RIS 2006-23, Post-Tornado Operability of Ventilating and Air-Conditioning (VAC) Systems Housed in Emergency Diesel Generator (EDG) Rooms

From kanterella
Jump to navigation Jump to search
Post-Tornado Operability of Ventilating and Air-Conditioning (VAC) Systems Housed in Emergency Diesel Generator (EDG) Rooms
ML061720371
Person / Time
Issue date: 12/06/2006
Revision: 0
From: Case M J
NRC/NRR/ADRA/DPR
To:
Hartzman M, NRC/NRR/DE/EMEB, 415-2755
References
RIS-06-023
Download: ML061720371 (4)


December 6, 2006

NRC REGULATORY ISSUE SUMMARY 2006-23POST-TORNADO OPERABILITY OF VENTILATING ANDAIR-CONDITIONING SYSTEMS HOUSED IN EMERGENCY DIESELGENERATOR ROOMS

ADDRESSEES

All holders of operating licenses for nuclear power reactors, except those who havepermanently ceased operations and have certified that fuel has been permanently removed from the reactor vessel.

INTENT

The U.S. Nuclear Regulatory Commission (NRC) is issuing this Regulatory Issue Summary(RIS) to notify licensees of its regulatory position regarding loading effects caused by natural phenomena to safety related systems and components housed inside a structure partially exposed to the outside environment, specifically ventilating and air-conditioning (VAC) systems housed in the Emergency Diesel Generator (EDG) roo NRC expects addressees to review this RIS for applicability to their facilities and consider actions as appropriat This RISrequires no action or written response from addressees.

BACKGROUND INFORMATION

During an NRC inspection in May 2005, inspectors questioned the ability of a licensee's VACsystem and other components in an EDG room to operate safely during and after a tornado even Specifically, the NRC staff questioned whether wind pressures and differential pressures caused by a tornado passing directly over the EDG building could adversely affect safety related systems and components inside the EDG building.In response to the NRC questions, the licensee conducted an industrywide survey revealingapproximately 25 plants with a licensing basis similar to their ow In addition, the licensee performed rapid depressurization and re-pressurization analyses (venting) of the EDG room and large deformation inelastic-stress calculations of potentially vulnerable duct segment The licensee's analyses demonstrated and provided assurance that the structural integrity of the VAC system ducts in the EDG room would be maintained during the tornado event, and that afterward the VAC system would be able to perform its intended functio The staff reviewed the analyses and concluded that the integrity of the licensee's VAC system is adequate.ML061720371 RIS 2006-23