.2 Coupon Inspection and Testing ..........................................................
7-1 7.3 Frequency for Coupon Inspection
.......................................................
7-3 Appendix:
Determination of Equivalent In-Service Time for Rio Tinto Alcan 4 W1 100 N Series Neutron Absorber Alloy Based on Accelerated Corrosion Test Conditions NET-259-03 Rev 5 List of Tables 3-1 Insert Quality Assurance Testing Summary ..............................................
3-5 4-1 Comparison of Aluminum Alloy Matrices ..................................................
4-2 4-2 Comparison of Boron Carbide ..................................................................
4-3 4-3 Room Temperature Mechanical Properties of BORAL T M and the A lcan C om posite .......................................................................................
4-5 5 4-4 Partial Listing of Research and Test Reactors Where BORAL T M Has Been Used ........................................................................
4-9 4-5 Partial List of LWRs Where BORAL T M Has Been Used in Spent Fuel Storage R acks ......................................................................
4-10 4 4-6 Partial List of LWRs Where BORAL T M Has Been Used in D ry S to rage C asks ..................................................................................
4 -13 5-1 Coupon Test Matrix for Accelerated Corrosion Testing ............................
5-2 5-2 Number and Type of Coupons per BathTested After 2000 and 6 0 0 0 H o u rs ...............................................................................................
5 -2 5-3 Number and Type of Coupons per BathTested After 4000 and 8 0 0 0 H o u rs ...............................................................................................
5 -3 5-4 Water Specification for Corrosion Baths ...................................................
5-5 5-5 Summary of Coupon Thickness Changes by Coupon Type ...................
5-20 5-6 Summary of Coupon Weight Changes by Coupon Type ........................
5-20 4 5-7 Average Corrosion Rates ........................................................................
5-30 5-8 Equivalent Exposure Time ......................................................................
5-30 6-1 Pre and Post Test Coupon Characterization
.............................................
6-3 7-1 Long Term Surveillance Coupons .............................................................
7-1 7-2 Long Term Surveillance General Coupon Characterization
......................
7-2 7-3 Long Term Surveillance Bend and Galvanic Coupon Characterization
.... 7-2 7-4 Frequency for Coupon Testing .................................................................
7-3 ii NET-259-03 Rev 5 List of Figures 2-1 NETCO-SNAP-IN Insert Installed in a Spent Fuel Storage Rack .........
2-2 2-2 N ETC O -SNA P-IN Insert .......................................................................
2-3 2-3 Installation Tool ......................................
2-5 4-1 Comparison of Manufacturing Processes
..............................................
4-4 4-2 M icro Photograph of BO RAL T M ....................................
........................... 4-5 5 4-3 Neutron Attenuation Comparison:
BORALTM vs. Alcan Aluminum M atrix A bsorber ......................................................................................
4-8 4 5-1 pH versus Time: BWR Accelerated Corrosion Test ..............................
5-6 5-2 Water Conductivity versus Time: BWR Accelerated Corrosion Test ..... 5-6 5-3 pH versus Time: PWR Accelerated Corrosion Test ..............................
5-7 5-4 Water Conductivity versus Time: PWR Accelerated Corrosion Test ..... 5-7 5-5 Comparison of Post-Test Coupon Appearance with Archive Material: 16 vol % Boron Carbide Loading after 4000 Hours ..............................
5-11 5-6 Comparison of Post-Test Coupon Appearance with Archive Material: 16 vol % Boron Carbide Loading after 8000 Hours ..............................
5-11 5-7 Comparison of Post-Test Coupon Appearance with Archive Material: 25 vol % Boron Carbide Loading after 4000 Hours ..............................
5-12 4 5-8 Comparison of Post-Test Coupon Appearance with Archive Material: 25 vol % Boron Carbide Loading after 8000 Hours ..............................
5-12 5-9 Comparison of Post-Test Coupon Appearance with Archive Material: 16 vol % Boron Carbide Loading at 8X Magnification after 4 000 H o urs ..................................................................................
5-13 5-10 Comparison of Post-Test Coupon Appearance with Archive Material: 16 vol % Boron Carbide Loading at 8X Magnification afte r 8000 H o urs ..................................................................................
5-13 5-11 Comparison of Post-Test Coupon Appearance with Archive Material: 25 vol % Boron Carbide Loading at 8X Magnification afte r 4 000 H o urs ..................................................................................
5-14 5-12 Comparison of Post-Test Coupon Appearance with Archive Material: 25 vol % Boron Carbide Loading at 8X Magnification after 8000 H o urs ..................................................................................
5-14 5-13 Photomicrograph of 16 vol % B 4 C Composite As-Fabricated (45X) ..... 5-15 5-14 Photomicrograph of 25 vol % B 4 C Composite As-Fabricated (45X) ..... 5-15 iii NET-259-03 Rev 5 List of Figures (con't.)5-15 Photomicrograph of 16 vol % B 4 C Composite after 8000 Hours in D em ineralized W ater (45X ) ..............................................................
5-16 5-16 Photomicrograph of 16 vol % B 4 C Composite after 8000 Hours in B oric A cid (4 5X ) ...............................................................................
5-16 5-17 Photomicrograph of 25 vol % B 4 C Composite after 8000 Hours in Dem ineralized W ater (45X) ..............................................................
5-17 5-18 Photomicrograph of 25 vol % B 4 C Composite after 8000 Hours in B o ric A cid (4 5X ) ...............................................................................
5-17 5-19 BWR Thickness Change (Pre-Test vs. Post-Test)
...............................
5-22 5-20 PWR Thickness Change (Pre-Test vs. Post-Test)
...............................
5-22 5-21 BWR Weight Change (Pre-Test vs. Post-Test)
....................................
5-23 5-22 PWR Weight Change (Pre-Test vs. Post-Test)
....................................
5-23 5-23 BWR Coupon Weight Change versus Time: 4 G alvanic Couple C oupons ...................................................................
5-24 5-24 PWR Coupon Weight Change versus Time: G alvanic C ouple C oupons ...................................................................
5-24 5-25 BWR Thickness Change (Pre-Test vs. Post-Test)
After Acid Cleaning:
General and Bend Coupons ...............................
5-25 5-26 PWR Thickness Change (Pre-Test vs. Post-Test)
After Acid Cleaning:
General and Bend Coupons ...............................
5-25 5-27 BWR Galvanic Coupons After Acid Cleaning:
Coupon T hickness C hange ...............................................................................
5-26 5-28 PWR Galvanic Coupons After Acid Cleaning:
Coupon T hickness C hange ...............................................................................
5-26 5-29 BWR Coupon Weight Change (Pre-Test vs. Post-Test)
After Acid Cleaning:
General and Bend Coupons Only ........................
5-27 5-30 PWR Coupon Weight Change (Pre-Test vs. Post-Test)
After Acid Cleaning:
General and Bend Coupons Only ........................
5-27 5-31 BWR Galvanic Coupon Weight Change versus Time ..........................
5-28 5-32 PWR Galvanic Coupon Weight Change versus Time ..........................
5-28 iv NET-259-03 Rev 5 List of Figures (con't.)5-33 BWR Coupon Areal Density Change versus Time ...............................
5-29 1 4 5-34 PWR Coupon Areal Density Change versus Time ...............................
5-29 6-1 Fast Start Surveillance Coupon ..............................................................
6-2 6-2 Fast Start Coupons String .....................................................................
6-2 v NET-259-03 Rev 5 1.0 Introduction and Summary The purpose of this topical report is to demonstrate that aluminum/B 4 C sheet produced from DC (direct chill) cast rolling billets supplied by Rio Tinto Alcan Inc. is a suitable 3 material for use as a neutron absorber in spent nuclear fuel storage applications and in particular it is a suitable material from which to fabricate NETCO-SNAP-IN neutron absorber inserts. The NETCO-SNAP-INO neutron absorber insert is installed in existing spent fuel storage racks to restore the reactivity hold-down capability of racks with degraded Boraflex.
Once installed, these neutron absorber inserts become permanently affixed to the storage racks.The suitability of Rio Tinto Alcan Inc. material as demonstrated herein is based upon:* detailed comparison with highly similar material with a successful record of industry-wide, in-service performance" accelerated corrosion testing in simulated BWR and PWR spent fuel pool 4 environments
- evaluating and testing of mechanical properties to verify acceptability of installed insert retention force* measurement of B 1 0 areal density to confirm satisfactory neutron absorption capability
- short term and long term in-situ coupon surveillance programs.These evaluations are detailed in the various sections of this report.The Alcan material is supplied as 6x6 inch rectangular DC cast rolling billets that are hot rolled to final gage. The material is designated as aluminum boron carbide composite W11 OON.XYB where XY is the boron carbide content which can range from 16 to 30 1-1 NET-259-03 Rev 5 volume percent. The reinforcing phase of the composite is boron carbide powder containing at least 76 w/o boron and with an average particle size of 7.5 +/- 2 pm (D 5 0).As stated above, one particular application of the W1 100N.XYB composite in spent fuel 4 pools is the NETCO-SNAP-IN neutron absorber insert. The NETCO-SNAP-IN is proprietary to NETCO and is protected by U.S. Patent No. 6,741,669 B2.[1-1] The first use of NETCO-SNAP-IN absorber inserts will be at Exelon's LaSalle Unit 2 Station.Other applications of the W1 100N.XYB composite include newly fabricated spent fuel storage racks and dry spent fuel storage and transportation casks. With respect to the latter use, this material has been used in dry storage/transportation
'in the U.S. and extensively in Europe.Recent guidance has been published for the qualification and acceptance of new boron based metallic neutron absorbers for storage and transportation casks. [1-2] Using this document as a guide, the qualification process described in this report consists of the following elements:* Review of the composition and manufacturing process of the Wi 1 ON.XYB composite and a detailed comparison with the composition and manufacturing process for BORALTM, a neutron absorber material that has been successfully used extensively worldwide for spent nuclear fuel storage racks for the last 40 years.* An accelerated corrosion program has been completed in both demineralized water and boric acid (2500 ppm as boron). The program ran for one year in 5 duration.
Interim and final results are reported.* A fast start surveillance coupon program has been initiated (March 08) at LaSalle Unit 2 to provide in-service performance data on the W1 100N.16B composite in the actual proposed service environment.
This will provide performance data that will always lead the installed NETCO-SNAP-IN inserts in both time of exposure and absorbed gamma dose. The fast start coupon program consists of a string of 24 coupons connected by stainless links. The coupons have been precharacterized with respect to dimensions, dry weight, density and boron-10 1-2 NET-259-03 Rev 5 areal density. Periodically coupons will be removed from the string and sent to a qualified laboratory for post exposure testing and inspection.
A long term surveillance assembly will be placed in the LaSalle pool prior to the installation of the first NETCO-SNAP-IN inserts. These coupons will differ from the "Fast-Start" and, in particular, will be composed of 17 vol-% B 4 C instead of 16 vol-% B 4 C material.
This modification is due to a manufacturing revision of the 5 NETCO-SNAP-IN inserts intended to ensure compliance with minimum areal density requirements.
The tree will hold the following types of coupons:-unclad Alcan W1100N.17B composite coupons-W1100N.17B composite coupons with 304L stainless steel, In-718 and Zircaloy samples-W1100N.17B composite bend coupons Periodically coupons will be removed from the assembly and sent to a qualified laboratory for testing and inspection.
The following sections of this report describe:-NETCO-SNAP-IN and Installation Tooling-Manufacturing process and quality control used for NETCO-SNAP-IN inserts-Composition and physical properties of the W1 100N.XYB composite-Description of accelerated corrosion testing and interim results-Comparative evaluation of W1100N.XYB composite and BORAL T M Anticipated performance of W11OON.XYB in spent fuel pools-Detailed description of the "fast start" coupon surveillance program-Detailed description of long term coupon surveillance program-Conclusions References Section 1 1-1. Lindquist, K. 0., U.S. Patent No. 6,741,669 B2, "Neutron Absorber Systems and Method for Absorbing Neutrons," May 25, 2004.1-3 NET-259-03 Rev 5 1-2.ASTM C 1671-07, "Standard Practice for Qualification and Acceptance of Boron Based Metallic Neutron Absorbers for Nuclear Criticality Control for Dry Cask Storage Systems and Transportation Packaging." 1-4 NET-259-03 Rev 5 2.0 Description of the NETCO-SNAP-IN and Installation Tooling Neutron absorber materials are incorporated in spent fuel storage racks to permit the safe storage of LWR fuel assemblies in close proximity to each other. One or two panels of a neutron absorber material are placed between each face of every fuel assembly in order to maintain the stored fuel in a sufficiently sub-critical condition.
One neutron absorber material used for this purpose, Boraflex, has been observed to experience in service degradation well in advance of its design service life. As degradation proceeds, the matrix intended to retain the neutron absorber (boron carbide) dissolves and the boron carbide slumps to the bottom of the pool. As this occurs, less and less of the neutron absorber is in place to maintain the fuel in a sub-critical condition.
The NETCO-SNAP-IN insert mitigates the boron carbide loss from Boraflex by inserting a thin chevron-shaped metallic sleeve into the fuel storage cell of the rack.The sleeve is fabricated from an aluminum/boron carbide composite.
When installed, this sleeve, or insert, abuts two adjacent faces of the rack wall. It is intended that an insert be installed in all the storage cells of a given module as shown in Figure 2-1.With each insert installed in the same configuration, every face of all fuel assemblies will have neutron absorber material between it and one face of the adjacent fuel assemblies.
Since the inserts are fabricated of a neutron absorbing material, replacement of the initial reactivity hold-down system is effectively achieved.2-1 NET-259-03 Rev 5 I NETCO'-9NAP-ItJ N, i In sbrt, Figure 2-1 NETCO-SNAP-IN Insert Installed in a Spent Fuel Storage Rack Figure 2-2 shows a typical NETCO-SNAP-IN.
The insert has a length equivalent to the length of the fuel storage cell and the lower end is tapered to facilitate insertion into the fuel storage cell. The chevron is formed with a central bend angle along its length greater than 900. The width of each wing of the chevron is slightly less than the minimum inside dimension of the fuel storage cell. Each edge of the wing is roll formed and it is this feature that accommodates cell to cell variations in inside dimensions.
Near the top of the NETCO-SNAP-IN is a hole in each wing that engages the installation tool.It is noted that the chevrons are formed with a greater than 90' bend angle and this causes compression of the insert as it is "pushed" into the rack cell and assumes the 2-2 NET-259-03 Rev 5 900 angle between adjacent rack cell walls. The insert is designed to become an integral part of the fuel rack once it has been installed.
This is achieved through the elastic deformation of the insert bearing against the rack cell wall and the associated friction force. The force exerted due to this deformation is predicted by the effective spring constant of the insert, which is described in detail elsewhere.
The force between the insert wings and the rack cell walls in conjunction with the static friction between these surfaces serves to retain the NETCO-SNAP-IN and make it a permanent part of the rack once it is installed.
01 5 Figure 2-2 NETCO-SNAP-IN Insert The installation tool with a NETCO-SNAP-IN engaged is shown in Figure 2-3. At the top of the tool is a bail that replicates the bail on a BWR fuel assembly.
As such the installation tool can be engaged with a fuel grapple or with the refueling mast. The bail is attached to an anvil assembly that provides a bearing surface on the top edge of the insert. Immediately below the anvil assembly is the head assembly.
The head assembly contains two spring loaded cylinders, that engage the insert while it is being moved to the storage cell into which it is destined for installation.
When, during installation, the cylinders come into contact with the rack cell wall they retract, thus allowing full insertion of the insert. The curvature of the upper edge of each cylinder is so configured that when the insert is fully installed, upward movement of the tool allows the cylinder to clear the engagement holes in the insert, leaving the insert fully seated in the rack cell.2-3 NET-259-03 Rev 5 Again referring to Figure 2-3, a counterweight is suspended from three rods below the head assembly.
In addition to partially providing downward insertion force, the counterweight, which contributes to insert stability during installation, lowers the center of gravity of the tool. The insertion tool is constructed entirely of stainless steel and weighs less than 1290 lbs. 3 2-4 NET-259-03 Rev 5 Bail 71 Anvil/ Assembly Head Assembly Cylinder NETCO-SNAP-INCounterweight Figure 2-3 Installation Tool 2-5 NET-259-03 Rev 5 3.0 Manufacturing the NETCO-SNAP-IN Neutron Absorber Insert 3.1 Billet Production There are two basic methods for producing aluminum/boron carbide metal matrix composites:
powder metallurgy and liquid metal mixing. In the case of powdered metallurgy, atomized metal powder is blended with boron carbide particles, compacted and sintered to form a billet for further processing.
The billet is generally extruded to produce rectangular preforms for rolling to final gage. This method has proved to be expensive due to the high cost of atomized metal powders and time consuming processing steps. In addition, wear products from the extrusion die on the surface of the preform need to be removed by cleaning or machining so as not to result in galvanic corrosion in wet storage applications.[
3-1] Furthermore, and depending on the process used to produce the billets, the final rolled sheet may have limited ductility making the sheet difficult to form by bending. [3-2]Alcan has developed a liquid mixing process for producing aluminum/boron carbide composites that use mechanical stirring to mix the powdered B 4 C in the molten aluminum.
As this mixing process is conducted at temperatures well over the melting point of aluminum, significant aluminum and boron carbide interactions can occur that can result in degraded mechanical and physical properties.
[3-3] A significant physical property effect can be the agglomeration of B 4 C particles resulting in a non-uniform boron distribution in the composite.
Alcan has found that by adding small amounts of Ti (< 2.5%) to the molten aluminum, the B 4 C particles become stable in the molten aluminum, eliminating particle clusters, and a uniform blend is achieved.
It is thought that a Ti rich zone forms around each boron carbide particle, preventing AI/B 4 C interactions.
The molten aluminum/boron carbide blend is direct chill cast into 6"x6" rectangular billets. The length of the billets is determined by the size and gage of the final rolled 3-1 NET-259-03 Rev 5 product. The rectangular billets can be rolled directly without an intermediate extrusion step and the potential problems and cost associated with extrusion.
3.2 NETCO-SNAP-IN Production The Alcan billets are heated to -950°F and hot rolled to final gage. After one transverse rolling the billet is rotated 900 and reduced to final gage in 33 passes in the rolling mill. The rolled sheet is trimmed on a shear to final blank size.Once the blanks have been produced, the final fabrication steps required to produce the finished NETCO-SNAP-IN inserts are as follow. The two long edges are trimmed on a shear to provide a tapered lead-in at the bottom of the inserts to facilitate installation.
The inserts are then formed on a press brake to an angle somewhat larger than 900 and the two remaining long edges roll formed. The holes that engage the installation tool can be formed by stamping or water jet cutting.3.3 Applicable Codes, Standards and Regulatory Guidance The following codes, standards and practices are used as applicable for the design and manufacture of the NETCO-SNAP-IN inserts." ANSI.ANS 8.1 -Nuclear Criticality Safety in Operations with Fissionable Materials Outside Reactors." ANSI/ANS 8.12 -Nuclear Criticality Control and Safety of Plutonium
-Uranium Fuel Mixtures Outside Reactor.* ANSI/ANS 8.17 -Criticality Safety Criteria for the Handling, Storage, and Transportation of LWR Fuel Outside Reactors.* ANSI/ANS 57.2 -Design Requirements for Light Water Reactor Spent Fuel Storage Facilities at Nuclear Power Plants.* ANSI N45.2.1 -Cleaning of Fluid Systems and Associated Components during Construction Phase of Nuclear Power Plants -1973 (R.G. 1.37).* ANSI N45.2.2 -Packaging, Shipping, Receiving, Storage and Handling of Items for Nuclear Power Plants -1972 (R.G. 1.38).3-2 NET-259-03 Rev 5* American Society for Nondestructive Testing SNT-TC-1A, June 1980, Recommended Practice for Personnel Qualifications and Certification in Nondestructive Testing.* ASTM C750 -Standard Specification for Nuclear-Grade Boron Carbide Powder.* ASTM C992 -Standard Specification for Boron-Based Neutron Absorbing Material Systems for Use in Nuclear Spent Fuel Storage Racks.* ASME NQA-1 -Quality Assurance Program Requirements for Nuclear Facilities.
- ASME NQA-2 -Quality Assurance Requirements for Nuclear Power Plants.* General Design Criterion 62, Prevention of Criticality in Fuel Storage and Handling.* Memorandum from L. Kopp, SRE, to Timothy Collins, Chief, Reactor Systems Branch, Division of Systems Safety and Analysis, "Guidance on the Regulatory Requirements for Criticality Safety Analysis of Fuel Storage at Light Water Reactor Power Plants," August 19, 1988.* "OT Position for Review and Acceptance of Spent Fuel Storage and Handling Applications," dated April 14, 1978, and the modifications to this document of January 18, 1979.* 10CFR21 -Reporting of Defects and Non-compliance.
- 1OCFR50 Appendix B -Quality Assurance Criteria for Nuclear Power Plants and Fuel Reprocessing Plants.* 10CFR50.68
-Criticality Accident Requirements.
- USNRC Standard Review Plan, NUREG-0800, Section 9.1.1, New Fuel Storage and Section 9.1.2, Spent Fuel Storage.* USNRC Regulatory Guide 1.13, Spent Fuel Storage Facility Design Basis, Rev.2, December 1981.3.4 Quality Assurance The NETCO-SNAP-INs are designed and fabricated under control and surveillance of NETCO's Quality Assurance Program[3-4 1 that conforms to the requirements of 10CFR50 Appendix B. Since the NETCO-SNAP-INs are used for reactivity control of fuel assemblies stored in close proximity, they are classified as nuclear Safety Related (SR).3-3 NET-259-03 Rev 5 As such, and as required by NETCO's Quality Assurance Program[3 4], they are designed and fabricated to preclude the use of any material or manufacturing process that deviates from a rigorous set of specifications established by the NETCO design team. Process controls for materials and fabrication are established to preclude the incidence of errors and inspection steps are implemented to ensure that all critical attributes, as identified by the design team, for the feed material and rolled sheet are met in the final product.The raw materials including AA1 100, B 4 C and Ti used to make the cast billets are obtained by Rio Tinto Alcan from qualified suppliers.
The material certifications supplied with the feed material are independently confirmed.
An independent mass spectroscopic measurement of boron-10 fraction is performed on each lot of boron carbide powder used. Each cast of B 4 C and aluminum is chemically analyzed to assure that the composition conforms to the design specification for weight fraction of boron, Al and Ti. Permanent records of these analyses are retained in NETCO's quality assurance files. Each completed NETCO-SNAP-IN has a unique identifying number etched along the inside upper surface and this number is fully traceable to the billet, cast and feed material lots.For these purposes, coupons are cut from each rolled insert blank, which is of sufficient size to manufacture two NETCO-SNAP-INs.
Samples from the coupons are subjected to neutron attenuation testing to verify as-manufactured boron-10 areal density and mechanical testing to assure sufficient ductility to permit forming.Quality Assurance procedures are enforced on the fabrication shop floor that provide all controls necessary to comply with all quality assurance requirements.
One hundred percent final inspection at the shop includes dimensions, formed angle, bend, twist, cleanliness, identifying markings and freedom from imperfections.
A summary table of critical characteristics and qualification tests performed in support of those characteristics is listed below: 3-4 NET-259-03 Rev 5 Table 3-1 Insert Quality Assurance Testing Summary Critical Characteristic Qualification Testing Acceptance Criteria Performed Minimum B-10 Areal Neutron Attenuation
> 0.0087 g B1O/cmA2 Density Testing Material Composition ICP Analysis Boron, Carbon, Titanium and Aluminum within specification limits Mechanical Properties Tensile and Bend Testing Tensile Strength >10 ksi Elongation
> 3%Bend Test to support design specification for insert retention force.5 References Section 3 3-1 ."Qualification of METAMIC for Spent-Fuel Storage Application," EPRI Report No.1003137, Prepared for EPRI by Northeast Technology Corp., Kingston, NY, 10/2001.3-2. "Handbook of Neutron Absorber Materials for Spent Nuclear Fuel Transportation and Storage Applications, 2006 Edition," EPRI Report No. 1003721, Prepared by Northeast Technology Corp., Kingston, NY, 10/2006.3-3.Z. Zhazy, A. Charlette, R. Ghomusheki, X.-G Chen, "Effect of Titanium on Solidification Microstructure of A-16% B 4 C Composites," Light Metals, 2005, Calgary, Alberta, Canada.3-4.Quality Assurance Manual, Rev. 1, Northeast Technology Corp., 2007.3-5 NET-259-03 Rev 5 4.0 Engineering Evaluation of the Alcan Composite The Alcan composite is very similar in composition to another neutron absorber material, BORALTM, that has been used extensively for more than 40 years for both wet and dry storage applications.
The in-service performance of BORALTM has been good.In this section the composition, physical properties and mechanical properties of both materials are compared and the industry experience with the BORALTM neutron absorber reviewed.4.1 Comparison of the Alcan Composite with BORALM Composition Both of these neutron absorber materials utilize AA1 100 as the base alloy for the metal 5 matrix that retains the boron carbide. The compositions of the alloy matrices are compared in Table 4-1. With the exception of the addition of Ti to the Alcan composite, as noted previously, the compositions are almost identical.
In fact, the Alcan requirement for other elements is somewhat more stringent than the BORALTM requirement.
4-1 NET-259-03 Rev 5 Table 4-1 Comparison of Aluminum Alloy Matrices ALCAN ALCAN AA1 100 Metal CAN Composite Composite Property UNS A91100 Metal Matrix Composite Vol 16% 4 C Vol 17% 4 C Temper Material Metal Matrix Typical Typical Spec Material Spec Properties Properties Al 99.00% min 99.00% min 99.00% min 82.7% 82.0%Si & Fe 0.95% max 1.00% max 0.45% max 0.38% 0.39%Cu 0.05-0.20%
0.05-0.20%
0.05-0.20%
0.11% 0.11%Mn 0.05% max 0.05% max 0.05% max < 0.01% < 0.01%Zn 0.10% max 0.10% max 0.10% max <0.01% 0.01%Mg --- 0.05% max < 0.01% <0.01%Ti --- 1.00% -2.50%* 1.85% 2%BC 15.3% 15.9%Other 0.15% total 0.15% max 0.15% total 0.08% 0.08%Elements 0.05% max each 0.05% max each each 11 ksi to 15 ksi 10 ksi Not Specified 17 ksi 17 ksi Tensile 15.5 ksi Yield 3.5 ksi min --- Not Specified 10 ksi 10 ksi Elongation 30% min 0.1 Not Specified 5% -8% 5% -8%5*Titanium is specification added during mixing of the B 4 C and not part of the matrix material 4-2 NET-259-03 Rev 5 The boron carbide specifications are compared in Table 4-2. The Alcan specification is somewhat tighter in terms of allowable impurities and requires a much smaller particle size. With respect to the latter, the smaller particle size results in a more homogeneous absorber, less potential for neutron streaming and a more effective neutron absorber material.Table 4-2 Comparison of Boron Carbide BORAL T M Constituent Alcan Composite 70.0 min Total Boron 76 w/o min 3.0 max Boric Oxide 0.03 % Typ.2.0 max Iron 0.075% Typ.94.0 min Total Boron & 99.6% Typ.9 m Carbon 75 -250 pm Particle Size 17.5 +/- 2 pm Manufacturing Process Physical Form The manufacturing processes for BORALTM and the Alcan composite are compared in Figure 4-1. The manufacture of BORAL T M starts with the complete blending of atomized AA1 100 powder and boron carbide. An AA 100 rectangular box -12 to 15 inches on a side and a few inches high depending on the thickness of the finished product is filled with the blended powder. The walls of the box are -1 inch thick. After a top is welded on the box, the billet is ready for hot rolling to final gage.The production process for the Alcan material differs from the BORALTM process in that the boron carbide powder is blended into molten aluminum and a rectangular billet formed by direct chill casting. Hot rolling is used to produce the final sheet.5 4-3 NET-259-03 Rev 5 BORALTM Blend Fill AA1100 Hot Roll Powdered Box + Billet to Al + B 4 C Weld Lid Final Gage ALCAN COMPOSITE Blend B 4 C Direct Chill Hot Roll Powder into 0 Cast 0 Billet to Molten Rectangular Final Gage Aluminum Billet Figure 4-1: Comparison of Manufacturing Processes In its finished form, BORAL T M consists of 1) a core of uniformly mixed and distributed boron carbide and alloy AA1100 aluminum particles; and 2) an AA1100 surface cladding on both sides of the core, serving as a solid barrier. Figure 4-2 is a micro photograph of the edge of a BORAL T M sample showing the core and clad region.BORALTM has been produced with the core containing anywhere between 35 w% and 65 w% boron carbide. For most cores produced recently, the core contains about 50 w% boron carbide. In addition, the core is not fully dense and contains as much as 5%open and interconnected porosity.The Alcan composite, on the other hand, in its final form is a fully dense homogeneous mixture of fine boron carbide particles embedded in the matrix aluminum alloy. As such 5 it contains no porosity that can allow water intrusion and potential problems associated with internal moisture.4-4 NET-259-03 Rev 5 Figure 4-2: Micro Photograph of BORAL T M Mechanical Properties The mechanical properties of BORALTM and the Alcan composite are compared in Table 4-3.Table 4-3 Room Temperature Mechanical Properties of BORALTM and the Alcan Composite BORAL T M Alcan Composite 10 Tensile Strength, ksi 10 Ultimate Strength, ksi 17 0.1 Elongation, % 7.0 This comparison shows that the tensile properties of the two materials are similar but the Alcan composite has improved ductility.
4-5 NET-259-03 Rev 5 Stress Relaxation During installation, the absorber inserts are compressed from an initial bend angle greater than 900 to the square dimensions of the rack cell interior.
Once installed, the inserts maintain a fixed strain within the rack storage cell that may be susceptible to relaxation over time. An analysis of stress relaxation in aluminum alloys has been performed to establish the expected performance of the inserts in this regard.As shown above, the Rio Tinto Alcan W1 100N.16 B alloy had similar mechanical characteristics to 6061 aluminum alloy based Boral material.
Reference 4-1 details stress relaxation performance of 6060-T6 alloy after 1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br /> at various temperatures.
The data shows approximately 15% stress relaxation after 1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br /> at 1000 C.[4-1]Average bulk pool temperatures within the LaSalle spent fuel pool are approximately 850 F. Stress relaxation at this temperature is expected to be significantly lower than 15% over 1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br />. As an upper limit, however, data for AA1100-H112 series aluminum[4 2 1 was analyzed to estimate total stress relaxation after 20 years of service.The results of that analysis showed that the AA1 100 series aluminum was, based upon extrapolated data, expected to have experienced an approximate stress reduction of 50% over 20 years. Given the reduced elongation of the Rio-Tinto Alcan composite in comparison with AA1 100 series aluminum, this stress relaxation is likely an upper limit for the performance of the Wi 1 ON series material.Typical breakaway withdrawal forces were measured and are typically several hundred pounds. At the 15% relaxation predicted for the 6061-T6 alloy, a reduction in retention force between 45 and 90 lbf after 1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br /> at 1000 C would be expected.
At the limiting case of a 50% reduction in retention force over 20 years, the inserts would still maintain greater than 150 lbf of retention within the cell if there were no other mitigating factors. These values are adequate to maintain the inserts in their configuration during fuel movement operations provided the fuel bundles are qualified for use in those 4-6 NET-259-03 Rev 5 locations (i.e. they fit within the specified dimensions).
However, the following factors would tend to mitigate the stress relaxation effects: 1. Stress relaxation in boron carbide reinforced aluminum will be less than for the pure alloy; 4 2. The formation of an oxide film on the surface of the inserts will increase the stress (by increasing the spacing between the rack wall and the insert)as well as the coefficient of friction between the insert and the cell wall.Neutronic Properties It has been previously noted that the average particle size of boron carbide in BORALTM is 85 microns and individual particles can range up to 250 microns. Particles of these dimensions introduce self shielding effects that can diminish the neutron absorption effectiveness.
NETCO has measured the neutron attenuation characteristics of BORALTM and the Alcan composite, the latter material with average boron carbide particle size of 17.5 microns.Figure 4-3 compares the neutron attenuation characteristics of BORALTM and the Alcan composite.
The neutron attenuation characteristics are measured using a collimated thermal energy neutron beam. A sample of a neutron absorber is placed in this neutron beam and the intensity of the beam incident on the absorber, lI, is measured.
The intensity of the beam transmitted through the material, It, is also measured and the neutron attenuation characteristic, NA, is calculated as: NA = 1 -It/li Figure 4-3 shows that for the same areal density BORALTM absorbs fewer neutrons than the Alcan absorber.
This illustrates the importance of neutron channeling effects in absorbers with relatively large particles when a normal mono-directional neutron beam is incident on the absorber.4-7 NET-259-03 Rev 5 0ý99 0.97 0.94 0.2 091 0.9 089 037.2 , 5 C 0.84 04 0.87 2 0.79 078 0,8 0.74 0,72 03.
Alcan Fit 0.007 0,009 0011 01013 0,015 0,017 0.019 001 0023 0028 0,027 0,029 0.031 0033 005 0.0$? 0.039 0ý041 0.043 0.04 Areal Density, gmIcmA2 Figure 4-3: Neutron Attenuation Comparison:
BORALTM vs. Alcan Aluminum Matrix Absorber 4-8 NET-259-03 Rev 5 4.2 In-Service Performance of Aluminum Matrix Neutron Absorber Material BORAL T M has been used for nuclear applications for almost 45 years starting in 1964 when it was used for reactivity control in the Yankee Rowe spent fuel racks. Nuclear applications include control elements for test reactors, fuel storage racks for spent nuclear fuel and in dry fuel storage and transportation casks. Table 4-4 contains a partial listing of research reactors where BORALTM has been used. Table 4-5 contains a partial list of LWR plants where BORAL T M has been used in spent fuel storage racks.It is noted that LaSalle Unit 2 sister unit currently has some 43,000 lbs of BORAL T M in its racks. Table 4-6 is a partial list of plants where BORAL T M has been used for reactivity control in dry storage casks.For dry storage applications, it is noted that the Alcan composite is now approved for use in the NUHOMS dry storage system as well as the Transnuclear metal cask storage system. The Alcan composite is being used at Peach Bottom, Limerick and St. Lucie as well as in Europe.Table 4-4 Partial Listing of Research and Test Reactors Where BORAL T M Has Been Used Research and Test Reactors AE-6 (USAEC)BORAX-5 (USAEC)Brookhaven Medical Research Reactor JEN-1 (Spain)Philippine Research-1 Rhode Island Reactor Triga Mark II (Italy, Austria, etc.)University of Kansas Reactor University of Wisconsin Reactor Venezuela-1 Washington State University Reactor 4-9 NET-259-03 Rev 5 Table 4-5 Partial List of LWRs Where BORAL T M Has Been Used in Spent Fuel Storage Racks Pool Plant Type I Manufacturer Storage Country II Locations BEAVER VALLEY 1 PWR Holtec 1621 USA BELLEFONTE 1 PWR Westinghouse 1058 USA BRAIDWOOD 1&2 PWR Holtec 2984 USA BROWNS FERRY 1 BWR GE 3471 USA BROWNS FERRY 2 BWR GE 3471 USA BROWNS FERRY 3 BWR GE 3471 USA BRUNSWICK 1 BWR Holtec 1839 USA BYRON 1&2 PWR Holtec 2984 USA CALLAWAY PWR Holtec 1302 USA COMANCHE PEAK 1 PWR Holtec 222 USA COMANCHE PEAK 2 PWR Holtec 219 USA CONN YANKEE PWR Holtec USA COOK 1&2 PWR Holtec 3613 USA COOPER BWR NES USA CRYSTAL RIVER 3 PWR Westinghouse 932 USA DAVIS BESSE 1 PWR Holtec 1624 USA DRESDEN 1 BWR CECO 3537 USA DRESDEN 2 BWR CECO 3537 USA DRESDEN 3 BWR CECO 3537 USA DUANE ARNOLD BWR PAR 1898 USA DUANE ARNOLD BWR Holtec 1254 USA FERM12 BWR Holtec 559 USA FITZPATRICK BWR PAR 2797 USA FITZPATRICK BWR Holtec USA FT. CALHOUN PWR Holtec 160 USA HARRIS I PWR Holtec 484 USA HATCH1 BWR GE 5830 USA HATCH 2 BWR GE 2765 USA HOPE CREEK BWR Holtec 3998 USA HUMBOLDT BAY 3 BWR Unknown USA INDIAN POINT 3 PWR UST&D 1340 USA 4-10 NET-259-03 Rev 5 Table 4-5 (con't.)Partial List of LWRs Where BORAL T M Has Been Used in Spent Fuel Storage Racks KEWAUNEE PWR Holtec 215 USA KOEBERG 1 PWR Holtec South Africa KOEBERG 2 PWR Holtec South Africa KORI-4 PWR Holtec South Korea KUOSHENG 1 BWR ENSA 1578 Taiwan KUOSHENG 2 BWR ENSA 1578 Taiwan LAGUNA VERDE 1 BWR Holtec Mexico LAGUNA VERDE 2 BWR Holtec Mexico LASALLE 1 BWR UST&D 4029 USA LIMERICK 1 BWR Holtec 2500 USA LIMERICK 2 BWR Holtec 2766 USA MAINE YANKEE PWR PAR 1464 USA MCGUIRE 1 PWR Holtec 286 USA MCGUIRE 2 PWR Holtec 286 USA MILLSTONE 3 PWR Holtec 1104 USA MONTICELLO BWR GE 2229 USA NINE MILE POINT 1 BWR Holtec 3496 USA OYSTER CREEK BWR Holtec 390 USA PERRY 1 BWR PAR 2400 USA PERRY 2 BWR PAR 1620 USA PILGRIM BWR Holtec 1539 USA SALEM 1 PWR ENC 1117 USA SALEM 1 PWR Holtec 1117 USA SALEM 2 PWR ENC 1139 USA SALEM 2 PWR Holtec 1139 USA SEABROOK 1 PWR Westinghouse 576 USA SEQUOYAH 1 PWR Westinghouse 2091 USA SEQUOYAH 2 PWR Holtec USA SEQUOYAH2 PWR PAR 2091 USA SIZEWELL B PWR Holtec 1901 United Kingdom SUMMER 1 PWR Holtec 1712 USA SUSQUEHANNA 1 BWR PAR 2840 USA SUSQUEHANNA2 BWR PAR 2840 USA 4-11 NET-259-03 Rev 5 Table 4-5 (con't.)Partial List of LWRs Where BORAL T M Has Been Used in Spent Fuel Storage Racks THREE MILE ISLAND 1 PWR Holtec 1284 USA TURKEY POINT 3 PWR Holtec 131 USA TURKEY POINT 4 PWR Holtec 131 USA ULCHIN 1 PWR Holtec 1000 South Korea VERMONT YANKEE BWR UST&D 2860 USA VOGTLE 1 PWR Unknown 1476 USA WATERFORD 3 PWR Holtec 2232 USA WATTS BAR 1 PWR Holtec 1610 USA WATTS BAR 2 PWR Holtec 1610 USA YANKEE ROWE PWR PAR 721 USA YONGGWANG 1 PWR Holtec 1152 South Korea YONGGWANG 2 PWR Holtec 1152 South Korea ZION 1 PWR Holtec 3012 USA ZION 2 PWR Holtec 3012 USA ANGRA 1 PWR Holtec 1252 Brazil CATTENOM-1 PWR Framatome 2520 France CATTENOM-2 PWR Framatome 2520 France CATTENOM-3 PWR Framatome 2520 France CATTENOM-4 PWR Framatome 2520 France BELLEVILLE-1 PWR Framatome 1260 France BELLEVILLE-2 PWR Framatome 1260 France NOGENT-1 PWR Framatome 1260 France NOGENT-2 PWR Framatome 1260 France PENLY-1 PWR Framatome 1260 France PENLY-2 PWR Framatome 1260 France GOLFECH-1 PWR Framatome 1260 France GOLFECH-2 PWR Framatome 1260 France 4-12 NET-259-03 Rev 5 Table 4-6 Partial Listing of LWRs Where BORAL T M Has Been Used in Dry Storage Casks Current Module Absorber Plant Type Supplier Inventory Capacity Type ARKANSAS 2 Hi-Storm 100(MPC-32)
Holtec 416 32 BORAL CATAWBA 1 UMS-24 NAC 24 BORAL DIABLO CANYON 1 Hi-Storm 100(MPC-32)
Holtec BORAL DIABLO CANYON 2 Hi-Storm 100(MPC-24)
Holtec BORAL DRESDEN 2 Hi-Storm 100(MPC-68)
Holtec 1632 68 BORAL DUANE ARNOLD NUHOMS-61BT Transnuclear 610 61 BORAL FITZPATRICK Hi-Storm 100(MPC-68)
Holtec 204 68 BORAL HADDAM NECK MPC-24 NAC 651 24 BORAL HATCH 2 Hi-Storm 100(MPC-68)
Holtec 1496 68 BORAL MAINE YANKEE UMS-24 NAC 1440 24 BORAL PALO VERDE 1 UMS-24 NAC 624 24 BORAL PEACH BOTTOM 2 TN-68 Transnuclear 1632 68 BORAL PRAIRIE ISLAND 1 TN-40 Transnuclear 680 40 BORAL SEQUOYAH 2 Hi-Storm 100(MPC-32)
Holtec 96 32 BORAL TROJAN MPC(24)-Only Holtec 816 24 BORAL SUSQUEHANNA 1 NUHOMS-61BT Transnuclear 183 61 BORAL* as of mid 2005 In-Service Experience BORAL T M Plate and Sheet in Wet Storaae It has been noted that in conventional storage racks, once BORALTM is installed in fuel racks, it is not accessible for inspection to determine its in-service performance.
Accordingly, the NRC has, in the past, required utilities to initiate a coupon surveillance program when new racks were installed.
A coupon surveillance program consists of a series of small coupons either in a shroud (simulating the manner in which the BORALTM is encapsulated) or bare. The coupons are generally attached to a surveillance assembly, which is placed in a spent fuel rack storage cell.4-13 NET-259-03 Rev 5 The surveillance assembly is generally surrounded by recently discharged fuel assemblies to accelerate the rate at which the coupons accumulate gamma exposure.Prior to placing the assembly in service, the coupons are generally characterized with respect to:* visual appearance
- dry weight* dimensions
- specific gravity and density* boron-10 areal density Periodically, coupons are removed from the surveillance assembly and sent to an independent laboratory for testing. The post-irradiation test results generally mirror the pre-irradiation test results. As the surveillance coupons are prepared from BORALTM coupons cut from panels taken from the same production lot(s) used in the racks, the performance of the coupons should be indicative of the performance of the material in the racks.NETCO maintains laboratory facilities and offers inspection and testing services of neutron absorber surveillance coupons. In that capacity, NETCO has inspected hundreds of aluminum matrix surveillance coupons, many of them BORALTM, from spent fuel pools around the world. It has been observed during testing that some surveillance coupons can be subject to a generalized corrosion, that includes the development of a uniform oxide film. This film, once it forms, tends to be self passivating and prevents further corrosion.
Depending on pool conditions, other coupons can be susceptible to localized pitting corrosion.
It should be noted that while these corrosion effects can occur in aluminum matrix neutron absorbers, to date this in-service corrosion has not resulted in any detectable decrease in the boron-10 areal density. It is therefore concluded that the aluminum alloy matrix serves as suitable matrix to retain the boron carbide in spent fuel storage racks. Additional qualification testing has been performed 5 to further demonstrate the corrosion resistance of the Alcan WI 1 00.XYB material in 4-14 NET-259-03 Rev 5 BWR and PWR spent fuel pool applications.
This testing is described in Section 5.0 of this report.4.3 NETCO Credentials NETCO has been evaluating, specifying and qualifying neutron absorber material for storage systems and transportation packaging for more than a quarter of a century. In this capacity, NETCO has become an internationally recognized expert in assessing the in-service performance of this class of materials.
In 1987, the Electric Power Research Institute (EPRI) retained NETCO to evaluate the instances of unanticipated performance of one neutron absorber, Boraflex, at two Midwest plants. NETCO's first report on this phenomenon concluded the observed shrinkage of the sheets of absorber would be expected when cross linking polymer was exposed to gamma radiation.
NETCO notified EPRI that the BISCO materials qualification program did not adequately test the synergistic effects of gamma radiation and long term exposure to the pool water.These projections subsequently proved to be remarkably accurate and formed the bases for NETCO's development of BADGER and RACKLIFE.
BADGER (Boron-10 Areal Density Gage for Evaluating Racks) is a non-destructive test method that measures the residual boron-10 in spent fuel racks. BADGER has now been used in some 35 test campaigns to assess the reactivity hold down capability of both Boraflex racks and racks with other neutron absorbers.
RACKLIFE is a comprehensive computer program that tracks the performance of each and every Boraflex panel (as many as 4,000) in a typical rack installation.
RACKLIFE is based on first principles and on the mass balance of soluble silica as it dissolves from the degraded Boraflex matrix and gradually migrates to the bulk pool volume. NETCO tested samples of irradiated Boraflex and measured the rate of dissolution as a function of both absorbed dose and temperature in its laboratory.
This experimental data serves as the basis for the RACKLIFE dissolution model. This model and the RACKLIFE 4-15 NET-259-03 Rev 5 software upon which it is based as verified by BADGER measurements, serve to assure that spent fuel pool criticality limits are met.At the Penn State Breazeale Research Reactor laboratory, NETCO routinely tests neutron absorber surveillance coupons. These tests include Alcan composite material, BORAL T M , Boraflex, borated stainless steel, METAMIC, Talbor, Carborundum and ESK borated graphite and nano steel.NETCO was selected by Reynolds Metals Company to conduct qualification testing of its new neutron absorber material, METAMIC. In this test sequence, NETCO conducted accelerated radiation testing, accelerated corrosion testing and elevated temperature testing to qualify this material for use in spent fuel racks and storage and transportation casks. The resulting test report has been accepted by the NRC for both wet and dry applications.
A second qualification test sequence for another new neutron absorber BorTec T M was completed by NETCO for DWA Technologies, the manufacturer of BorTec T M.As such NETCO is the only organization to have successfully qualified new neutron absorber materials for wet storage applications since BORALTM was qualified some 40 years ago.NETCO was retained by EPRI, ENRESA and AAR (former BORAL T M manufacturer) to evaluate clad blister formation under cask drying conditions.
Laboratory testing by NETCO simulating cask drying condition lead to recommended changes in the AAR rolling schedule and lead to an improved BORAL T M product that is largely blister resistant.
4-16 NET-259-03 Rev 5 References Section 4: 4-1 K. Farrell, "ORNL/TM-1 3049 Assessment of Aluminum Structural Materials for 4 Service Within the ANS Reflector Vessel," Oak Ridge National Laboratory, August 1995 4-2 John Gilbert Kaufman, Properties of Aluminum Alloys, ASM International, 1999 4-17 NET-259-03 Rev 5 5.0 Accelerated Corrosion Testing 5.1 Test Description The accelerated corrosion test program has been designed to determine the susceptibility of the Rio Tinto Alcan composite to general (uniform) and localized (pitting) corrosion in PWR and BWR spent fuel pools. Two sets of coupons have been tested at the NETCO laboratory; one set in deionized water, simulating BWR pool conditions and one set in deionized water containing 2500 ppm boron as boric acid, simulating PWR pool conditions.
Both tests were conducted at 195°F (90.50C) to accelerate any corrosion effects, which might occur after the 8000 hour0.0926 days <br />2.222 hours <br />0.0132 weeks <br />0.00304 months <br /> (- 1 year) test period. The tests are accelerated by testing at elevated temperatures relative to typical temperatures in the actual service environment.
Typically, spent fuel pools are operated in the temperature range of 80 to 1 00°F (27 to 380C) with short term 4 excursions to 130°F (540C) during refueling outages.Coupons from each environment were removed after approximately 2000, 4000, 6000 and 8000 hours0.0926 days <br />2.222 hours <br />0.0132 weeks <br />0.00304 months <br /> and subjected to testing. Prior to testing the coupons were precharacterized with respect to thickness, weight and boron-10 areal density. After testing, the coupons were subjected to post-test characterization of these same attributes.
The testing after 2000, 4000, 6000 and 8000 hours0.0926 days <br />2.222 hours <br />0.0132 weeks <br />0.00304 months <br /> has been completed.
This document represents the final report for this accelerated corrosion test.5.2 Test Matrices and Coupon Description The coupon test matrix for the accelerated corrosion test is shown in Table 5-1. A total of 168 coupons have been tested; 84 in deionized water and 84 in 2500 ppm boron as 4 boric acid. As shown in Table 5-1, coupons with two levels of boron carbide loadings were tested. The coupons with an intermediate loading contain 16 vol% boron carbide.The coupons with the maximum boron carbide loading contain 25 vol% boron carbide.5-1 NET-259-03 Rev 5 Table 5-1 Coupon Test Matrix for Accelerated Corrosion Testing Number of Coupons Type of Coupon 16 vol % B 4 C 25 vol % B 4 C General 12 12 Bend 12 12 Galvanic (bi-metallic)*
18 18 Subtotal 42 42 Total 84*Note: For the galvanic bi-metallic coupons, there are 3 subtypes.These are SS-304L, Zircaloy and Inconel 718, each separately in combination with the Alcan composite.
At each of the scheduled test campaigns specific coupons were removed from the baths and subjected to testing. The number and type of coupons tested at 2000 and 6000 hours0.0694 days <br />1.667 hours <br />0.00992 weeks <br />0.00228 months <br /> is summarized in Table 5-2. The number and type of coupons tested at 4000 and 8000 hours0.0926 days <br />2.222 hours <br />0.0132 weeks <br />0.00304 months <br /> is summarized in Table 5-3. Three types of coupons at two boron carbide loadings have been tested as described in Tables 5-2 and 5-3.Table 5-2 Number and Type of Coupons per Bath Tested After 2000 and 6000 Hours Boron Carbide Loading Type of Coupon 16vol % 25 vol %General (G) 3 3 Bend (B) 3 3 Total 12 4 5-2 NET-259-03 Rev 5 Table 5-3 Number and Type of Coupons per Bath Tested After 4000 and 8000 Hours Boron Carbide Loading Type of Coupon 16vol % 25 vol %General (G) 3 3 Bend (B) 3 3 Bi-Metallic (BSS) 3 3 Bi-Metallic (BZ) 3 3 Bi-Metallic (BI) 3 3 Total 30 Since the NETCO-SNAP-INs are to be used with a mill finish absorber material, that is the finish of the coupons tested. For each coupon type the corrosion rates are determined.
The three coupon types are described below.General 4 General coupons are rectangular (nominally 4 in. x 2 in. in length and width). A test objective of the general coupons is to determine the rate at which a uniform oxide film forms. The rate of oxide build-up is determined by changes in the coupon weight and thickness.
Post test exposure, the coupons are subject to precision weighing prior to testing and after a sequence of nitric acid washes and drying after testing.Bend Coupons with press brake formed bends are included in the test matrix. These coupons have been deformed to the same bend angle and bend radius used for the NETCO-SNAP-IN.
The test objective of the bend coupons is to determine whether or not bend deformation and stress adversely affect the corrosion susceptibility of the Alcan material.
These will be subject to the same pre and post testing as the general coupons. In addition the inner and outer bend radius will be subject to microscopy before and after acid cleaning.5-3 NET-259-03 Rev 5 Galvanic (Bi-Metallic)
Coupons In conventional spent fuel racks the neutron absorber material is enclosed in 304L stainless steel wrapper plate, thus the potential for aluminum/stainless steel galvanic corrosion exists. In the NETCO-SNAP-IN application this material is used unsheathed so that is could be in contact with LWR fuel assemblies.
Of the materials in LWR fuel assemblies supplied by U.S. fuel manufacturers, only stainless steel, Inconel and Zircaloy could contact the surface of fuel racks. Accordingly bi-metallic coupons have been prepared with Alcan composite and: 4 304L stainless steel Inconel 718 Zircaloy The test objective of the galvanic coupon is to evaluate the potential for galvanic corrosion.
The above alloy coupons are nominally 2 in. x 4 in. x 0.065 in. thick. A piece of 2 in. x 4 in. Alcan composite forms the other piece of each couple. The two metals comprising each couple are fastened to each other mechanically with AA 100 wire.Inspection of the galvanic coupons is via optical microscopy, thickness and dry weight measurements.
Post test acid cleaning is used depending on the depth of any oxide films.5.3 Water Chemistry The laboratory tap water was processed by first passing it through two universal ion exchange columns and then through two research grade ion exchange columns. The 4 typical quality of the deionized water used for both the BWR and PWR corrosion baths and make up water is shown in Table 5-4.5-4 NET-259-03 Rev 5 Table 5-4 Water Specification for Corrosion Baths pH 5.75 @ 20°C Conductivity, :ps/cm 0.5 Resistivity, :a/cm 2.0 Aluminum < 0.010 ppm SiO 2 < 0.100 ppm CI < 0.010 ppm Na < 0.030 ppm To the PWR bath, sufficient reagent grade boric acid was added to bring the boron 4 concentration to -2500 ppm. This increased the initial conductivity from < 1.0 ps/cm to-40 ps/cm @ 20.00C and decreased the initial pH from 5.75 @ 20.0°C to -4.76 at 20.0 0 C.The conductivity and pH of each of the baths was measured at an approximate frequency of once per week. Figures 5-1 and 5-2 are plots of the measured pH and conductivity of the BWR bath versus time. The plots of the measured pH and conductivity versus time of the PWR bath are shown in Figures 5-3 and 5-4, respectively.
5-5 NET-259-03 Rev 5 12 .10 6 4 4 i 21 0 Figure 5-1: 1000 2000 3000 4000 5000 Hours pH versus Time: BWR Accelerated Corrosion Test 6000 7000 8000.E"0 t-C 10.00 9.00 8.00 7.00 L 6.00 5.00 4.00 3.00 2,00 1.00 11 4 U .UV +/- ____0 1000 2000 3000 4000 5000 6000 7000 8000 Figure 5-2: Water Conductivity versus Time: BWR Accelerated Corrosion Test 5-6 NET-259-03 Rev 5 1 8 .. ..... ..............................................
.............................................
..................
......................................
...... .... .... .........
.. .................................................................................................
.... ...............
........ .... ...........
..... ..... ..................................................
12 z8 4 6-4 2 0 1000 2000 3000 4000 5000 6000 7000 8000 Hours Figure 5-3: pH versus Time: PWR Accelerated Corrosion Test 50.0 45.0 10.0 E35ýo I U ii F Zt 3 0.0 Q25-I 020.0 H4 15.0 10.0 5.0 4 0.0 -!0 1000 2000 3000 4000 5000 6000 7000 8000 Hours Figure 5-4: Water Conductivity versus Time: PWR Accelerated Corrosion Test 5-7 NET-259-03 Rev 5 5.4 Corrosion Test Results Visual Inspection and Microscopy All coupons removed from the BWR and PWR accelerated corrosion tests after 2000, 4000, 6000 and 8000 hours0.0926 days <br />2.222 hours <br />0.0132 weeks <br />0.00304 months <br /> were subjected to visual inspection.
Some of the coupons were subjected to optional microscopy.
In addition, high resolution macro photographs were taken both upon removal from the test solutions and after air drying. Optical microscopy was also performed to verify that the oxide films were substantially removed prior to determining coupon weight loss and prior to inspecting for any anomalies along the outer bend radii of the bend coupons. The coupons and the digital data files of all macro photographs, microphotographs and photo micrographs are in permanent storage.A sampling of photographs and photomicrographs are included in this report to illustrate the pre and post test appearance of the coupons. Photographs and photomicrographs from the 4000 hour0.0463 days <br />1.111 hours <br />0.00661 weeks <br />0.00152 months <br /> and 8000 hour0.0926 days <br />2.222 hours <br />0.0132 weeks <br />0.00304 months <br /> inspections are compared to illustrate little change in coupon surface appearance once an initial oxide film forms. This suggests that the initial oxide film is largely self-passivating, limiting the rate of subsequent oxidation of the base metal. 4 Figure 5-5 is a macrophotograph that compares the appearance of the 16 vol %coupons exposed to the BWR and PWR test conditions for 4000 hours0.0463 days <br />1.111 hours <br />0.00661 weeks <br />0.00152 months <br /> with an as-fabricated archive coupon. The archive coupon is a somewhat darker grey color than pure AA 100 aluminum.
This appearance is characteristic of mill finish aluminum that is darkened somewhat by numerous small black boron carbide particles embedded in its surface. Figure 5-6 contains a similar macrophotograph for coupons inspected after 8000 hours0.0926 days <br />2.222 hours <br />0.0132 weeks <br />0.00304 months <br />.The coupons exposed to the BWR environment have a more or less uniform white oxide coating with some larger black areas where the boron carbide areas have been exposed. The areas of exposed boron carbide are larger than on the archive material.This may be due to boron carbide that was near the surface but covered by a thin layer 5-8 NET-259-03 Rev 5 of aluminum in the as-produced material.
Once oxidized, the thin oxide layer has insufficient strength to adhere to the underlying boron carbide and is loosened by the circulating bath water.The coupons exposed to the PWR environment appear somewhat different.
The background color is alight grey with smaller areas of exposed boron carbide on the surface. Examination of the surface under a microscope revealed the surface is covered with a uniform translucent film showing some of the color of aluminum through the film. Randomly interspersed are smaller dark areas of exposed boron carbide particles.
The surface appearance is similar after 4000 hours0.0463 days <br />1.111 hours <br />0.00661 weeks <br />0.00152 months <br /> and 8000 hours0.0926 days <br />2.222 hours <br />0.0132 weeks <br />0.00304 months <br />.Figures 5-7 and 5-8 compare the post test coupons with archive material for the composite with 25 vol % boron carbide loading after 4000 and 8000 hours0.0926 days <br />2.222 hours <br />0.0132 weeks <br />0.00304 months <br />, respectively.
It is noted that the archive material has a darker appearance than the archive material with 16 vol % due to the higher B 4 C loading. Similarly, the post test coupons are somewhat darker for the same reason. The oxidized surfaces of these post test 4 coupons are similar to the surfaces of the 16 vol % post test coupons and the appearances maintain their similarity after 4000 and 8000 hours0.0926 days <br />2.222 hours <br />0.0132 weeks <br />0.00304 months <br /> exposure.Figures 5-9 and 5-10 are microphotographs that compare the appearance of the 16 vol% post test coupons after 4000 and 8000 hours0.0926 days <br />2.222 hours <br />0.0132 weeks <br />0.00304 months <br />, respectively, with archive material at 8X magnification.
Figures 5-11 and 5-12 are microphotographs of 25 vol % coupons exposed to demineralized water and boric acid after 4000 hours0.0463 days <br />1.111 hours <br />0.00661 weeks <br />0.00152 months <br /> and 8000 hours0.0926 days <br />2.222 hours <br />0.0132 weeks <br />0.00304 months <br />, respectively.
Figures 5-13 and 5-14 are photomicrographs of the surfaces of 16 vol % and 25 vol %boron carbide composite, respectively, in the as-fabricated condition.
These can serve as a reference when evaluating the surface condition of the composites after 8000 hours0.0926 days <br />2.222 hours <br />0.0132 weeks <br />0.00304 months <br /> exposure to demineralized water and boric acid.5-9 NET-259-03 Rev 5 Figures 5-15 and 5-16 are photomicrographs of the 16 vol % B 4 C composite after 8000 hours0.0926 days <br />2.222 hours <br />0.0132 weeks <br />0.00304 months <br /> in demineralized water and boric acid, respectively.
The surface appearance in Figure 5-15 is characteristic of areas of between locally heavy surface boron carbide (see e.g. Figure 5-10).Figures 5-17 and 5-18 are photomicrographs of the 25 vol % B 4 C composite after 8000 hours0.0926 days <br />2.222 hours <br />0.0132 weeks <br />0.00304 months <br /> in demineralized water and boric acid, respectively.
The photograph and microphotographs contained in Figures 5-5 through 5-18 serve to illustrate that all coupons develop a more or less uniform oxide film on all surfaces.
The appearance of the coupons after 4000 hours0.0463 days <br />1.111 hours <br />0.00661 weeks <br />0.00152 months <br /> exposure compared to their appearance after 8000 hours0.0926 days <br />2.222 hours <br />0.0132 weeks <br />0.00304 months <br /> exposure show that they are essentially identical.
This suggests that the oxide film, once formed, is self-passivating and retards subsequent corrosion of the 4 base metal. This conclusion is further supported by the quantitative corrosion rate measurements described subsequently.
The difference in appearance of the coupons exposed to demineralized water and boric acid suggests the different pHs of the baths result in different forms of the oxide.Subsequent acid cleaning of the oxide to measure weight loss further supports this hypothesis.
For the coupons exposed to demineralized water, the oxided layer is readily removed by one short soak in nitric acid. For the coupons exposed to the boric acid solution, it required several longer soak periods in order for oxide removal and the coupons to achieve constant weight. It is postulated that at lower pH in the boric acid condition, oc -alumina (A1 2 0 3) forms, which is less soluble in nitric acid than the oxide formed at a higher pH in demineralized water. The latter form of the oxide formed at the higher pH in demineralized water is thought to be a hydrated form or Gibbsite (A1 2 0 3'3H 2 0). Optical microscopy of the inside and outside radius of the bend coupons before and after acid cleaning revealed no cracks or other anomalistic corrosion behavior.5-10 NET-259-03 Rev 5 4 Figure 5-5: Comparison of Post-Test Coupon Appearance with Archive Material: 16 vol % Boron Carbide Loading after 4000 Hours Figure 5-6: Comparison of Post-Test Coupon Appearance with Archive Material: 16 vol % Boron Carbide Loading after 8000 Hours 5-11 NET-259-03 Rev 5 Figure 5-7: Comparison of Post-Test Coupon Appearance with Archive Material: 25 vol % Boron Carbide Loading after 4000 Hours 4 Figure 5-8: Comparison of Post-Test Coupon Appearance with Archive Material: 25 vol % Boron Carbide Loading after 8000 Hours 5-12 NET-259-03 Rev 5 Figure 5-9: Comparison of Post-Test Coupon Appearance with Archive Material: 16 vol % Boron Carbide Loading at 8X Magnification after 4000 Hours 4 Figure 5-10: Comparison of Post-Test Coupon Appearance with Archive Material: 16 vol % Boron Carbide Loading at 8X Magnification after 8000 Hours 5-13 NET-259-03 Rev 5 Figure 5-11: Comparison of Post-Test Coupon Appearance with Archive Material: 25 vol % Boron Carbide Loading at 8X Magnification after 4000 Hours 4 Figure 5-12: Comparison of Post-Test Coupon Appearance with Archive Material: 25 vol % Boron Carbide Loading at 8X Magnification after 8000 Hours 5-14 NET-259-03 Rev 5 Figure 5-13: Photomicrograph of 16 vol % B 4 C Composite As-Fabricated (45X)4 Figure 5-14: Photomicrograph of 25 vol % B 4 C Composite As-Fabricated (45X)5-15 NET-259-03 Rev 5 Figure 5-15: Photomicrograph of 16 vol % B 4 C Composite after 8000 Hours in Demineralized Water (45X)4 Figure 5-16: Photomicrograph of 16 vol % B 4 C Composite after 8000 Hours in Boric Acid (45X)5-16 NET-259-03 Rev 5 Figure 5-17: Photomicrograph of 25 vol % B 4 C Composite after 8000 Hours in Demineralized Water (45X)4 Figure 5-18: Photomicrograph of 25 vol % B 4 C Composite after 8000 Hours in Boric Acid (45X)5-17 NET-259-03 Rev 5 Quantitative Corrosion Measurements The change in coupon thickness can provide a semi-quantitative measure of the extent and progression of corrosion.
The change in coupon weight, on the other hand, can provide a more accurate measure of the extent and progression of corrosion.
As the aluminum base metal on the surface of the coupons is converted to the oxide (either A1 2 0 3 or AI 2 03" n H 2 0), the volume of the oxide exceeds the volume of the original base metal consumed.
Concurrent with this conversion is an increase in thickness and increase in weight.The pre-test thickness of each general coupon was measured at nine locations.
The pre-test thickness of each bend coupon was measured at six locations.
The post-test thickness was measured at the same nine and six locations on the general and bend coupons, respectively.
The values reported are the average of either nine or six measurements for each coupon. The pre and post test coupons' weights were measured for each coupon after a one hour drying at 1 10°C to remove surface moisture.
4 Figures 5-19 and 5-20 contain the results of the average coupon thickness changes versus exposure times for the BWR and PWR coupons, respectively.
The data show that, with one exception, the coupons show a measurable increase in thickness.
The scatter in the data is likely attributable to measuring small changes in thickness in relatively thin samples. To place this data in perspective, a 5% increase in thickness on a coupon of initial thickness of 0.080 inches is 0.004 inches or 4 mils. If it is assumed that both sides of the coupon contribute equally then the increase is 0.002 inches per side. After 8000 hours0.0926 days <br />2.222 hours <br />0.0132 weeks <br />0.00304 months <br />, the average change in the thickness of the coupons exposed to accelerated BWR conditions is 4.2%; the corresponding value for the PWR coupons is 4.1%. Figures 5-21 and 5-22 contain plots of coupon weight change versus exposure time.At the 4000 hour0.0463 days <br />1.111 hours <br />0.00661 weeks <br />0.00152 months <br /> and 8000 hour0.0926 days <br />2.222 hours <br />0.0132 weeks <br />0.00304 months <br /> tests, eighteen of the galvanic corrosion couples were removed from each test bath and were subjected to testing. These included three 304L stainless steel couples, three Inconel 718 couples and three Zircaloy coupons at each 5-18 NET-259-03 Rev 5 B 4 C loading. No couples were tested at 2000 hours0.0231 days <br />0.556 hours <br />0.00331 weeks <br />7.61e-4 months <br /> and 6000 hours0.0694 days <br />1.667 hours <br />0.00992 weeks <br />0.00228 months <br />. Figures 5-23 and 5-24 show the weight change of the BWR and PWR couple samples after coupon drying.In accordance with ASTM G-31-72[1 1 and ASTM G-1-03[2 1 , the coupons were cleaned in 1.42 sp.gr. nitric acid to remove the corrosion products.
The intent of cleaning is to remove all of the corrosion products but none of the base metal so that the weight of the corrosion products can be determined.
This weight change can subsequently be used to determine the corrosion rate in mils/year.
As noted previously, the oxide on coupons in the BWR test was easily removed by one or two ten-minute soaks in nitric acid at room temperature.
For the PWR coupons it required several successive soak periods. After each cleaning cycle, the coupons were dried and reweighed.
The cleaning proceeded until the coupons achieved constant weight or visual and/or microscopic examination indicated the oxide film had been removed.Figures 5-25 and 5-26 show the average change in coupon thickness after acid cleaning for the BWR and PWR general and bend coupons, respectively.
Figures 5-27 and 5-28 show the change in coupon thickness after acid cleaning for the BWR and PWR galvanic coupons, respectively, after 4000 hours0.0463 days <br />1.111 hours <br />0.00661 weeks <br />0.00152 months <br /> and 8000 hours0.0926 days <br />2.222 hours <br />0.0132 weeks <br />0.00304 months <br />. These values represent the thickness of oxide removed by acid cleaning.
The average change in thickness by coupon type are summarized in Table 5-5. The data in Table 5-5 illustrate the difficulty in obtaining accurate changes in coupon thickness when the specimens are very thin. This is further evidenced by the variability in the coupon thickness data.The coupon weight changes as a result of acid cleaning are shown in Figures 5-29 and 5-30 for the BWR and PWR general and bend coupons, respectively.
The coupon weight changes as a result of acid cleaning are shown in Figures 5-31 and 5-32 for the BWR and PWR galvanic coupons, respectively.
The average change in coupon weight by coupon type are summarized in Table 5-6. This table shows the weight changes 5-19 NET-259-03 Rev 5 exhibit far less variability than the thickness changes in Table 5-5. Accordingly, the weight change data are used subsequently to compute corrosion rates.Table 5-5 Summary of Coupon Thickness Changes by Coupon Type Thickness Chanae. %Coupon Types 2153 Hours 4019 Hours 5871 Hours 8119 Hours BWR General and Bend 16 vol % B 4 C -1.14% + 0.59% -3.08% +/- 0.64% -1.40% + 1.07% -0.55% +/- 0.88%25 vol % B 4 C -0.72% +/- 0.89% -2.09% +/- 1.40% 0.08% +/- 0.44% -0.94% +/- 0.79%BWR Galvanic 16 vol % B 4 C -0.07% + 0.68% -0.91% +/- 0.35%25 vol % B 4 C -1.05% +/- 0.35% -0.98% +/- 0.81%PWR General and Bend 16 vol % B 4 C -0.03% +/- 0.51% -2.73% + 1.14% -0.70% +/- 0.92% -3.32% +/- 4.64%25 vol % B 4 C -0.55% + 0.46% -1.24% +/- 1.05% 0.44% +/- 1.10% -0.13% +/- 0.82%PWR Galvanic 16 vol % B4C -1.04% + 0.81% 1-2.55% +/- 3.25%25 vol % B4C -1.24% +/- 0.27% -0.40% +/- 0.88%Table 5-6 Summary of Coupon Weight Changes by Coupon Type Weight Chanqe, %Coupon Types 2153 Hours 4019 Hours 5871 Hours 8119 Hours BWR General and Bend 16 vol % B 4 C -0.15% + 0.12% -0.28% + 0.22% -0.68% +/- 0.19% -0.50% +/- 0.17%25 vol % B4C -0.29% +/- 0.27% -0.36% +/- 0.38% -0.68% +/- 0.25% -0.69% +/- 0.75%BWR Galvanic 16 vol % B 4 C 0.05% +/- 0.2% -0.34% +/- 0.19%25 vol % B 4 C -0.24% +/- 0.27% -0.81% +/- 0.28%PWR General and Bend 16 vol % B 4 C -0.12% +/- 0.04% -0.07% +/- 0.09% -0.10% + 0.12% -0.26% +/- 0.37%25 vol % B4C -0.04% +/- 0.07% -0.02% +/- 0.05% -0.17% + 0.12% -0.16% +/- 0.09%PWR Galvanic 16 vol % B 4 C -0.64% +/- 0.77% -0.89% +/- 0.46%25 vol % B4C -0.79% +/- 0.98% -0.66% +/- 0.46%4 5-20 NET-259-03 Rev 5 Boron-10 Areal Density The boron-1 0 areal density of the general coupons was measured using neutron attenuation testing. The results of the post-test measurements were compared with similar testing of archive coupons. Figures 5-33 and 5-34 contain plots of the change in boron-10 areal density versus exposure time for the BWR and PWR coupons, 4 respectively.
To place these measurements in perspective, the average areal density of the 16 vol % coupons is 0.010 gms B-1 0/cm 2; the corresponding areal density of the 25 vol % coupons is 0.0176 gms B-10/cm 2.The variation in areal density changes are within +/- 1.0 to 2.0% of zero change, which is within the absolute uncertainty of the areal density measurements.
5-21 NET-259-03 Rev 5 o16Vol % B 4 C 60/% O25Vol % B 4 C% 40 /0 2 O/o (-3-4%-6%0 1000 2000 3000 4000 5000 Ti me, hrs 6000 7000 8000 Figure 5-19: BWR Thickness Change (Pre-Test vs. Post-Test) 4~4%20/Ul 02-0 1000 2000 3000 4000 5000 6000 7000 8000 Time, hrs Figure 5-20: PWR Thickness Change (Pre-Test vs. Post-Test) 5-22 NET-259-03 Rev 5 4.00%3.00%2.00%f 1.00%0.00%U'-2.00%-3.00%-4.00%% B 4 C 1J25Vol % B 4 C 0 1000 2000 3000 4000 5000 60 Time, hrs Figure 5-21: BWR Weight Change (Pre-Test vs. Post-Test) 4.00%o16Vol % B 4 C 3.00% 025Vol % B 4 C 2.00%e 1.00%M 0.00%-1.00%-2.00%-3.00%-4.00%00 7000 8000 4'p 0 1000 2000 :3000 4000 5000 Ti me, hrs 6000 7000 8000 Figure 5-22: PWR Weight Change (Pre-Test vs. Post-Test) 5-23 NET-259-03 Rev 5 4.00%3.00%2.00%M0.00%"# 1.00%2. 00%-3.00%-4.00%o16Vol % B4C D25Vol % B 4 C i i i i [0 1000 2000 3000 4000 5000 Time, hrs 6000 7000 8000 Figure 5-23: BWR Coupon Weight Change versus Time: Galvanic Couple Coupons 4 4.00%3.00%2.00%e1.00%0.00%.1.00%'-2.00%-3.00%-4.00%0 1000 2000 3000 4000 5000 Time, hrs 6000 7000 8000 Figure 5-24: PWR Coupon Weight Change versus Time: Galvanic Couple Coupons 5-24 NET-259-03 Rev 5 8%4%4" 00/U, I---6%-8%0 1000 2000 3000 4000 5000 6000 7000 8000 Time, hrs Figure 5-25: BWR Thickness Change (Pre-Test vs. Post-Test)
After Acid Cleaning: General and Bend Coupons 4 8%6%4%2%M~ 0%/U 4-2%-4%-6%-8%016Vol % B 4 C O125VoI % B 4 C 0 1000 2000 3000 4000 5000 Time, hrs 6000 7000 8000 Figure 5-26: PWR Thickness Change (Pre-Test vs. Post-Test)
After Acid Cleaning: General and Bend Coupons 5-25 NET-259-03 Rev 5 8%.,4%4ý0_2%0%U in-46%-8%o16Vol % B 4 C EJ25VoI % B 4 C 0 1000 2000 3000 4000 5000 Time, hrs 6000 7000 8000 Figure 5-27: BWR Galvanic Coupons After Acid Cleaning:
Coupon Thickness Change 4 8%6%4%/2%0%'U IA IA S-2%* -4%I---6%-8%<16Vol % B 4 C EJ25Vol % B 4 C I 0 1000 2000 3000 4000 5000 Time, hrs 6000 7000 8000 Figure 5-28: PWR Galvanic Coupons After Acid Cleaning:
Coupon Thickness Change 5-26 NET-259-03 Rev 5 4.00%:3.00%2.00%6.1.00%Q-0.00%31.00%-3.00%-4.00%616Vol % B 4 C O25Vol % B 4 C 0 1000 2000 3000 '1000 5000 6000 7000 8000 Time, hrs Figure 5-29: BWR Coupon Weight Change (Pre-Test vs. Post-Test)
After Acid Cleaning:
General and Bend Coupons Only 4.00%O16Vol % B 4 C 3.00%.0 25Vol % B 4 C 2.000/o 1.00%e0.00% ., U 4j- 1.00%'u-2.00%-3.00%-4.00%4 0 1000 2000 3000 4000 5000 Time, hrs 6000 7000 8000 Figure 5-30: PWR Coupon Weight Change (Pre-Test vs. Post-Test)
After Acid Cleaning:
General and Bend Coupons Only 5-27 NET-259-03 Rev 5 10.00%8.00%6.00%4.00%e2.00%02.00%.04.00%:-6.00%-8.00%-10.00%016Vol % B 4 C O25Vol % B 4 C 0 1000 2000 3000 4000 5000 Time, hrs 6000 7000 8000 Figure 5-31: BWR Galvanic Coupon Weight Change versus Time 10.00%8.00% O16Vol % B 4 C Er25Vol % B 4 C 6.00%4.00%2.00%(~0.000/-2.00%-4.00o-6.00o-8.00%-10.00%4 0 1000 2000 3000 4000 5000 Time, hrs 6000 7000 8000 Figure 5-32: PWR Galvanic Coupon Weight Change versus Time 5-28 NET-259-03 Rev 5 0 16Vol % B 4 C O25Vol % B4C N E U 0 m C U C Uncertainty.I[]i H 0.0020 0.0015 0.0010 0.0005 0.0000-0.0005-0.0010-0.0015-0.0020[]I 0 2000 4000 Time. hrs 6000 8000 4 Figure 5-33: BWR Coupon Areal Density Change versus Time 016Vol % B4C E25Vol % B4C E U 01 Uncertainty I W ir~i ~I 0.0020 0.0015 0.0010 0.0005 0.0000-0.0005-0.0010-0.0015-0.0020 0 2000 4000 Time. hrs 6000 8000 Figure 5-34: PWR Coupon Areal Density Change versus Time 5-29 NET-259-03 Rev 5 5.5 Discussion of Test Results and Conclusions Following the guidance provided in Reference 1, the post-test coupon weights after acid cleaning can be compared with pre-test weights to compute the test environment corrosion rate (mils/year) of the various coupon types. Using corrosion data in Reference 3 for AA1 200 series aluminum in water at 1220 F and 3920 F, it is possible to compute the corresponding in-service corrosion rates at typical spent fuel pool conditions and water temperature (typically 800 F). These calculations are contained in the Appendix and the so calculated in-service corrosion rates are summarized in Table 5-7. Table 5-8 contains the equivalent in-service exposure times for each of the four test intervals.
Table 5-7: Average Corrosion Rates In-Service Corrosion Rates. mils/vear 2153-Hour 4019-Hour 5871-Hour 8119-Hour Coupon Types Test Test Test Test BWR General and Bend 16 vol % B 4 C -0.01 -0.01 -0.02 -0.01 25 vol % B 4 C -0.02 -0.02 -0.02 -0.02 BWR Galvanic 16 vol % B 4 C 0.01 -0.01 25 vol % B 4 C -0.01 -0.02 PWR General and Bend 16 vol % B 4 C -0.01 -0.01 -0.03 -0.01 25 vol % B 4 C -0.01 -0.02 -0.01 -0.01 PWR Galvanic 16 vol % B 4 C -0.02 -0.02 25 vol % B 4 C -0.04 -0.01 4 Table 5-8: Equivalent Exposure Time Test Hours (, 1950 F In-Service Hours (, 800 F 2153 39050 4019 72911 5871 107447 8119 148605 5-30 NET-259-03 Rev 5 The computed in-service corrosion rates shown in Table 5-7 are extremely low and in each instance are based on the average weight loss of several coupons. A corrosion rate of -0.02 mils/year can be interpreted to mean that after 100 years an oxide film 2 mils thick would be expected on all surfaces.
The reason for this extremely low corrosion rate is that once an oxide film forms on all surfaces, the film tends to be self-passivating; that is, it tends to retard further corrosion.
This property of the oxide film formation leads to the excellent corrosion resistance of AA1 100 aluminum alloy and the 5 performance of the Rio-Tinto Alcan material shows similar performance.
This has been observed in other aluminum boron carbide composites tested by NETCO.[4 1 It is further noted that for both the 16 vol % and the 25 vol % coupons, there has been no measurable change in the B-10 areal density, nor has any local corrosion (pitting) or cracking been detected.
Optical microscopy of inside and outside radius of bend coupons revealed no cracks or anomalistic corrosion behavior.
These observations 4 apply to both the BWR and the PWR test environments.
Once installed, the inserts assume a constant strain condition within the rack cell. This compression leads to internal stresses, especially at the bend, that might make the inserts susceptible to stress corrosion cracking.
An examination of the literature on this subject[5-5]'
[5-6], indicates that "In general, high-purity aluminum and low-strength 5 aluminum alloys are not susceptible to SCC.[5-5 However, surveillance bend coupons to be placed in the pool prior to the installation of the inserts will be maintained under the same strain conditions to provide indication of any unexpected crack phenomena.
Not withstanding the low measured corrosion rates, corrosion itself does not result in any loss of boron carbide. After the corrosion film forms, the boron carbide remains tightly bound in the corrosion layer. This was confirmed by the neutron attenuation measurements for boron-1 0 areal density, which were performed prior to acid cleaning to remove corrosion products.5-31 NET-259-03 Rev 5 As determined by the testing sequences described herein, the low measured corrosion rates under accelerated corrosion test conditions as well as the constancy of boron-10 areal density, recommends that the AA1 100/boron carbide composite produced by Rio Tinto Alcan is a highly suitable neutron absorber material for use in spent fuel storage racks.References Section 5: 5-1 ASTM G-31-72 (Reapproved 2004), Standard Practice for Laboratory Corrosion Testing of Metals.5-2 ASTM G-1-03, Standard Practice for Preparing, Cleaning, and Evaluating Corrosion Test Specimens.
5-3 Godard, Epson, Bothwell and Kane, The Corrosion of Light Metals, John Wiley &Sons, Inc., New York, 1967.5-4 Qualification of METAMIC for Spent-Fuel Storage Applications, Electric Power Research Institute Report 1003137 by Northeast Technology Corp., Kingston, NY. October 2001.5-5 Davis, J.R. Corrosion of Aluminum and Aluminum Alloys. ASM International.
November 2000. Pg. 108 4 5-6 Bauccio, Michael. ASM Metals Reference Book, Third Edition. ASM International.
April 2003. Pg. 408 5-32 NET-259-03 Rev 5 6.0 Fast Start Coupon Surveillance Program Description The fast start coupon surveillance program consists of a series of 24 coupons cut from extra Alcan composite produced for the LaSalle demonstration.
These coupons are 2 x 4 inches in width and length and have two 0.25 inch diameter holes along the top and bottom edge as shown in Figure 6-1. Their thickness is nominally 0.065 inch and each coupon contains 16 vol% boron carbide. The purpose of the fast start program is to provide early performance data on the Alcan composite in the LaSalle Unit 2 pool environment.
Each of the coupons will be connected to the next coupon with a stainless steel link clip.The string of 24 coupons will be attached to a short piece of stainless steel chain, which in turn will be attached to a head assembly (See Figure 6-2). The head assembly contains a hook so that it can be remotely lowered into a rack storage cell in the LaSalle Unit 2 pool. When in place the head piece will rest on top of a storage cell with the string of coupons suspended in the cell below. The length of the connecting chain between the head piece and the string of coupons was adjusted so that all 24 coupons are within the active fuel region of the eight surrounding fuel assemblies.
At each refueling outage the fast start coupons will be in a cell surrounded in all eight locations with freshly discharged fuel. In this manner the gamma energy disposition and temperatures of the coupons will be maximized.
Two coupons will be removed every six months from the string and sent to a qualified laboratory for testing and inspection.
The coupons have been subjected to pre characterization and will be post test characterized.
Table 6-1 contains the pre and post test inspections and measurements.
6-1 NET-259-03 Rev 5 7I LaS.Je Unit 2 Fast Stan Couponi Figure 6-1: Fast Start Surveillance Coupon Figure 6-2: Fast Start Coupons String 6-2 NET-259-03 Rev 5 Table 6-1 Pre and Post Test Coupon Characterization Test Pre Post Characterization Characterization Visual (Hi resolution digital photo)Dimension 4 /Dry Weight 4 4 Density 4 4 Areal Density 4+ 4 Acid Cleaning 4 Weight Loss 4 Corrosion Rate 4 Microscopy 4*+ On select coupons*as-required A prime objective of this fast start program is to provide some early data as to the actual corrosion rates anticipated under actual LaSalle spent fuel pool conditions.
6-3 NET-259-03 Rev 5 7.0 Long-Term Surveillance Program The long-term surveillance program will consist of a specially designed surveillance tree to which a series of surveillance coupons are attached.
The long-term surveillance tree will be placed within the pool as part of the first installation campaign of NETCO-SNAP-INs and will reside there as long as the fuel racks continue to be used. Periodically, coupons will be removed and sent to a qualified laboratory for testing.7.1 Tree and Coupon Description The surveillance tree will be a four-sided structure with 18 -2" x 4" coupons attached to each side and 12 -2" bend coupons abutting adjacent faces. The bend coupons will be 3 I 4 maintained under a fixed strain in the fixture. They will be manufactured at the same initial angle as the inserts and bent to the square angle of the rack cells. All coupons will contain 17 vol% boron carbide. The types and numbers of coupons included in the program are shown in Table 7-1.Table 7-1 Long-Term Surveillance Coupons Coupon Type Number Objective General 48 Quantify long-term corrosion Track effects along bend radii Bend 24 including stress relaxation and stress corrosion cracking Trend galvanic corrosion with 304SS, In and Zirc coupons 4 7.2 Coupon Inspection and Testing Specific coupons will be removed from tree on a frequency schedule as described subsequently.
The general coupons will be subject to pre and post examination according to Table 7-2.7-1 NET-259-03 Rev 5 Table 7-2 Long-Term Surveillance General Coupon Characterization Pre Post Characterization Characterization Visual (Hi resolution digital photo)Dimension Dry Weight Areal Density /1 Acid Cleaning __Weight Loss Corrosion Rate Microscopy 4+ On select coupons*as-required The bend and galvanic coupons will be subject to the tests in Table 7-3.Table 7-3 Long-Term Surveillance Bend and Galvanic Coupon Characterization Test Pre Post Characterization Characterization Visual (High Resolution Digital Photo)Thickness Dry Weight Bending Stress (Bend Coupons Only)Acid Cleaning Weight Loss and Corrosion Rate Microscopy
- as-required 4 7-2 NET-259-03 Rev 5 7.3 Frequency for Coupon Inspection The frequency for coupon inspection will depend on the coupon type and results of previous inspections.
The frequency for inspection is shown in Table 7-4.Table 7-4 Frequency for Coupon Testing After 10 Years with Coupon Type First Ten Years Acceptable Performance General 2 coupons every 2 years 2 coupons every 4 years Bend 1 coupon every 2 years 1 coupon every 4 years Galvanic Couples 304 Stainless 1 couple every 6 years Z irc " In " 2 7-3