MONTHYEARRS-23-120, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information2023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information RS-23-103, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-10-13013 October 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2023-08-30030 August 2023 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs RS-23-087, Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor2023-08-0404 August 2023 Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor RS-23-084, Response to Request for Additional Information Regarding the Application to Revise Design Basis to Allow Use of Plastic Section Properties in Lower Downcomer Braces Analysis2023-07-24024 July 2023 Response to Request for Additional Information Regarding the Application to Revise Design Basis to Allow Use of Plastic Section Properties in Lower Downcomer Braces Analysis RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-23023 March 2023 Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations RS-23-048, Exigent Amendment Request to Revise Design Basis Related to Seismic Requirements2023-03-0707 March 2023 Exigent Amendment Request to Revise Design Basis Related to Seismic Requirements RS-23-045, Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.2032023-02-28028 February 2023 Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.203 RS-23-037, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for LaSalle County Station2023-02-22022 February 2023 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for LaSalle County Station RS-23-003, Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-102023-01-31031 January 2023 Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 RS-22-085, Application to Revise Design Basis to Allow Use of Plastic Section Properties in Lower Downcomer Braces Analysis2023-01-12012 January 2023 Application to Revise Design Basis to Allow Use of Plastic Section Properties in Lower Downcomer Braces Analysis RS-23-006, Supplemental Information Regarding License Amendment Request Relocation of Pressure and Temperature Limit Curves to the Pressure and Temperature Limits Report2023-01-10010 January 2023 Supplemental Information Regarding License Amendment Request Relocation of Pressure and Temperature Limit Curves to the Pressure and Temperature Limits Report RS-22-126, Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2022-11-30030 November 2022 Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI RS-22-109, Response to Request for Additional Information License Amendments Related to Fuel Storage2022-10-12012 October 2022 Response to Request for Additional Information License Amendments Related to Fuel Storage RS-22-092, Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration2022-10-0303 October 2022 Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration RS-22-093, Advisement of Leadership Changes for Constellation Energy Generation, LLC and Submittal of Updated Standard Practice Procedures Plans2022-08-18018 August 2022 Advisement of Leadership Changes for Constellation Energy Generation, LLC and Submittal of Updated Standard Practice Procedures Plans RS-22-083, Response to Request for Additional Information Related to the License Amendment Request to Change New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies, with Proposed Changes to Technical2022-06-17017 June 2022 Response to Request for Additional Information Related to the License Amendment Request to Change New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies, with Proposed Changes to Technical RS-22-051, Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists2022-04-12012 April 2022 Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists RS-22-049, Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellation'S Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for2022-04-0404 April 2022 Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellation'S Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for V RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations RS-22-035, Supplemental Information Regarding Relief Request I4R-13 Relief from Code Examinations for 1B33-F060A and 1B33-F060B Repairs2022-03-0404 March 2022 Supplemental Information Regarding Relief Request I4R-13 Relief from Code Examinations for 1B33-F060A and 1B33-F060B Repairs RS-22-033, Response to Request for Additional Information Regarding Relief Request I4R-13 Relief from Code Examinations for 1B33-F060A and 1B33-F060B Repairs2022-03-0303 March 2022 Response to Request for Additional Information Regarding Relief Request I4R-13 Relief from Code Examinations for 1B33-F060A and 1B33-F060B Repairs RS-22-032, Relief Request I4R-13 Relief from Code Examinations for 1B33-F060A and 1B33-F060B Repairs2022-03-0202 March 2022 Relief Request I4R-13 Relief from Code Examinations for 1B33-F060A and 1B33-F060B Repairs RS-22-023, Constellation Energy Generation, LLC, Executed Trust Fund Agreement Amendment and Subordinate Trust Agreement2022-02-23023 February 2022 Constellation Energy Generation, LLC, Executed Trust Fund Agreement Amendment and Subordinate Trust Agreement RS-22-027, Constellation, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated2022-02-23023 February 2022 Constellation, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated P RS-22-018, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for LaSalle County Station2022-02-22022 February 2022 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for LaSalle County Station RS-22-019, Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists2022-02-16016 February 2022 Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists RS-22-015, Notification of Completion of License Transfer and Request to Continue Processing Pending NRC Actions Previously Requested by Exelon Generation Company, LLC2022-02-0101 February 2022 Notification of Completion of License Transfer and Request to Continue Processing Pending NRC Actions Previously Requested by Exelon Generation Company, LLC RS-22-004, Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2022-01-0404 January 2022 Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RS-21-121, Proposed Changes to Decommissioning Trust Agreements and Master Terms2021-12-15015 December 2021 Proposed Changes to Decommissioning Trust Agreements and Master Terms RS-21-115, Supplemental Information for License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies, with Proposed Changes to Technical Specifications 4.3.1 and 5.6.52021-11-0404 November 2021 Supplemental Information for License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies, with Proposed Changes to Technical Specifications 4.3.1 and 5.6.5 RS-21-109, Request to Withhold Meeting Materials for the Non-Public Meeting Held on September 2, 20212021-10-14014 October 2021 Request to Withhold Meeting Materials for the Non-Public Meeting Held on September 2, 2021 RS-21-091, Implementation of Insider Threat Program Requirements Associated with the Voluntary Security Clearance Program and Advisement of Leadership Changes2021-09-13013 September 2021 Implementation of Insider Threat Program Requirements Associated with the Voluntary Security Clearance Program and Advisement of Leadership Changes RS-21-078, Response to Request for Additional Information for Application to Revise Technical Specification to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements, and TSTF-583-T, TSTF-582 Diesel2021-08-19019 August 2021 Response to Request for Additional Information for Application to Revise Technical Specification to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements, and TSTF-583-T, TSTF-582 Diesel RS-21-085, Response to Request for Additional Information Regarding License Amendment Request to Incorporate Licensing Topical Report NEDE-33885PA, Revision 1, GNF CRDA Application Methodology (EPID-L-2021-LLA-0016)2021-08-17017 August 2021 Response to Request for Additional Information Regarding License Amendment Request to Incorporate Licensing Topical Report NEDE-33885PA, Revision 1, GNF CRDA Application Methodology (EPID-L-2021-LLA-0016) RS-21-063, Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2021-06-30030 June 2021 Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RS-21-064, License Amendment Request Re New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies - Cover Letter2021-06-30030 June 2021 License Amendment Request Re New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies - Cover Letter RS-21-070, Proposed Alternative to Utilize Code Case N-8932021-06-30030 June 2021 Proposed Alternative to Utilize Code Case N-893 RS-21-055, Response to Third Round Request for Additional Information (Rals) for LaSalle License Amendment Request to Adopt Risk Informed Completion Times TSTF- 505, Revision 2, Provide Risk-Informed Extended.2021-05-10010 May 2021 Response to Third Round Request for Additional Information (Rals) for LaSalle License Amendment Request to Adopt Risk Informed Completion Times TSTF- 505, Revision 2, Provide Risk-Informed Extended. RS-21-054, Response to NRC Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations2021-04-29029 April 2021 Response to NRC Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations RS-21-050, Response to Request for Additional Information (RAI) Regarding Request for License Amendment Regarding Ultimate Heat Sink (EPID-L-2020-LLA-0165)2021-04-16016 April 2021 Response to Request for Additional Information (RAI) Regarding Request for License Amendment Regarding Ultimate Heat Sink (EPID-L-2020-LLA-0165) RS-21-045, Response to Request for Additional Information (RAI) Regarding Request for License Amendment Regarding Ultimate Heat Sink (EPID-L-2020-LLA-0165)2021-04-0707 April 2021 Response to Request for Additional Information (RAI) Regarding Request for License Amendment Regarding Ultimate Heat Sink (EPID-L-2020-LLA-0165) RS-21-040, Response to Second Round Request for Additional Information (Rais) for License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2021-03-31031 March 2021 Response to Second Round Request for Additional Information (Rais) for License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b RS-21-043, Supplemental Information Regarding Relief Request I4R-12 Relief from Code Examinations for 2B33-F060A and 2B33-F060B Repairs, Revision 22021-03-26026 March 2021 Supplemental Information Regarding Relief Request I4R-12 Relief from Code Examinations for 2B33-F060A and 2B33-F060B Repairs, Revision 2 RS-21-042, Relief Request I4R-12 Relief from Code Examinations for 2B33-F060A and 2B33-F060B Repairs, Revision 22021-03-26026 March 2021 Relief Request I4R-12 Relief from Code Examinations for 2B33-F060A and 2B33-F060B Repairs, Revision 2 RS-21-039, Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments2021-03-25025 March 2021 Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments RS-21-035, Relief Request I4R-12 Relief from Code Examinations for 2B33-F060A and 2B33-F060B Repairs2021-03-0909 March 2021 Relief Request I4R-12 Relief from Code Examinations for 2B33-F060A and 2B33-F060B Repairs 2023-08-04
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARRS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML23073A2182023-03-22022 March 2023 Issuance of Amendment No. 258 to Renewed Facility Operating Licenses Exigent Amendment to Revise Design Basis Related to Seismic Requirements RS-23-048, Exigent Amendment Request to Revise Design Basis Related to Seismic Requirements2023-03-0707 March 2023 Exigent Amendment Request to Revise Design Basis Related to Seismic Requirements RS-23-006, Supplemental Information Regarding License Amendment Request Relocation of Pressure and Temperature Limit Curves to the Pressure and Temperature Limits Report2023-01-10010 January 2023 Supplemental Information Regarding License Amendment Request Relocation of Pressure and Temperature Limit Curves to the Pressure and Temperature Limits Report ML22332A4492022-11-10010 November 2022 License Amendment Request - Relocation of Pressure and Temperature Limit Curves to the Pressure and Temperature Limits Report RS-22-092, Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration2022-10-0303 October 2022 Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration RS-22-004, Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2022-01-0404 January 2022 Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements ML21277A1932021-11-16016 November 2021 Enclosure 2, Draft Conforming License Amendments RS-21-115, Supplemental Information for License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies, with Proposed Changes to Technical Specifications 4.3.1 and 5.6.52021-11-0404 November 2021 Supplemental Information for License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies, with Proposed Changes to Technical Specifications 4.3.1 and 5.6.5 JAFP-21-0089, Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2021-09-27027 September 2021 Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position RS-21-064, License Amendment Request Re New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies - Cover Letter2021-06-30030 June 2021 License Amendment Request Re New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies - Cover Letter RS-21-039, Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments2021-03-25025 March 2021 Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments ML21057A2732021-02-25025 February 2021 Application for Order Approving License Transfers and Proposed Conforming License Amendments RS-20-115, Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements2020-11-18018 November 2020 Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements RS-20-087, Request for a License Amendment to LaSalle County Station, Units 1 and 2, Technical Specification 3.7.3, Ultimate Heat Sink2020-07-17017 July 2020 Request for a License Amendment to LaSalle County Station, Units 1 and 2, Technical Specification 3.7.3, Ultimate Heat Sink RS-20-031, License Amendment Request - Application to Adopt Technical Specification Task Force (TSTF) Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2 .5 and TS 3.6 .3.2, Using the Consolidated Line Item Improvement Process2020-04-30030 April 2020 License Amendment Request - Application to Adopt Technical Specification Task Force (TSTF) Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2 .5 and TS 3.6 .3.2, Using the Consolidated Line Item Improvement Process RS-20-011, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors2020-01-31031 January 2020 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors RS-20-009, Application to Revise LaSalle County Station Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2020-01-31031 January 2020 Application to Revise LaSalle County Station Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b RS-19-044, License Amendment Request - Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions2019-08-28028 August 2019 License Amendment Request - Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions RS-19-069, License Amendment Request Supporting Emergency Plan Emergency Action Level Change (EAL RAL3)2019-08-23023 August 2019 License Amendment Request Supporting Emergency Plan Emergency Action Level Change (EAL RAL3) JAFP-19-0067, Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability2019-06-27027 June 2019 Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability RS-19-040, Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2019-06-25025 June 2019 Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML19036A5862019-03-21021 March 2019 Issuance of Amendments to Revise the Emergency Response Organization Staffing Requirements RS-19-003, Application to Adopt TSTF-564, Safety Limit Mcpr.2019-02-0101 February 2019 Application to Adopt TSTF-564, Safety Limit Mcpr. RS-18-130, Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO2018-11-0101 November 2018 Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO RS-18-020, Application to Revise Technical Specifications to Modify the APRM Channel Adjustment Surveillance Requirement2018-06-15015 June 2018 Application to Revise Technical Specifications to Modify the APRM Channel Adjustment Surveillance Requirement RS-18-032, Application to Adopt TSTF-372, Addition of LCO 3.0.8, Inoperability of Snubbers2018-04-25025 April 2018 Application to Adopt TSTF-372, Addition of LCO 3.0.8, Inoperability of Snubbers RS-18-028, License Amendment Request to Remove Operating Mode Restrictions for Performing Surveillance Testing of the Division 3 Battery and High Pressure Core Spray Diesel Generator2018-04-19019 April 2018 License Amendment Request to Remove Operating Mode Restrictions for Performing Surveillance Testing of the Division 3 Battery and High Pressure Core Spray Diesel Generator RS-17-161, Fleet License Amendment Request to Relocate Technical Specification Unit/Facility/Plant Staff Qualification ANSI N18.1-1971 and ANSl/ANS-3.1-1978 Requirements to the Exelon Quality Assurance Topical Report (QATR)2018-03-0101 March 2018 Fleet License Amendment Request to Relocate Technical Specification Unit/Facility/Plant Staff Qualification ANSI N18.1-1971 and ANSl/ANS-3.1-1978 Requirements to the Exelon Quality Assurance Topical Report (QATR) RS-18-023, License Amendment Request to Revise the Technical Specifications (TS) Surveillance Requirement (SR) 3.4.4.1 to Revise the Lower Setpoint Tolerances for Safety/Relief Valves (S/Rvs)2018-02-27027 February 2018 License Amendment Request to Revise the Technical Specifications (TS) Surveillance Requirement (SR) 3.4.4.1 to Revise the Lower Setpoint Tolerances for Safety/Relief Valves (S/Rvs) RS-18-021, Exelon Generation Co, LLC - License Amendment Request for Approval of Changes to Emergency Plan EP-AA-1000 Staffing Requirements2018-01-31031 January 2018 Exelon Generation Co, LLC - License Amendment Request for Approval of Changes to Emergency Plan EP-AA-1000 Staffing Requirements RS-18-021, License Amendment Request for Approval of Changes to Emergency Plan EP-AA-1000 Staffing Requirements2018-01-31031 January 2018 License Amendment Request for Approval of Changes to Emergency Plan EP-AA-1000 Staffing Requirements ML18053A1752018-01-31031 January 2018 Attachment 5A - LaSalle Marked-up Emergency Plan EP-AA-1000 Pages ML18053A1762018-01-31031 January 2018 Attachment 5B - LaSalle Clean Emergency Plan EP-AA-1000 Pages ML18053A1842018-01-31031 January 2018 Enclosure 5 - LaSalle - Evaluation of Proposed Changes RS-18-009, License Amendment Request for Temporary Extensions to Technical Specifications Supporting Maintenance on Portions of the Core Standby Cooling System2018-01-24024 January 2018 License Amendment Request for Temporary Extensions to Technical Specifications Supporting Maintenance on Portions of the Core Standby Cooling System RS-17-127, Submittal of Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control.2017-12-13013 December 2017 Submittal of Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control. RS-17-137, Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements2017-11-0808 November 2017 Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements RS-17-049, Application to Revise Technical Specifications to Adopt TSTF-529 Clarify Use and Application Rules, Revision 4, Using the Consolidated Line Item Improvement Process2017-03-28028 March 2017 Application to Revise Technical Specifications to Adopt TSTF-529 Clarify Use and Application Rules, Revision 4, Using the Consolidated Line Item Improvement Process RS-16-225, Revised Request for License Amendment Regarding High Burnup Atrium-10 Partial Length Fuel Rods and Request for Exigent Review2016-11-0808 November 2016 Revised Request for License Amendment Regarding High Burnup Atrium-10 Partial Length Fuel Rods and Request for Exigent Review RS-16-191, License Amendment Request to Revise Technical Specifications 5.5.13, Primary Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2016-10-26026 October 2016 License Amendment Request to Revise Technical Specifications 5.5.13, Primary Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML16280A4022016-10-0606 October 2016 License Amendment Request - Supplement Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing. RS-16-198, Request for License Amendment Regarding High Burnup Atrium-10 Partial Length Fuel Rods2016-09-30030 September 2016 Request for License Amendment Regarding High Burnup Atrium-10 Partial Length Fuel Rods ML16209A2182016-07-26026 July 2016 Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Lnservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing. ML16036A3482016-02-0505 February 2016 Maintenance of Draft Supplemental Environmental Impact Statement at the Seneca Public Library in Regards to the Review of the LaSalle County Station License Renewal Application (TAC Nos. MF5567 and MF5568) RS-16-035, County, and Quad Cities - Request for License Amendment to Address Secondary Containment Access Openings2016-02-0303 February 2016 County, and Quad Cities - Request for License Amendment to Address Secondary Containment Access Openings RS-15-305, Corrections to the License Renewal Application Dated December 9, 20142015-12-0202 December 2015 Corrections to the License Renewal Application Dated December 9, 2014 RS-15-279, Request for License Amendment to Reduce the Reactor Steam Dome Pressure Specified in the Technical Specification 2.1.1, Reactor Core Sls.2015-11-19019 November 2015 Request for License Amendment to Reduce the Reactor Steam Dome Pressure Specified in the Technical Specification 2.1.1, Reactor Core Sls. RS-15-193, Responds to NRC Requests for Additional Information, Set 5, Dated July 7, 2015 Related to the License Renewal Application2015-08-0606 August 2015 Responds to NRC Requests for Additional Information, Set 5, Dated July 7, 2015 Related to the License Renewal Application RS-15-221, Revisions to License Renewal Application, Applicant'S Environmental Report - Operating License Renewal Stage2015-07-31031 July 2015 Revisions to License Renewal Application, Applicant'S Environmental Report - Operating License Renewal Stage 2023-05-25
[Table view] |
Text
Exelkn..
Exelon Generation www exeloncorp corn Nuclear 4300 Winfield Road Warrenville, IL60555 10 CFR 50.90 RS-02-167 October 21, 2002 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 LaSalle County Station, Units I and 2 Facility Operating License Nos. NPF-1I and NPF-18 NRC Docket Nos. 50-373 and 50-374
Subject:
Request for Amendment to Technical Specifications Justification for the Continued Use of Technical Specifications, Section 3.4.11, "RCS Pressure and Temperature (P/T) Limits" (EGC), LLC, hereby requests In accordance with 10 CFR 50.90, Exelon Generation Company NPF-1 8. Specifically, the following amendment to Facility Operating License Nos. NPF-1 I and pressure and temperature (P/T) limit curves in the proposed change requests that the current (P/T) Limits," remain Technical Specification (TS) 3.4.11, "RCS Pressure and Temperature change will allow sufficient time acceptable for use until December 15, 2004. The proposed "General Electric for the incorporation of the General Electric Topical Report NEDC-32983P, Evaluation," methodology into the Methodology for Reactor Pressure Vessel Fast Neutron Flux request.
with this P/T curves in TS 3.4.11. There are no TS page changes associated methodology for LaSalle EGC has performed new fluence calculations using NEDC-32983P calculations to the current County Station Units I and 2 and compared the results from these comparisons demonstrate that the TS 3.4.11 P/T curves. The results of the fluence calculation 15.7 Effective Full Power Years current PIT curves in TS 3.4.11 remain bounding until at least approximately operating time was (EFPY). As of June 1, 2002, LaSalle County Station Unit I factor, a 100% capacity 11.6 EFPY and Unit 2 was approximately 11.0 EFPY. Considering 15.7 EFPY will not be reached on either unit until after June 2006.
change to TS 3.4.11 in EGC is currently scheduled to submit to the NRC a proposed methodology to November of 2002. The proposed changes will utilize NEDC-32983P Units 1 and 2.
recalculate the PIT curves in TS 3.4.11 for LaSalle County Station
October 21, 2002 U. S. Nuclear Regulatory Commission Page 2 The information supporting the proposed change is subdivided as follows.
Attachment 1 is the notarized affidavit.
Attachment 2 provides our evaluation supporting the proposed changes.
The proposed change has been reviewed by the LaSalle County Station Plant Operations Review Committee (PORC) and approved by the Nuclear Safety Review Board (NSRB) in accordance with the Quality Assurance Program.
EGC is notifying the State of Illinois of this application for amendment by transmitting a copy of this letter and its attachments to the designated State Official.
We request approval of the proposed changes by December 1, 2002 with an implementation period of 30 days.
Should you have any questions concerning this submittal, please contact Mr. T. W. Simpkin at (630) 657-2821.
Since ely, Keith R. Jury Director - Licensing Mid-West Regional Operating Group Attachments: . Notarized Affidavit . Licensee's Evaluation cc: Regional Administrator - NRC Region III NRC Project Manager, NRR - LaSalle County Station NRC Senior Resident Inspector- LaSalle County Station Office of Nuclear Facility Safety - Illinois Department of Nuclear Safety
ATTACHMENT I Affidavit STATE OF ILLINOIS )
COUNTY OF DUPAGE
)
IN THE MATTER OF:
)
EXELON GENERATION COMPANY (EGC), LLC ) Docket Numbers LASALLE COUNTY STATION - UNIT 1 and UNIT 2 ) 50-373 and 50-374
SUBJECT:
Request for Amendment to Technical Specifications Justification for the Continued Use of Technical Specifications, Section 3.4.11, "RCS Pressure and Temperature (PIT) Limits" It AFFIDAVIT I affirm that the content of this transmittal is true and correct to the best of my knowledge, information, and belief.
Keith R. Jury Director - Licensing Mid-West Regional Operating Group Subscribed and sworn to before me, a Notary Public in and for the State above named, this Z/ day of S1y of2002 SEALr NoaryP lic91ý coOFFICIAL TIOTHYA BA
~rmmON W= Prnm
ATTACHMENT 2 Evaluation of Proposed Change Page 1 of 8
1.0 INTRODUCTION
2.0 DESCRIPTION
OF PROPOSED AMENDMENT
3.0 BACKGROUND
4.0 REGULATORY REQUIREMENTS & GUIDANCE
5.0 TECHNICAL ANALYSIS
6.0 REGULATORY ANALYSIS
7.0 NO SIGNIFICANT HAZARDS CONSIDERATION (NSHC)
8.0 ENVIRONMENTAL CONSIDERATION
9.0 PRECEDENT
10.0 REFERENCES
ATTACHMENT 2 Evaluation of Proposed Change Page 2 of 8
1.0 INTRODUCTION
In accordance with 10 CFR 50.90, Exelon Generation Company (EGC), LLC, hereby requests the following amendment to Facility Operating License Nos. NPF-1 1 and NPF
- 18. Specifically, the proposed change requests that the current pressure and temperature (P/T) limit curves in Technical Specification (TS) 3.4.11, "RCS Pressure and Temperature (P/T) Limits," remain acceptable for use until December 15, 2004. The proposed change will allow sufficient time for the incorporation of the General Electric Topical Report NEDC-32983P, "General Electric Methodology for Reactor Pressure Vessel Fast Neutron Flux Evaluation," methodology into the P/T curves in TS 3.4.11.
There are no TS page changes associated with this request.
EGC has performed new fluence calculations using NEDC-32983P methodology for LaSalle County Station Units 1 and 2 and compared the results from these calculations to the current TS 3.4.11 PIT curves. The results of the fluence calculation comparisons demonstrate that the current PIT curves in TS 3.4.11 remain valid until at least 15.7 Effective Full Power Years (EFPY). As of June 1, 2002, LaSalle County Station Unit 1 operating time was approximately 11.6 EFPY and Unit 2 was approximately 11.0 EFPY.
Considering a 100% capacity factor, 15.7 EFPY will not be reached on either unit until after June 2006.
EGC is currently scheduled to submit to the NRC a proposed change to TS 3.4.11 in November of 2002. The proposed changes will utilize NEDC-32983P methodology to calculate the P/T curves in TS 3.4.11 for LaSalle County Station Units 1 and 2.
2.0 DESCRIPTION
OF PROPOSED AMENDMENT The proposed change requests that the current LaSalle County Station, Units 1 and 2, Pressure and Temperature (P/T) Limit curves in TS 3.4.11 remain acceptable for use until December 15, 2004.
3.0 BACKGROUND
EGC, formerly Commonwealth Edison (CornEd) Company, in Reference 1, requested changes to Technical Specifications (TS) Section 3/4.4.6, "Pressure/Temperature Limits, Reactor Coolant System," for LaSalle County Station Units 1 and 2. The proposed changes revised the PIT limits for the Reactor Pressure Vessel (RPV) of each unit to a maximum of 32 EFPY.
During teleconferences between members of the NRC and EGC in support of the review of the proposed TS changes, the NRC stated that the neutron fluence calculations used to develop the revised P/T limits were not consistent with the guidance contained in Draft Regulatory Guide DG-1053, "Calculational and Dosimetry Methods for Determining Pressure Vessel Neutron Fluence," dated September 1999. EGC in Reference 2
ATTACHMENT 2 Evaluation of Proposed Change Page 3 of 8 requested the NRC to approve the proposed changes to TS 3/4.4.6 until December 15, 2002 to allow sufficient time to resolve this issue. The NRC in Reference 3 approved the proposed changes to TS 3/4.4.6 for an interim period not to exceed December 15, 2002.
In March 2001, Draft Guide DG-1 053 was approved as Regulatory Guide (RG) 1.190, "Calculational and Dosimetry Methods for Determining Pressure Vessel Neutron Fluence." The NEDC-32983P methodology is consistent with the guidance contained in RG 1.190. In a letter dated September 14, 2001, the NRC approved NEDC-32983P for use by licensees.
1 4.0 REGULATORY REQUIREMENTS & GUIDANCE 10 CFR 50.36(c)(2)(ii)(B), "Criterion 2," requires that a process variable, design feature, or operating restriction that is an initial condition of a design basis accident or transient analysis that either assumes the failure of or presents a challenge to the integrity of a fission product barrier, must be included in a licensee's TS.
5.0 TECHNICAL ANALYSIS
5.1 Design Bases EGC has performed new fluence calculations using NEDC-32983P methodology for LaSalle County Station Units 1 and 2. The results of the calculations are contained in Reference 5 and are as follows.
" The 32 EFPY fluences calculated with the NEDC-32983P methodology are greater than the fluences used in the development of the current 32 EFPY P/T limits in the LaSalle County Station TS. TS 3/4.4.6 was renumbered to TS 3.4.11, "RCS Pressure and Temperature (P/T) Limits," during the conversion of LaSalle County Station TS to the Improved Technical Specification format.
" As shown in Attachment A to Reference 4, the peak surface fluence used in the development of the Unit 1 current 32 EFPY P/T limits is 5.0E17 neutrons per centimeter squared (n/cm 2) and the resultant 1/4 T fluence is 3.5E17 n/cm 2. As shown in the attachments to Reference 5, the Unit 1 peak surface flux determined in the proposed calculation is 1.01 E09 neutrons per centimeter squared - second (n/cm 2-s). A conservative estimate of the neutron surface fluence at various points in plant life can be obtained by multiplying the calculated flux by the appropriate EFPY. This approach is conservative in that it assumes that the calculated flux value has been present since initial plant operation and does not account for the reduced flux that would have been experienced prior to power uprate and the switch to 24 month fuel cycles. Using this method, the peak surface
ATTACHMENT 2 Evaluation of Proposed Change Page 4 of 8 fluence of 5.0E17 n/cm 2 used in development of the current P/T limits will occur at approximately 15.7 EFPY.
As shown in Attachment A to Reference 4, the peak surface 6.03E1fluence used 2in the Unit 2 current 32 EFPY P/T limits is 7 n/cm the development of and the resultant 1/4 T fluence is 4.2E17 n/cm 2 . As shown in the attachments to Reference 5, the Unit 2 peak surface flux determined in the proposed calculation is 1.08E09 n/cm 2-s. Using the method described 2
above, the peak surface fluence of 6.03E17 n/cm used in development of the current P/T limits will occur at approximately 17.7 EFPY.
Based on the above, the current P/T curves in TS 3.4.11 for LaSalle County Station Units 1 and 2 remain valid until at least 15.7 EFPY. As of June 1, 2002, LaSalle County Station Unit 1 operating time was approximately 11.6 EFPY and Unit 2 was approximately 11.0 EFPY. Considering a 100% capacity factor, 15.7 EFPY will not be reached on either unit until after June 2006.
EGC is currently scheduled to submit to the NRC proposed changes to TS 3.4.11 in November of 2002. The proposed changes will utilize NEDC-32983P methodology to calculate the P/T curves in TS 3.4.11 for LaSalle County Station Units 1 and 2.
EGC requests that the current PIT curves in TS 3.4.11 remain acceptable for use until December 15, 2004, to allow sufficient time for the incorporation of the NEDC-32983P methodology into the P/T curves in TS 3.4.11 for LaSalle County Station Units 1 and 2. The request is based on the above information that using NEDC-32983P methodology, the current TS 3.4.11 P/T curves remain valid during this period of time.
5.2 Risk Information This submittal is not based on risk informed decision making.
ATTACHMENT 2 Evaluation of Proposed Change Page 5 of 8
6.0 REGULATORY ANALYSIS
The P/T limits are prescribed during normal operation to avoid encountering pressure, temperature, and temperature rate of change conditions that might cause undetected flaws to propagate and cause nonductile failure of the reactor coolant pressure boundary, a condition that is unanalyzed. Therefore, the PIT Limit Curves must be included in LaSalle County Station TS in accordance with 10 CFR 50.36(c)(2)(ii).
i 7.0 NO SIGNIFICANT HAZARDS CONSIDERATION EGC has evaluated the proposed change to the TS for LaSalle County Station, Unit 1 and Unit 2, and has determined that the proposed change does not involve a significant hazards consideration and is providing the following information to support a finding of no significant hazards consideration.
Does the change involve a significant increase in the probability or consequences of an accident previously evaluated?
Response: No The proposed change requests for LaSalle County Station, Units 1 and 2, that the current pressure and temperature (PiT) limit curves in TS 3.4.11, "RCS Pressure and Temperature (PiT) Limits," remain acceptable for use until December 15, 2004. The proposed change is to allow sufficient time for the incorporation of the General Electric Topical Report NEDC-32983P, "General Electric Methodology for Reactor Pressure Vessel Fast Neutron Flux Evaluation,"
methodology into the P/T curves in TS 3.4.11. NEDC-32983P methodology has been previously approved by the NRC for use by licensees. The PiT limits are prescribed during normal operation to avoid encountering pressure, temperature, and temperature rate of change conditions that might cause undetected flaws to propagate and cause nonductile failure of the reactor coolant pressure boundary, a condition that is unanalyzed. Thus, the proposed change does not have any affect on the probability of an accident previously evaluated.
The P/T curves are used as operational limits during heatup or cooldown maneuvering, when pressure and temperature indications are monitored and compared to the applicable curve to determine that operation is within the allowable region. The P/T curves provide assurance that station operation is consistent with previously evaluated accidents. Thus, the radiological consequences of any accident previously evaluated are not increased.
Therefore, the proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated.
ATTACHMENT 2 Evaluation of Proposed Change Page 6 of 8 Does the change create the possibility of a new or different kind of accident from any accident previously evaluated?
Response: No The proposed change does not change the control parameters governing unit operation or the response of plant equipment to transient conditions. The proposed change does not introduce any new equipment, modes of system operation or failure mechanisms.
Therefore, the proposed change does not create the possibility of a new or different kind of accident from any previously evaluated.
Does the change involve a significant reduction in a margin of safety?
Response: No The proposed change for LaSalle County Station is to allow sufficient time for the incorporation of the General Electric Topical Report NEDC-32983P methodology into the P/T curves in TS 3.4.11. NEDC-32983P methodology has been previously approved by the NRC for use by licensees.
EGC has performed new fluence calculations using NEDC-32983P methodology for LaSalle County Station Units 1 and 2 and compared the results from these calculations to the current TS 3.4.11 .P/T curves. The results of the fluence calculation comparisons demonstrate that the current P/T curves in TS 3.4.11 remain valid until at least 15.7 Effective Full Power Years (EFPY). As of June 1, 2002, LaSalle County Station Unit 1 operating time was approximately 11.6 EFPY and Unit 2 was approximately 11.0 EFPY. Considering a 100% capacity factor, 15.7 EFPY will not be reached on either unit until after June 2006.
EGC is currently scheduled to submit to the NRC a proposed change to TS 3.4.11 in the November of 2002. The proposed changes will utilize NEDC 32983P methodology to calculate the P/T curves in TS 3.4.11 for LaSalle County Station Units 1 and 2.
The request that the current P/T curves remain valid until December 15, 2004, is based on the above information that using NEDC-32983P methodology, the current TS 3.4.11 P/T curves remain valid during this period of time.
Therefore, the proposed changes do not involve a significant reduction in a margin of safety.
ATTACHMENT 2 Evaluation of Proposed Change Page 7 of 8 Based upon the above, EGC concludes that the proposed amendment presents no significant hazards consideration under the standards set forth in 10 CFR50.92(c), and, accordingly, a finding of "no significant hazards consideration" is justified.
8.0 ENVIRONMENTAL CONSIDERATION
A review has determined that the proposed amendment would change a requirement with respect to installation or use of a facility component located within the restricted area, as defined in 10 CFR 20, or would change an inspection or surveillance requirement. However, the proposed amendment does not involve (i) a significant hazards consideration, (ii) a significant change in the types or significant increase in the amounts of any effluent that may be released offsite, or (iii) a significant increase in individual or cumulative occupational radiation exposure. Accordingly, the proposed amendment meets the eligibility criterion for categorical exclusion set forth in 10 CFR 51.22(c)(9). Therefore, pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the proposed amendment.
9.0 PRECEDENT The proposed amendment incorporates into the LaSalle County Station a change that is specific to LaSalle County Station, and therefore, this proposed amendment does not rely upon the issuance of amendments to other licensees.
10.0 REFERENCES
(1) Letter from R.M. Krich (CoinEd) to U. S. NRC, "Application for Amendment to Appendix A, Technical Specifications, Section 3/4.4.6, "Pressure Temperature Limits, Reactor Coolant System," and Request for Exemption from 10 CFR 50.60, "Acceptance Criteria for Fracture Prevention Measures for Lightwater Nuclear Power Reactors for Normal Operation," dated February 29, 2000 (2) Letter from Charles G. Pardee (CoinEd) to U. S. NRC, "Supplement to Application for Amendment to Appendix A, Technical Specifications, Section 3/4.4.6, "Pressure Temperature Limits, Reactor Coolant System," and Request for Exemption from 10 CFR 50.60, "Acceptance Criteria for Fracture Prevention Measures for Lightwater Nuclear Power Reactors for Normal Operation," dated August 18, 2000 (3) Letter from Donna M. Skay (U. S. NRC) to 0. D. Kingsley (CoinEd), "LaSalle County Station, Units 1 and 2 - Issuance of Amendments (TAC Nos. MA8403 and MA8404)," dated November 8, 2000
ATTACHMENT 2 Evaluation of Proposed Change Page 8 of 8 (4) Letter from Charles G. Pardee (CornEd) to U. S. NRC, "Revised General Electric Nuclear Energy Reports, "Pressure Temperature Curves for CoinEd LaSalle Unit 1" and "Pressure Temperature Curves for CoinEd LaSalle Unit 2" dated June 26, 2000 (5) Letter from T. Simpkin (Exelon Generation Company, LLC) to USNRC, "Justification for the Continued Use of Technical Specifications, Section 3.4.11, "RCS Pressure and Temperature (P/T) Limits," dated July 19, 2002