RA-21-0113, 6 to Radiological Emergency Response Plan

From kanterella
Jump to navigation Jump to search
6 to Radiological Emergency Response Plan
ML21088A245
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 03/27/2021
From: Salazar S
Duke Energy Progress
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RA-21-0113
Download: ML21088A245 (3)


Text

( ') DUKE Brunswick Nuclear Plant 8470 River Rd SE ENERGYtt Southport, NC 28461 10 CFR 50.4(b)(5)(ii}

March 27, 2021 10 CFR 50.54(q)(5)

Serial: RA-21-0113 10 CFR 72.4 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Subject:

Brunswick Steam Electric Plant, Unit Nos. 1 and 2 Renewed Facility Operating License Nos. DPR-71 and DPR-62 Docket Nos. 50-325 and 50-324 Revision to Radiological Emergency Response Plan Ladies and Gentlemen:

In accordance with 10 CFR 50.4(b)(5)(ii), 10 CFR 50.54(q}(5), and 10 CFR 72.4, Duke Energy Progress, LLC (Duke Energy), is submitting an analysis summary for Revision 96 of 0ERP, Radiological Emergency Response Plan (ERP).

Duke Energy has evaluated this revision in accordance with 10 CFR 50.54(q) and determined that it does not result in a reduction in the effectiveness of the ERP. The ERP continue s to meet the standards of 10 CFR 50.47(b) and the requirements of 10 CFR 50, Appendix E.

This docume nt contains no regulatory commitments.

Please refer any questions regarding this submittal to Mr. Stephen Yodersmith, Brunswi ck Regulatory Affairs, at (910) 832-2568.

Sincerely, ri alazar Manage r - Nuclear Support Services Brunswick Steam Electric Plant

U.S. Nuclear Regulatory Commission Page 2 of 2

Enclosure:

10 CFR 50.54(q)(5) Summary for 0ERP, Revision 96 cc (with Enclosure):

Ms. Laura Dudes, NRC Regional Administrator, Region II Mr. Andrew Hon, NRC Project Manager Mr. Gale Smith, NRC Senior Resident Inspector Mr. John Nguyen, NRC Director Spent Fuel Management Division, NRC Nuclear Material Safety / Safeguards Office Chair - North Carolina Utilities Commission

RA-21-0113 Enclosure Page 1 of 1 10 CFR 50.54(q)(5) Summary for 0ERP, Revision 96 In accordance with 10 CFR 50.54(q)(5), Duke Energy Progress, LLC, is providing a summary of the revision analysis for 0ERP, Radiological Emergency Response Plan (ERP), Revision 96, which became effective on March 17, 2021.

In addition to minor editorial changes, changes to the ERP are associated with removing the Generation Supply Chain Liaison (GSCL) from the Emergency Plan and relocating GSCL functions, that were not previously duplicated, to other positions. These additional functions can be conducted without impacting the timeliness of other functions already assigned to these positions. The ERO continues to be staffed to augment initial response on a continuous basis.

The changes implemented by 0ERP, Revision 96, were evaluated in accordance with 10 CFR 50.54(q). The evaluation concluded that these changes do not result in a reduction in the effectiveness of the ERP; the ERP continues to meet the standards of 10 CFR 50.47(b) and the requirements of 10 CFR 50, Appendix E. As such, there is no impact to compliance, adherence, or effectiveness of the Emergency Plan.

Reference:

EREG AR Number 2373065