4 r CENTER 00R ENERG1f PERRY NUCLEAR POWER PLANT Mail Address: Donald C. SheltOn 10 CENTER ROAD SENIOR VICE PRESIDENT RR , O 10 44081 PERRY, OHIO 44081 NUCLEAR (216) 259-3737 February 20, 1996 PY-CEI/NRR-2024L United States Nuclear Regulatory Commission .

Document Control Desk Washington, D.C. 20555 Perry Nuclear Power Plant Docket No. 50-440 1995 Annual Report Gentlemen:

  • Attached is the 1995 Annual Report for Perry Unit 1. This report is submitted in accordance with Technical Specifications 6.9.1.4 and 6.9.1.5 and fulfills ongoing commitments associated with Licensing Commitment 17 of USAR Appendix 1B.

If you have questions or require additional information, please contact Mr. James D. Kloosterman, Manager - Regulatory Affairs at (216) 280-5833.

Very tr yours, fk p

\ \

MN Attachment cc: NRC Project Manager NRC Resident Inspector Office NRC Region III REIRS Project Manager

~

9602230216 951231 PDR ADOCK 05000440 R PDR 230026 o

, ,e n . _,, , i al c_e_ (

wone s,

Attachment PY-CEI/NRR-2024L Page 1 of 5 I

CLEVELAND ELECTRIC ILLUMINATING COMPANY PERRY NUCLEAR POWER PLANT JANUARY 1 - DECEMBER 31, 1995 AleRIAL REPORT DOCKET NUMBER: 50-440 LICENSE NUMBER: NPF-58 l

Attachment PY-CEI/NRR-2024L Page 2 of 5 TABLE OF CONTENTS 1

Page I. Occupational Exposure Summary Report 3 II. F:fetyh lef Valve Challenges 5 III. Reactor Coolant System Specific Activity Analysis 5 IV. Silicone Sealant Inspections 5 I

1 4

h

Attachment PY-CEI/NRR-2024L Page 3 of 5 I. Occupational Radiation Exposure Summary Report Enclosed in this section is the 1995 Annual Occupational Exposure Summary Report required by Technical Specification 6.9.1.5.a of Appendix A to the Perry Unit 1 Operating License. The following work Categories were grouped as indicated below:

STATION Perry Nuclear Power Plant Department personnel.

UTILITY Perry Nuclear Assurance Department, Perry Nuclear Engineering Department, Perry Nuclear Services Department, and CEI support personnel.

OTHER Contractor, Consultant, Centerior, Davis-Besse, and other support personnel.

I l

1

1995 A7 DUAL EXP3&UR3 REPO2T **

RECULATSRY CUID3 1.16 APP 30 DIX A SUIMARY -

WORK CATEGORY ........--.............-.........-.............................................--.....

  • JOB CATEGORY l 9 PERSONS >= 0 MREM TOTAL MAN. REM l STATION UTILITY OTHER - STATION UTILITY OTHER REACTOR OPER. & S UE ? :"ILL AN CE MAINTENANCE 147 33 145 0.579 0.019 0.330 OPERATIONS 228 21 17 7.903 0.053 0.008

. HEALTH PHYSICS 63 12 45 2.827 0.041 0.549 SUPERVISORY 3 4 52 0.002 0.003 0.173 ENGINEERING 39 90 40 0.249 0.317 0.255 ROUTIRE MAINTENANCE MAINTENANCE 216 31 378 14.351 3.989 OPERATIONS 11.A10 324 49 44 3.033 0.327 0.191 HEALTH PHYSICS 66 15 62 2.871 0.828 2.476' SUPERVISORY 4 4 40 0.000 0.014 0.116 ENGINEERING $8 164 68 0.379 1.376 0.608 INSERVICE INSPECTION MAINTENANCE 2 0 4 0.010 0.000 0.000 OPERATIONS 5 2 0 0.007 0.005 0.000 HEALTH PHYSICS 8 0 0 0.035 0.000 0.000 SUPERVISORY 0 0 0 0.000 0.000 0.000 ENGINEERING O 7 2 0.000 0.146 0.000 SPECIAL MAINTENANCE MAINTENANCE 91 12 48 2.981 0.064 0.839 OPERATIONS 68 3 5 0.805 0.002 0.036 HEALTH PHYSICS 32 5 10 0.548 0.026 0.074 SUPERVISORY 0 0 0 0.000 0.000 0.000 ENGINEERING 8 16- 2 0.016 0.093 0.016 NASTE PROCESSING MAINTENANCE 74 28 36 0.409 0.337 0.201 OPERATIONS 78 5 11 2.046 0.001 0.045 HEALTH PHYSICS 49 14 33 0.531 0.426 0.237 SUPERVISORY O 1 4 0.000 0.000 0.000 ENGINEERING 13 12 4 0.037 0.001 0.000 REFUELING MAINTENAfdCE O O O 0.000 0.000 0.000 O P ER ATIOP:S 0 0 0 0.000 0.000 0.000 HEALTH PHYSICS 0 0 0 0.000 0.000 0.000 SUPERVISORY 0 0 0 0.000 0.000 0.000 .

ENGINEERING 0 0 0 0.000 0.000 0.000 TOTALS MAINTENANCE 530 154 611 I) 18.330 4.409 1).780 OPERATIONS 703 80 77 13.794 0.388 0.28C HEALTH PHYSICS 218 46 150 6.812 1.321 3.336 SUPERVISORY 7 9 96 0.002 0.017 0.289 ENGINEERING 118 289 116 0.681 1.933 0.879 GRAND TOTALS 1576 578 1050 39.619 8.068 17.564 Note: "I "8 MAN. REM is based on Direct Reading Dosimeter Readings. y >< rt gg g et 8 Persens is based on number of unique individuals signing in on any RNP in corresponding categories agD p g hr regardless of expost re received.

%5 O #

Nork Category is based on RNP Individual signed in on. Ph h

LM i Job Category and Station / Utility /Other is based on personnel record of person signin in on RNP. g N

C*

4

. l( .

Attachment PY-CEI/NRR-2024L Page 5 of 5  ;

i II. SAFETY / RELIEF VALVE CHALLENGES During the 1995 calendar year, there were no challenges to the nineteen (19) safety / relief valves installed in the Perry Nuclear Power Plant.

This information is submitted in accordance with Technical Specification I 6.9.1.5.b of Appendix A to Operating License NPP-58 for the Perry Nuclear Power Plant, Unit 1.

Included as an SRV " challenge" are the following actions / events: j

1. The SRV being physically operated by the manual control switch in the '

control room.

2. The SRV automatically lifts per design pressure limit when installed in the plant.

III. Reactor Coolant System Specific Activity Analysis .

During 1995, the specific activity limits, required by Technical Specification 3.4.5, were not exceeded. This information is submitted in accordance with Technical Specification 6.9.1.5.c.

IV. Silicone Sealant Inspections During 1995, no refueling outages were performed; therefore, no silicone sealant inspections were performed. This information is provided in accordance with the response to License Commitment 17 of USAR Appendix B (reference letter PY-CEI/NRR-0703L, dated August 27, 1987 from Murray R.

Edelman).