PY-CEI-NRR-2090, Special Rept:On 960814,channel of Post Accident Monitoring Instrumentation Was Inoperable 24 H More than OOS Time Allowed by Ts.Instrumentation Has Been Repaired & Operable

From kanterella
(Redirected from PY-CEI-NRR-2090)
Jump to navigation Jump to search
Special Rept:On 960814,channel of Post Accident Monitoring Instrumentation Was Inoperable 24 H More than OOS Time Allowed by Ts.Instrumentation Has Been Repaired & Operable
ML20117F026
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 08/26/1996
From: Shelton D
CENTERIOR ENERGY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
PY-CEI-NRR-2090, NUDOCS 9609030258
Download: ML20117F026 (3)


Text

  • H CENTERCOR

. ENERGY PERRY NUCLEAR POWER PLANT Mail Address: Donald C. SheltOn 10 CENTER ROAD SENIOR VICE PRESIDENT RR , O 10 44081 PERRY OHIO 44081 NUCLEAR (216) 259-3737 August 26,1996 PY-CEI/NRR-2090L United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Perry Nuclear Power Plant Docket No. 50-440 Special Report - Inoperable Post Accident Monitoring Instrumentation Gentlemen:

In accordance with the provisions of Perry Nuclear Power Plant Technical Specifications Section 3.3.3.1, the enclosed Special Report is being submitted to notify the NRC of an inoperable channel of Post Accident Monitoring instrumentation. The instrumentation has been repaired and is now operable. However, the instrumentation was iuoperable for approximately one day greater than the out-of-service time allowed by Technical Specifications, hence the enclosed 14 day Special Report.

If you have questions or require additional information, please contact Mr. James D. Kloosterman, Manager-Regulatory Affairs, at (216) 280-5833.

Very truly ours, I s

[ I

Enclosure:

Special Report - Inoperable Post Accident Monitoring Instrumentation y/ . ,

,q cc: NRC Region III Administrator /

NRC Resident Inspector NRC Project Manager [

l 9609030258 960826 PDR ADOCK 05000440 S Pcg {

Operot ng Companies Cleve!and Electnc illuminating Toledo Edison l

c i

PY-CEI/NRR-2090L g  ; Enclosure Page 1 of 2 SPECIAL REPORT INOPERABLE POST ACCIDENT MONITORING INSTRUMENTATION One channel of the Primary Containment /Drywell Area Gross Gamma Radiation monitors was inoperable for approximately one day greater than the out-of-service time I allowed by Technical Specifications. The instrumentation has been repaired and is now operable. Based on discussions with the vendor, coupled with troubleshooting activities, the apparent cause was considered to be a capacitive coupling in the mineral-insulated cable which masks the picoamp signal from the ion chamber at low level signals.  !

The primary purpose of the Post Accident Monitoring instrumentation is to display plant variables required to be monitored by the control room operators during accident scenarios. The Primary Containment /Drywell Area Gross Gamma Radiation monitors, which comprise a portion of the Post Accident Radiation Monitoring system (i.e., system  ;

1D19) instruments, are provided to monitor for potential significant radiation releases, and to aid in the assessment of any such releases for determining site emergency action levels.

Coincident with the implementation ofimproved Technical Specifications (TS) on July 14,1996, there were fewer Primary Containment /Drywell Area Gross Gamma Radiation channels operable than the " Required Channels" depicted in Table 3.3.3.1-1, " Post Accident Monitoring Instrumentation." In accordance with TS 3.3.3.1 Action B.1, if the j required channel is not restored within 30 days, a Special Report is required to be 3 submitted detailing root cause determination of the inoperable channel and proposed )

restorative actions. Direction contained in the Bases, indicate the Special Report shall be submitted within 14 days of entering Condition B.

Primary Containment /Drywell Area Gross Gamma Radiation monitor channel restoration was not completed until August 14,1996, approximately one day later than the out-of- ,

service time allowed by TS. Accordingly, this Special Report is being submitted to comply with TS Action B.I. Radiation monitoring of the containment atmosphere was adequately maintained during this time via the Atmosphere Radiation and Area Radiation monitors.

PNPP has two multi-channel Area Radiation monitors manufactured by Kamen Instrumentation Corporation, each consisting of one high range containment detector (ID19-N200A or ID19-N200B) and one high range drywell detector (ID19-N100A or ID19-N100B). Channel inoperability was identified by two separate and distinct indications on the associated recorder (1D19-R100) for the Division 1 Area monitor (ID19-K100). The first indication was observed on Division 1 Drywell Channel 1, (ID19-N100A) which was noted to have increased oscillating readings which were not reflected on the Division 2 Drywell Channel 1 monitor (ID19-K200). The indication

_ .- .- - . _ - _ - . . - _ . _ - - . - . .~. -_.

d i

w PY-CEI/NRR-2090L

{ , l Enclosure  ;

j Page 2 of 2 i l

l

! appeared to be electrical noise and troubleshooting commenced with attempting to isolate a potential shield break at the electrical connections. The associated connectors external  ;

to containment were disassembled, cleaned, and reassembled. Observed noise was 4

reduced and consistent with the opposite channel (1D19-N100B).

! l The second indication was the upscale reading on the associated recorder (ID19-R100)  ;

for Containment Channel 2 (1D19-N200A) for the Division 1 Containment Area monitor, i (1D19-K100). The associated channel in the Division 2 monitor (ID19-N200B) did not i reflect a similar increase nor did area surveys confirm the ir.dicated change.  ;

} Troubleshooting focused on the electrical connectors to determine if a false signal was j l being imposed on the detector signal. Disassembly and cleaning of the containment  !

I connections prior to the mineral-insulated cable junction appeared to have corrected the problem on August 8,1996; however, following a source check of the containment detector (1D19-N200A), the indication returned on August 9,1996. Based on discussions with the vendor, coupled with the response to the connector cleaning with j subsequent detector source check, the apparent cause was considered to be a capacitive

]

3 coupling in the mineral-insulated cable which masks the picoamp signal from the ion l l chamber at low level signals. The charge, caused by capacitive coupling, requires a period of time for the signal to increase above the default value unless extemally acted upon (e.g., a source check of the detector).

After disassembly and cleaning of the connectors internal to containment prior to the  ;

mineral-insulated cable junction, the indications for the ID19-N200A detector stabilized at the default value. The monitor was returned to operable status on August 14,1996.