MONTHYEARPY-CEI-NRR-2259, Plant,Jan-Dec 1997 Annual Rept to Nrc1997-12-31031 December 1997 Plant,Jan-Dec 1997 Annual Rept to Nrc ML20216G7611997-10-23023 October 1997 Safety Evaluation Summary,Per 10CFR50.59(B)(2) PY-CEI-NRR-2145, Jan-Dec 1996 Annual Rept1996-12-31031 December 1996 Jan-Dec 1996 Annual Rept PY-CEI-NRR-2024, Jan-Dec 1995 Annual Rept1995-12-31031 December 1995 Jan-Dec 1995 Annual Rept ML20081B7661994-12-31031 December 1994 Pnpp Safety Evaluation Summary Per 10CFR50.59(B)(2) PY-CEI-NRR-1918, NPP,940101-1231 Annual Rept1994-12-31031 December 1994 NPP,940101-1231 Annual Rept PY-CEI-NRR-1763, Jan-Dec 1993 Annual Rept. W/1993-12-31031 December 1993 Jan-Dec 1993 Annual Rept. W/ PY-CEI-NRR-1464, Annual Rept Jan-Dec 1991 Perry Nuclear Power Plant1991-12-31031 December 1991 Annual Rept Jan-Dec 1991 Perry Nuclear Power Plant ML20029B1871990-12-31031 December 1990 1990 Annual Rept. W/910228 Ltr ML20012A7141989-12-31031 December 1989 Jan-Dec 1989 Annual Rept. W/900228 Ltr ML20012C6511989-12-31031 December 1989 Safety Evaluation Summary,Per 10CFR50.59(b)(2) 1989. W/900313 Ltr PY-CEI-NRR-0970, Annual Rept for 19881988-12-31031 December 1988 Annual Rept for 1988 PY-CEI-NRR-0979, Safety Evaluation Summary Per 10CFR50.59(b)(2) 19881988-12-31031 December 1988 Safety Evaluation Summary Per 10CFR50.59(b)(2) 1988 ML20235G2681988-12-31031 December 1988 Annual ECCS Outage Rept,1988 PY-CEI-NRR-0820, Annual ECCS Outage Rept 19871987-12-31031 December 1987 Annual ECCS Outage Rept 1987 PY-CEI-NRR-0808, Clevland Electric Illuminating Co Perry Nuclear Power Plant,1987 Annual Operating Rept1987-12-31031 December 1987 Clevland Electric Illuminating Co Perry Nuclear Power Plant,1987 Annual Operating Rept PY-CEI-NRR-0596, Annual Rept to Nrc,Perry Nuclear Power Plant 860318-12311986-12-31031 December 1986 Annual Rept to Nrc,Perry Nuclear Power Plant 860318-1231 PY-CEI-NRR-0600, Annual ECCS Outage Rept,860318-12311986-12-31031 December 1986 Annual ECCS Outage Rept,860318-1231 1997-12-31
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217K1231999-10-14014 October 1999 Revised Positions for DBNPS & Pnpp QA Program ML20212J2011999-09-30030 September 1999 Safety Evaluation Supporting Transfer of Dl Ownership Interest in Pnpp to Ceico PY-CEI-NRR-2437, Monthly Operating Rept for Sept 1999 for Pnpp,Unit 1.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Pnpp,Unit 1.With PY-CEI-NRR-2429, Monthly Operating Rept for Aug 1999 for Pnpp,Unit 1.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Pnpp,Unit 1.With NUREG-1482, SE Approving Licensee Relief Requets PR-2,PR-3,PR-6,VR-6, VR-7,VR-10,PR-4,PR-5,VR-4,VR-5,VR-9,VR-1 & VR-3 Related to Inservice Testing Program,Second ten-year Interval for Perry Nuclear Power Plant1999-08-0909 August 1999 SE Approving Licensee Relief Requets PR-2,PR-3,PR-6,VR-6, VR-7,VR-10,PR-4,PR-5,VR-4,VR-5,VR-9,VR-1 & VR-3 Related to Inservice Testing Program,Second ten-year Interval for Perry Nuclear Power Plant PY-CEI-NRR-2424, Monthly Operating Rept for July 1999 for Perry Npp.With1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Perry Npp.With ML20210J3851999-07-28028 July 1999 Pnpp - Unit 1 ISI Summary Rept Results for Outage 7 (1999) First Period,Second Interval PY-CEI-NRR-2416, Monthly Operating Rept for June 1999 for Perry Nuclear Power Plant,Unit 1.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Perry Nuclear Power Plant,Unit 1.With ML20196A1951999-06-17017 June 1999 Instrument Drift Analysis ML20207G2741999-06-0707 June 1999 Safety Evaluation Concluding That Firstenergy Flaw Evaluation Meets Rules of ASME Code & That IGSCC & Thermal Fatigue Crack Growth Need Not Be Considered in Application PY-CEI-NRR-2409, Monthly Operating Rept for May 1999 for Perry Nuclear Power Plant,Unit 1.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Perry Nuclear Power Plant,Unit 1.With PY-CEI-NRR-2393, Special Rept Update:On 990327 Refueling Outage 7 Began & Troubleshooting Efforts Began.Troubleshooting of Affected Calbe Confirmed Fault in Drywell Section of Cable.Determined That Installation of Newer Technology Should Be Explored1999-05-12012 May 1999 Special Rept Update:On 990327 Refueling Outage 7 Began & Troubleshooting Efforts Began.Troubleshooting of Affected Calbe Confirmed Fault in Drywell Section of Cable.Determined That Installation of Newer Technology Should Be Explored ML20206G6451999-05-0303 May 1999 Safety Evaluation Authorizing Requests for Relief IR-032 to IR-035 & IR-037 to IR-040 Re Implementation of Subsections IWE & Iwl of ASME Section XI for Containment Insp PY-CEI-NRR-2399, Monthly Operating Rept for Apr 1999 for Perry Nuclear Power Plant,Unit 1.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Perry Nuclear Power Plant,Unit 1.With ML20206E2261999-04-29029 April 1999 Safety Evaluation Concluding That Proposed Alternatives Will Result in Acceptable Level of Quality & Safety.Authorizes Use of Code Case N-504 for Weld Overlay Repair of FW Nozzle Weld at Pnpp & Use of Table IWB-3514 ML20206D7911999-04-23023 April 1999 Rev 6 to PDB-F0001, COLR for Pnpp Unit 1 Cycle 8,Reload 7 ML20205P4371999-04-15015 April 1999 Safety Evaluation Concluding That Licensee Performed Appropriate Evaluations of Operational Configurations of safety-related power-operated Gate Valves to Identify Valves Susceptible to Pressure Locking or Thermal Binding ML18016A9011999-04-12012 April 1999 Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected PY-CEI-NRR-2389, Monthly Operating Rept for Mar 1999 for Perry Nuclear Power Plant,Unit 1.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Perry Nuclear Power Plant,Unit 1.With ML20205G4221999-03-31031 March 1999 Safety Evaluation Accepting Second 10-yr Interval IST Program Releif Requests for Plant,Unit 1 ML20205S0601999-03-31031 March 1999 Rept on Status of Public Petitions Under 10CFR2.206 with Status Change from Previous Update,990331 ML20206D8461999-03-31031 March 1999 Rev 1 to J11-03371SRLR, Supplemental Reload Licensing Rept for Pnpp,Unit 1 Reload 7 Cycle 8 ML20205D3101999-03-26026 March 1999 Safety Evaluation Supporting Amend 103 to License NPF-58 ML20205C3761999-03-26026 March 1999 Safety Evaluation Supporting Request for Proposed Exemption to 10CFR50,app a GDC 19 PY-CEI-NRR-2369, Special Rept:On 990127,PAMI Was Declared Inoperable.Caused by Low Resistance Reading Existing in Circuit That Goes to Drywell.Troubleshooting of Affected Cable Will Commence During RFO on 9902271999-03-0303 March 1999 Special Rept:On 990127,PAMI Was Declared Inoperable.Caused by Low Resistance Reading Existing in Circuit That Goes to Drywell.Troubleshooting of Affected Cable Will Commence During RFO on 990227 PY-CEI-NRR-2372, Monthly Operating Rept for Feb 1999 for Perry Nuclear Power Plant,Unit 1.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Perry Nuclear Power Plant,Unit 1.With ML20203A5961999-02-0202 February 1999 Safety Evaluation Accepting Licensee Proposed Revs to Responsibilities of Plant Operations Review Committee as Described in Chapter 17.2 of USAR ML20203A5211999-01-27027 January 1999 Safety Evaluation Accepting Licensee Calculations Showing That Adequate NPSH Will Be Available for HPCS Pumps ML20198R8921999-01-0707 January 1999 SER Accepting Licensee Proposed Amend to TSs to Delete Reference to NRC Policy Re Plant Staff Working Hours & Require Administrative Controls to Limit Working Hours to Be Acceptable ML20204J6751998-12-31031 December 1998 1998 Annual Rept for Dbnps,Unit 1,PNPP,Unit 1 & BVPS Units 1 & 2 PY-CEI-NRR-2356, Monthly Operating Rept for Dec 1998 for Perry Nuclear Power Plant,Unit 1.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Perry Nuclear Power Plant,Unit 1.With ML20206B0101998-12-31031 December 1998 1998 Annual Rept for Firstenergy Corp, for Perry Nuclear Power Plant & Davis-Besse Nuclear Power Station.Form 10-K Annual Rept to Us Securities & Exchange Commission for Fiscal Yr Ending 981231,encl ML20198J0031998-12-22022 December 1998 SER Accepting Licensee Response to GL 92-08,ampacity Derating Issues for Perry Nuclear Power Plant,Unit 1 PY-CEI-NRR-2346, Monthly Operating Rept for Nov 1998 for Perry Nuclear Power Plant,Unit 1.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Perry Nuclear Power Plant,Unit 1.With ML20195F6891998-11-0505 November 1998 Safety Evaluation Accepting Proposed Reduction in Commitment in Quality Assurance Program to Remove Radiological Assessor Position PY-CEI-NRR-2335, Monthly Operating Rept for Oct 1998 for Perry Nuclear Power Plant,Unit 1.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Perry Nuclear Power Plant,Unit 1.With PY-CEI-NRR-2329, Monthly Operating Rept for Sept 1998 for Perry Nuclear Power Plant,Unit 1.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Perry Nuclear Power Plant,Unit 1.With ML20153B8221998-09-16016 September 1998 Safety Evaluation Accepting Changes to USAR Section 13.4.3, 17.2.1.3.2.2,17.2.1.3.2.2.3 & App 1A PY-CEI-NRR-2323, Monthly Operating Rept for Aug 1998 for Perry Nuclear Power Plant,Unit 1.With1998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Perry Nuclear Power Plant,Unit 1.With PY-CEI-NRR-2313, Monthly Operating Rept for July 1998 for Perry Nuclear Power Plant,Unit 11998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Perry Nuclear Power Plant,Unit 1 PY-CEI-NRR-2306, Monthly Operating Rept for June 1998 for Perry Nuclear Power Plant,Unit 11998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Perry Nuclear Power Plant,Unit 1 ML20249A1891998-06-11011 June 1998 SER on Moderate Energy Line Pipe Break Criteria for Perry Nuclear Power Plant,Unit 1 & Requests Addl Info to Demonstrate That Plant & FSAR in Compliance W/Staff Position & GDC as Discussed in SER ML20248F3531998-05-21021 May 1998 Part 21 Rept Re Electronic Equipment Repaired or Reworked by Integrated Resources,Inc from Approx 930101-980501.Caused by 1 Capacitor in Each Unit Being Installed W/Reverse Polarity. Policy of Second Checking All Capacitors Is Being Adopted PY-CEI-NRR-2282, Monthly Operating Rept for Apr 1998 for Perry Nuclear Power Plant,Unit 11998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Perry Nuclear Power Plant,Unit 1 ML20217D2051998-04-20020 April 1998 SER Authorizing Licensee to Use Code Case N-524 Until Such Time as Code Case Included in Future Rev of RG 1.147 PY-CEI-NRR-2277, Monthly Operating Rept for Mar 1998 for Perry Nuclear Power Plant,Unit 11998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Perry Nuclear Power Plant,Unit 1 ML20217D5701998-03-20020 March 1998 Part 21 Rept 40 Re Governor Valve Stems Made of Inconel 718 Matl Which Caused Loss of Governor Control.Control Problems Have Been Traced to Valve Stems Mfg by Bw/Ip.Id of Carbon Spacer Should Be Increased to at Least .5005/.5010 ML20216G3901998-03-11011 March 1998 SER on Proposed Merger Between Duquesne Light Co & Allegheny Power Sys,Inc ML20216J1401998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Perry Nuclear Power Plant,Unit 1 PY-CEI-NRR-2258, Monthly Operating Rept for Jan 1998 for Perry Nuclear Power Plant,Unit 11998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Perry Nuclear Power Plant,Unit 1 1999-09-30
[Table view] |
Text
{{#Wiki_filter:.
, r, 1 CLEVELAND ELECTRIC ILLUMINATING COMPANY PERRY NUCLEAR POWER PLANT ANNUAL ECCS' OUTAGE REPORT' JANUARY 1, 1988 - DECEMBER 31,~1988 DOCKET NUMBER: 50-440 LICENSE NUMBER:- NPF-58 Submitted ~By: ~ k Directbr,/PPTD eg ' ,
. _ .'. 1 Ge'f1Fril Managger, PPOD l
gg2230188890214 R ADOCK 05o00440 PDC 1
PERRY UNIT 1 1988 ECCS OUTAGES
\:
This comprises the 1988 Annual ECC System-Outage Report, which is
< submitted in accordance-with USAR - TMI Action Plan Item II.K.3.17
'(Appendix 1A) and NUREG-0807 Section 6.3.3. The report covers'the period from January 1, 1988 to December 31, 1988. This.information was compiled from a review of Perry's " Active " Limiting Condition for operations (Active LCO) log for 1988. Performance of instrumentation surveillance tests which do not render.any ECCS subsystems inoperable are not included in this report. Also, Low Pressure Coolant Injection (LPCI) outages in support of Shutdown Cooling operations were not included, as plant design requires these outages. This method is consistent with that used in the 1987 report.
The following definition of " system outage" was used in the pre--
paration of this report:
"The inability of an ECC system to perform its intended function during a time when the system is required to be operable."
s 4 a 1988 LPCI'"A"~(E12A)' OUTAGES'
-. TIME. -TIME OUTAGE ENTERED. CLEARED DURATION DESCRIPTION
+ 0815 1720 9 HR Operational Condition: 1 1/2- 1/2 5 MIN . Applicable Tech' Spec: 3.5.1 E12-F024A Tagged Shut'To Allow-Test Equipment Hookup.
1742 ~2304 1 DAY Operational Condition: 1 2/22 2/23 5 HR . Applicable _ Tech Spec 3.5.1 -
' ,; . 22 MIN RHR "A" Inop For Flushing in Preparation For SDC Operation.
0610 23321 17 HR- Operational Condition: l' 3/16 3/16 22 MIN Applicable Tect Spec: 3.5.1-RHR "A" Not Fi'. led'and-Vented.
+ 0400 0331 2 DAYS Operational Condition: 1 4/11 .4/14 23 HR. Applicable Tech Spec: 3.5.11 31 MIN RHR "A" Inop For Divisional Outage.
+ 0331 0940 1 DAY Operational Condition:'1.
4/14 4/15 6 HR Applicable Tech Spec: 3.5.1 9 MIN LPCI "A" InopfTo Repair Injection Valve Permissive Pressure Switch.
+ 2120 1836 2 DAYS Operational Condition: 1 4/15 4/18 21 HR Applicable Tech Spec: 3.5.1 16 MIN RHR "A" Pump Breaker Racked Out During SPCU (G42)
Operation..
1130 1915 7 HR Operational Condition: 1 d 5/13 5/13 45 MIN Applicable Tech Spec: 3.5.1 I RHR "A" Pump Auto Start l Relay Repair Work.
0815 0925 1 HR Operational Condition: 1 6/11 6/11 10 MIN Applicable Tech spec: 3.5.1 RHR "A" Pump Failed Fill l
and Vent SVI Due To A Vent Valve Problem, l
+ Planned Outage 1
I i
______-__---__a
c ,. -,..
e ll e., <
1988 LPCI "A" (E12A) OUTAGES'
.TIMEJ . TIME ' OUTAGE ENTERED. CLEARED- -DURATION i DESCRIPTION 0630 2005 13..HRl Operational Condition: 6/16- ~6/16 35 MIN. Applicable Tech Spec: . 3. 5.1' RHR "A" Loop'Not FilledLand
-Vented.
+ 0445 0050 21 DAY Operational. Condition: 1:
7/11 7/14 20 HR Applicable Tech-Spec:l3.5.1 5 MIN RHR "A"JInop-For-Maintenance and Repetitive' Tasks.
1835 1207 17 HR Operational' Condition:'1. -
7/29 7/30- 32 MIN Applicable Tech. Spec: 13.5.1' RHR "A"'Inop.Due-To'ESW (P45):
"A" Inop For Failing an SVI.
1030' 1645 6 HR. Operational ~ Condition: 3I 9/17 9/17 15 MIN Applicable Tech Spec: 3.5.1 RHR "A" Inop For. Flushing in Preparation for SDC Operation. .
0600 ~2245 16 HR Operational' Condition:11 10/19 10/19 45 MIN Applicable Tech Spec::3.5.1 RHR "A" Inop Due To a. Low Pressure Alarm Received After.
Pump Shutdown From Suppression Pool Cooling Operation.
+ Planned Outage l
4 h
'l f
w t 4 -
b 4 H j.
~
r ..
,. . . . o 1988 LPCi'"B"'(E12B) OUTAGES
' TIME' TIMEL ' OUTAGE LENTERED CLEARED DURATION- DESCRIPTION
+ .2125- 1810 2 DAY ' Operational Condition:11' 2/15 2/18 20 HR Applicable' Tech; Specs 3.6.3.21 45 MIN RHR "B" Inop Due1To ECCW (P42) i "B" Maintenance and' Repetitive Tasks.,
j 0000 0320 3 HR. ~ Operational Condition: 1-
'3/12 3/12~ 20 MIN' Applicable Tech Spec: 3.5.1L RHR "B"'Not Filled and Vented.
0155 0100- 2 DAY Operational Condition: 1; 3/13 3/16 23 HR Applicable ~ Tech Spec:.3.5.1 <
5 MIN 'RHR'"B" Inop ToLRepair?Two Snubbers.
+ 1330 1330 -2 DAY . Operational Condition:'1 5/17- 5/19 : Applicable Tech Spec: 3.5.1
.RHR "B"~Inop For. Maintenance
.and Repetitive Tasks.
1524 0755 16 HR Operational ~ Condition: 4-6/24 6/25 31 MIN Applicable' Tech Spec:.3.4.9.2 RHR ")B" SDC Inop Due To ECCW (P42) "B""Inop Due To a Failed SVI.
+ 0330 0105 2 DAY Operational Conditiots: 1 7/5 7/8 21 HR Applicable Tech Spec: 3.5.1 35 MIN RHR "B" Inop For Maintenance and Repetitive Tasks.
+ '0945 1400 2 DAY Operational Condition: 1 8/23 8/25 4.HR Applicable Tech spec: 3.6.3.2 15 MIN RHR "B" Containment Spray Mode Inop To Install a DCP On The Hydrogen Mixing Compressor.
.1505 0450 13 HR Operational Condition: 1 9/14 9/15 45 MIN Applicable Tech Spec: 3.5.1-RHR "B" Inop Due To ECCW (P42)
"B' Inop Due To a Failed SVI.
+ Planned Outage
4 M e h
b ,
l-1988 LPCI "B" (E12B) OUTAGES TIME' TIME OUTAGE ENTERED CLEARED- DURATION DESCRIPTION
+ 0325 2130 2 DAY Operational Condition: 1 11/14 11/16 18 HR Applicable Tech _ Spec: 3 . 5.1.
5 MIN lRHR "B" Pump Breaker Racked Ou For Maintenance and Repetitive Tasks. In Addition,'ESW (P45).
"B" Inop For1 Maintenance.
+ Planned Outage l
l t
I
- _ _ _ _ -_ _ _ _ _ _ _ . ._____-_________-_-_a
w--
l n l j
l
' I 1988 LPCI "C" (E12C) OUTAGES l l
I f'
H TIME ENTERED TIME CLEARED OUTAGE DURATION DESCRIPTION q
i 4
L + 0900 1700 2 DAYS Operational. Condition: 1 I 2/15 2/18 8 HR Applicable Tech Spect-3.5.1 RHR "C" Inop For Maintenance.
{
and Repetitive Tasks. i
+ 1330 1445 2 DAYS Operational Conditions.1 5/17 5/19 1 HR Applicable. Tech spec: 3.5.1
- 15. MIN RHR "C" Inop For Maintenance.
+ 0330 0105 2 DAYS Operational Condition: 1 7/5 7/8 21 HR Applicable Tech Spec: 3.5.1 35 MIN RHR "C" Inop For Maintenance and Repetitive Tasks.
1505 0450 13 HR Operational' Condition: 1 9/14 9/15 45 MIN Applicable Tech Spec: 3.5.1 RHR "C" Inop Due'To ECCW (P42)
"B" Inop Due To a Failed SVI.
+ 0325_ 1711 2 DAY Operational Condition: 1 11/14 11/16 13 HR Applicable Tech Spec: 3.5.1 46 MIN RHR "C" and ESW (P45) "B" Inop For Maintenance and Repetitive Tasks.
+ Planned Outage i
-{
)
1988 LPCS (E21) OUTAGES
" t TIME TIME OUTAGE #
ENTERED CLEARED DURATION DESCRIPTION
+ 0400 0331 2 DAY Operational Condition: 1 4/11 4/14 23.HR- Applicable Tech Spec: -3.5.1 d 31 MIN ~LPCS Inop To Perform Maint- 'I enance and Repetitive Tasks. l
-+ 0445 0140 20 HR Operational Condition: 1-7/11 7/12 55 MIN Applicable Tech spec: 3.5.1 LPCS Inop To. Change Oil'In The Waterleg Pump (Repetitive Task)~
1835 1207 17 HR Operational Condition:.'1 7/29 7/30 32 MIN Applicable Tech Spec::3.5.1 LPCS Inop Due To ESW (P45)
"A" Inop For Failing an SVI.
+ Planned Outage 4
L, f. t -
p' ... .
L L
1988 HPCS (E22) OUTAGES l'
TIME TIME OUTAGE ENTERED CLEARED DURATION DESCRIPTION
+ 0500 1825- 1 DAY Operational Condition: 1 3/3 3/4 13 HR Applicable Tech Spec: .3.5.1 25 MIN HPCS Inop To Repair An Oil Leak On The Waterleg. Pump..
1445 2025 5 HR Operational Condition: 1 3/9 3/9 40 MIN Applicable Tech Spect 3.5.1 HPCS Inop For Not Having a Suppression Pool Water Supply..
+ 2030 1229 7 DAYS Operational Condition: 1 3/22 3/30 15 HR Applicable Tech Spec: 3.5.1 59 MIN HPCS Inop To Replace The Mechanical Seal On The Pump.
+ 0845 1155 5 DAYS Operational Condition: 1 4/25 4/30 3 1:R Applicable Tech Spec: 3.5.1 10 MIN HPCS Inop To Perform Maint-enance and Repetitive. Tasks'.-
0705 0225 19 HR Operational Condition: 1 6/29 6/30 20 MIN Applicable Tech spec: 3. 5.1 - .
HPCS Inop Due To Leak .)
Detection Line Break l Instrumentation Problem.
0645 0740 1 DAY Operational Condition: 2 9/17 9/18 55 MIN Applicable Tech Spec: 3.5.1 HPCS Inop Due To Leak Detection Line Break Instrumentation Problem.
+ Planned Outage