RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling | 25 May 2023 | Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling | Hydrostatic Surveillance Frequency Control Program |
ML23073A218 | 22 March 2023 | Issuance of Amendment No. 258 to Renewed Facility Operating Licenses Exigent Amendment to Revise Design Basis Related to Seismic Requirements | Safe Shutdown Half scram Fire Barrier Anticipated operational occurrence Safe Shutdown Earthquake Temporary Modification Abnormal operational transient Earthquake |
RS-23-048, Exigent Amendment Request to Revise Design Basis Related to Seismic Requirements | 7 March 2023 | Exigent Amendment Request to Revise Design Basis Related to Seismic Requirements | Half scram Anticipated operational occurrence Safe Shutdown Earthquake Temporary Modification Abnormal operational transient Earthquake |
RS-23-006, Supplemental Information Regarding License Amendment Request Relocation of Pressure and Temperature Limit Curves to the Pressure and Temperature Limits Report | 10 January 2023 | Supplemental Information Regarding License Amendment Request Relocation of Pressure and Temperature Limit Curves to the Pressure and Temperature Limits Report | Hydrostatic Pressure and Temperature Limits Report |
ML22332A449 | 10 November 2022 | License Amendment Request - Relocation of Pressure and Temperature Limit Curves to the Pressure and Temperature Limits Report | Anticipated operational occurrence Hydrostatic Abnormal operational transient Pressure and Temperature Limits Report |
RS-22-092, Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration | 3 October 2022 | Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration | Reactor Vessel Water Level |
RS-22-004, Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements | 4 January 2022 | Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements | Process Control Program Pressure Boundary Leakage |
ML21277A193 | 16 November 2021 | Enclosure 2, Draft Conforming License Amendments | Safe Shutdown Fire Barrier Internal Flooding Probabilistic Risk Assessment Operating Basis Earthquake Cyber Security Aging Management Annual Radioactive Effluent Release Report Safeguards Contingency Plan Preemption Authority License Renewal Subsequent License Renewal Fuel cladding Liquid penetrant Fire Protection Program Scaffolding Unidentified leakage Power Uprate |
RS-21-115, Supplemental Information for License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies, with Proposed Changes to Technical Specifications 4.3.1 and 5.6.5 | 4 November 2021 | Supplemental Information for License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies, with Proposed Changes to Technical Specifications 4.3.1 and 5.6.5 | Earthquake |
JAFP-21-0089, Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position | 27 September 2021 | Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position | Safe Shutdown Reactor Vessel Water Level Ultimate heat sink Stroke time Water Inventory Control Surveillance Frequency Control Program Operability Determination Control of Heavy Loads Fuel cladding Recently irradiated fuel Scaffolding |
RS-21-064, License Amendment Request Re New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies - Cover Letter | 30 June 2021 | License Amendment Request Re New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies - Cover Letter | |
RS-21-039, Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments | 25 March 2021 | Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments | Safe Shutdown Safety Limit Minimum Critical Power Ratio Fire Barrier Internal Flooding Probabilistic Risk Assessment Operating Basis Earthquake Cyber Security Aging Management Safeguards Contingency Plan Preemption Authority License Renewal Subsequent License Renewal Fuel cladding Liquid penetrant Fire Protection Program Coast down Unidentified leakage Power Uprate |
ML21057A273 | 25 February 2021 | Application for Order Approving License Transfers and Proposed Conforming License Amendments | Decommissioning Funding Plan |
RS-20-115, Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements | 18 November 2020 | Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements | Reactor Vessel Water Level Water Inventory Control Surveillance Frequency Control Program Fuel cladding Recently irradiated fuel Offsite Circuit Scaffolding |
RS-20-087, Request for a License Amendment to LaSalle County Station, Units 1 and 2, Technical Specification 3.7.3, Ultimate Heat Sink | 17 July 2020 | Request for a License Amendment to LaSalle County Station, Units 1 and 2, Technical Specification 3.7.3, Ultimate Heat Sink | Safe Shutdown Ultimate heat sink Surveillance Frequency Control Program |
RS-20-031, License Amendment Request - Application to Adopt Technical Specification Task Force (TSTF) Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2 .5 and TS 3.6 .3.2, Using the Consolidated Line Item Improvement Process | 30 April 2020 | License Amendment Request - Application to Adopt Technical Specification Task Force (TSTF) Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2 .5 and TS 3.6 .3.2, Using the Consolidated Line Item Improvement Process | Surveillance Frequency Control Program |
RS-20-011, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors | 31 January 2020 | Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors | Hot Short Safe Shutdown Ultimate heat sink Tornado Missile Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Incorporated by reference Fukushima Dai-Ichi Large early release frequency Flooding Focused Evaluation |
RS-20-009, Application to Revise LaSalle County Station Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b | 31 January 2020 | Application to Revise LaSalle County Station Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b | |
RS-19-044, License Amendment Request - Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions | 28 August 2019 | License Amendment Request - Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions | Safe Shutdown Fire Protection Program |
RS-19-069, License Amendment Request Supporting Emergency Plan Emergency Action Level Change (EAL RAL3) | 23 August 2019 | License Amendment Request Supporting Emergency Plan Emergency Action Level Change (EAL RAL3) | Safe Shutdown |
JAFP-19-0067, Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability | 27 June 2019 | Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability | Fire Barrier Tornado Missile Internal Flooding Incorporated by reference Turbine Missile |
RS-19-040, Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program | 25 June 2019 | Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program | Shutdown Margin Surveillance Frequency Control Program Pressure Boundary Leakage |
ML19036A586 | 21 March 2019 | Issuance of Amendments to Revise the Emergency Response Organization Staffing Requirements | Health Physics Network Severe Accident Management Guideline Minimum staff Fire Protection Program |
RS-19-003, Application to Adopt TSTF-564, Safety Limit Mcpr. | 1 February 2019 | Application to Adopt TSTF-564, Safety Limit Mcpr. | Shutdown Margin Reactor Vessel Water Level Safety Limit Minimum Critical Power Ratio Anticipated operational occurrence Post Accident Monitoring Hydrostatic Abnormal operational transient Pressure and Temperature Limits Report Surveillance Frequency Control Program Annual Radiological Environmental Operating Report Process Control Program Feedwater Controller Failure Fuel cladding |
RS-18-130, Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO | 1 November 2018 | Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO | Safe Shutdown Post Accident Monitoring Offsite Circuit |
RS-18-020, Application to Revise Technical Specifications to Modify the APRM Channel Adjustment Surveillance Requirement | 15 June 2018 | Application to Revise Technical Specifications to Modify the APRM Channel Adjustment Surveillance Requirement | Surveillance Frequency Control Program |
RS-18-032, Application to Adopt TSTF-372, Addition of LCO 3.0.8, Inoperability of Snubbers | 25 April 2018 | Application to Adopt TSTF-372, Addition of LCO 3.0.8, Inoperability of Snubbers | |
RS-18-028, License Amendment Request to Remove Operating Mode Restrictions for Performing Surveillance Testing of the Division 3 Battery and High Pressure Core Spray Diesel Generator | 19 April 2018 | License Amendment Request to Remove Operating Mode Restrictions for Performing Surveillance Testing of the Division 3 Battery and High Pressure Core Spray Diesel Generator | Safe Shutdown Reactor Vessel Water Level Surveillance Frequency Control Program Battery sizing Maintenance Rule Program Fuel cladding Offsite Circuit |
RS-17-161, Fleet License Amendment Request to Relocate Technical Specification Unit/Facility/Plant Staff Qualification ANSI N18.1-1971 and ANSl/ANS-3.1-1978 Requirements to the Exelon Quality Assurance Topical Report (QATR) | 1 March 2018 | Fleet License Amendment Request to Relocate Technical Specification Unit/Facility/Plant Staff Qualification ANSI N18.1-1971 and ANSl/ANS-3.1-1978 Requirements to the Exelon Quality Assurance Topical Report (QATR) | Coatings Fire Protection Program |
RS-18-023, License Amendment Request to Revise the Technical Specifications (TS) Surveillance Requirement (SR) 3.4.4.1 to Revise the Lower Setpoint Tolerances for Safety/Relief Valves (S/Rvs) | 27 February 2018 | License Amendment Request to Revise the Technical Specifications (TS) Surveillance Requirement (SR) 3.4.4.1 to Revise the Lower Setpoint Tolerances for Safety/Relief Valves (S/Rvs) | Anticipated operational occurrence |
RS-18-021, Exelon Generation Co, LLC - License Amendment Request for Approval of Changes to Emergency Plan EP-AA-1000 Staffing Requirements | 31 January 2018 | Exelon Generation Co, LLC - License Amendment Request for Approval of Changes to Emergency Plan EP-AA-1000 Staffing Requirements | Minimum staff |
RS-18-021, License Amendment Request for Approval of Changes to Emergency Plan EP-AA-1000 Staffing Requirements | 31 January 2018 | License Amendment Request for Approval of Changes to Emergency Plan EP-AA-1000 Staffing Requirements | Minimum staff |
ML18053A175 | 31 January 2018 | Attachment 5A - LaSalle Marked-up Emergency Plan EP-AA-1000 Pages | Safe Shutdown Fitness for Duty Health Physics Network Nuclear Accident Reporting System Severe Accident Management Guideline Minimum staff |
ML18053A176 | 31 January 2018 | Attachment 5B - LaSalle Clean Emergency Plan EP-AA-1000 Pages | Nuclear Accident Reporting System Severe Accident Management Guideline Minimum staff |
ML18053A184 | 31 January 2018 | Enclosure 5 - LaSalle - Evaluation of Proposed Changes | Safe Shutdown Fitness for Duty Cyber Security Severe Accident Management Guideline Fuel cladding Minimum staff |
RS-18-009, License Amendment Request for Temporary Extensions to Technical Specifications Supporting Maintenance on Portions of the Core Standby Cooling System | 24 January 2018 | License Amendment Request for Temporary Extensions to Technical Specifications Supporting Maintenance on Portions of the Core Standby Cooling System | Safe Shutdown Ultimate heat sink Anticipated operational occurrence Surveillance Frequency Control Program Offsite Circuit |
RS-17-127, Submittal of Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control. | 13 December 2017 | Submittal of Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control. | Safe Shutdown Shutdown Margin Reactor Vessel Water Level Ultimate heat sink Stroke time Water Inventory Control Post Accident Monitoring Hydrostatic Operating Basis Earthquake Qualified Offsite Circuit Surveillance Frequency Control Program Fuel cladding Pressure Boundary Leakage Offsite Circuit Scaffolding |
RS-17-137, Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements | 8 November 2017 | Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements | Shutdown Margin Surveillance Frequency Control Program Recently irradiated fuel |
RS-17-049, Application to Revise Technical Specifications to Adopt TSTF-529 Clarify Use and Application Rules, Revision 4, Using the Consolidated Line Item Improvement Process | 28 March 2017 | Application to Revise Technical Specifications to Adopt TSTF-529 Clarify Use and Application Rules, Revision 4, Using the Consolidated Line Item Improvement Process | Safe Shutdown Time of Discovery Missed surveillance |
RS-16-225, Revised Request for License Amendment Regarding High Burnup Atrium-10 Partial Length Fuel Rods and Request for Exigent Review | 8 November 2016 | Revised Request for License Amendment Regarding High Burnup Atrium-10 Partial Length Fuel Rods and Request for Exigent Review | Functionality Assessment |
RS-16-191, License Amendment Request to Revise Technical Specifications 5.5.13, Primary Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies | 26 October 2016 | License Amendment Request to Revise Technical Specifications 5.5.13, Primary Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies | Hot Short Safe Shutdown High winds Mission time Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Coatings Incorporated by reference Aging Management Surveillance Frequency Control Program Large early release frequency Moisture barrier Turbine Missile Scaffolding Grace period |
ML16280A402 | 6 October 2016 | License Amendment Request - Supplement Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing. | Shutdown Margin Reactor Vessel Water Level Packing leak High Radiation Area Stroke time Hydrostatic Squib Surveillance Frequency Control Program Excess Flow Check Valve Power Operated Valves Pressure Boundary Leakage Recently irradiated fuel Power change Unidentified leakage |
RS-16-198, Request for License Amendment Regarding High Burnup Atrium-10 Partial Length Fuel Rods | 30 September 2016 | Request for License Amendment Regarding High Burnup Atrium-10 Partial Length Fuel Rods | |
ML16209A218 | 26 July 2016 | Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Lnservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing. | Shutdown Margin Reactor Vessel Water Level Packing leak High Radiation Area Stroke time Hydrostatic Squib Incorporated by reference Missed surveillance Surveillance Frequency Control Program Excess Flow Check Valve Power Operated Valves Pressure Boundary Leakage Recently irradiated fuel Power change Unidentified leakage |
ML16036A348 | 5 February 2016 | Maintenance of Draft Supplemental Environmental Impact Statement at the Seneca Public Library in Regards to the Review of the LaSalle County Station License Renewal Application (TAC Nos. MF5567 and MF5568) | |
RS-16-035, County, and Quad Cities - Request for License Amendment to Address Secondary Containment Access Openings | 3 February 2016 | County, and Quad Cities - Request for License Amendment to Address Secondary Containment Access Openings | Surveillance Frequency Control Program |
RS-15-305, Corrections to the License Renewal Application Dated December 9, 2014 | 2 December 2015 | Corrections to the License Renewal Application Dated December 9, 2014 | Aging Management Pressure Boundary Leakage |
RS-15-279, Request for License Amendment to Reduce the Reactor Steam Dome Pressure Specified in the Technical Specification 2.1.1, Reactor Core Sls. | 19 November 2015 | Request for License Amendment to Reduce the Reactor Steam Dome Pressure Specified in the Technical Specification 2.1.1, Reactor Core Sls. | Reactor Vessel Water Level Anticipated operational occurrence Minimum Critical Power Ratio Fuel cladding |
RS-15-193, Responds to NRC Requests for Additional Information, Set 5, Dated July 7, 2015 Related to the License Renewal Application | 6 August 2015 | Responds to NRC Requests for Additional Information, Set 5, Dated July 7, 2015 Related to the License Renewal Application | Non-Destructive Examination Fire Barrier Weld Overlay Post Accident Monitoring Coatings VT-2 Aging Management Flow Accelerated Corrosion Stress corrosion cracking Eddy Current Testing License Renewal Liquid penetrant Pressure boundary leak Thermal fatigue |
RS-15-221, Revisions to License Renewal Application, Applicant'S Environmental Report - Operating License Renewal Stage | 31 July 2015 | Revisions to License Renewal Application, Applicant'S Environmental Report - Operating License Renewal Stage | Ultimate heat sink Zebra Mussel Annual Radiological Environmental Operating Report License Renewal Earthquake Environmental Justice |