PLA-6023, Proposed Amendment Nos. 269 and 236, DC Electrical Power Systems Technical Specifications Rewrite - Supplemental Information

From kanterella
Jump to navigation Jump to search
Proposed Amendment Nos. 269 and 236, DC Electrical Power Systems Technical Specifications Rewrite - Supplemental Information
ML062780183
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 09/28/2006
From: Mckinney B
Susquehanna
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
PLA-6023
Download: ML062780183 (7)


Text

Britt T. McKinney PPL Susquehanna, LLC  % 4fI Sr. Vice President & Chief Nuclear Officer 769 Salem Boulevard Berwick, PA 18603 Tel. 570.542.3149 Fax 570.542.1504 'II, btmckinney@pplweb.com ' TM SEP 2 8 2006 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop OPl-17 Washington, DC 20555 SUSQUEHANNA STEAM ELECTRIC STATION PROPOSED AMENDMENT NO. 269 TO UNIT 1 LICENSE NPF-14 AND PROPOSED AMENDMENT NO. 236 TO UNIT 2 LICENSE NPF-22:

DC ELECTRICAL POWER SYSTEMS TECHNICAL SPECIFICATIONS REWRITE -

SUPPLEMENTAL INFORMATION Docket Nos. 50--387 PLA-6023 and 50 -388

References:

1) PLA-5825, B. T. McKinney (PPL) to Document Control Desk (USNRC),

ProposedAmendment No. 269 to Unit I License NPF-14 and ProposedAmendment No. 236 to Unit 2 License NPF-22:

"DC ElectricalPowerSystems Technical Specifications Rewrite,"

dated November 9, 2004.

The purpose of this letter is to supplement the referenced amendment request, which proposed changes to the SSES Units 1 and 2 Technical Specification (TS) 3.8.6. The revised markups, included herein as Attachment 1, provide the information discussed during a teleconference held between R. V. Guzman (NRC) and D. L. Filchner (PPL Susquehanna, LLC) on February 16, 2006.

Specifically, the markups of TS LCO 3.8.6 Conditions A, B, C, and D, previously submitted in Reference 1 are revised such that the "and/or" in each of these LCO conditions is withdrawn and replaced with "or." This revised wording is consistent with PPL's current TS and the intent of TSTF-360 for DC Electrical Power Systems TS Rewrite.

PPL has reviewed the previously submitted "No Significant Hazards Consideration" and the "Environmental Consideration" relative to these revisions. We have determined that there are no changes required to either of these documents.

ADD(

Document Control Desk PLA-6023 Please direct any questions regarding this response to Mr. Duane L. Filchner at (610) 774-7819.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on: -

Attachments: - Revised Proposed Units 1 & 2 Technical Specification 3.8.6 Changes to Conditions A, B, C, D (Mark-ups) cc: NRC Region I Mr. A. J. Blarney, NRC Sr. Resident Inspector Mr. R. V. Guzman, NRC Project Manager Mr. R. Janati, DEP/BRP

Attachment 1 to PLA-6023 Proposed Units I & 2 Technical Specification 3.8.6 Changes to Conditions A, B, C, D (Revised Markups)

PPL Rev. 9' Battery Gel4-Parameters 3.8.6 3.8 ELECTRICAL POWER SYSTEMS 3.8.6 Battery Geti- Parameters LCO 3.8.6 Battery Gell- parameters for the Class 1 E 250 V batteries and Class 1 E 125 V I batteries shall be within limits.

APPLICABILITY: When associated DC electrical power subsystems are required to be OPERABLE.

ACTIONS


N-NOTE--------------------------

Separate Condition entry is allowed for each battery.

CONDITION REQUIRED ACTION COMPLETION TIME A. One o n~ AA1 V.erify; pilot cell el9Gerlyte_ 1 heuw leAe And floAt o-ltagenot more batte,' coln. Table 3.8.6-1 Catego.y C parameters not wiA4thin C-ategr - or B limis.

AND A.2 Rstorify battery cell parameters d feet Table 3.8.6-1 Category G AND GRGe peF 7 days thereaftei AND A.3 Restore battery cl ,, days parameters to Categor' A and- B limits of Table 3.8.6 1.

A. One 125 VDC electrical A.1 Perform SR 3.8.4.1 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> power subsystem or one 250 VDC electrical nower AND subsystem with one or more battery cells float A.2 Perform SR 3.8.6.1 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> voltage < 2.07 V.

AND A.3 Restore affected cell voltage 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />

>_2.07 V.

(continued)

SUSQUEHANNA - UNIT 1 TS / 3.8-32 Amendment 1/8,

PPL Rev. 9' Battery Ge&-Parameters 3.8.6 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME B. One 125 VDC electrical B.1 Perform SR 3.8.4.1 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> power subsystem or one 250 VDC electrical power AND subsystem with float current > 2 amps. B.2 Restore battery float current 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> to*< 2 amps.

C. ------ NOTE - -------------------- NOTE ---------

Required Action C.2 shall Required Actions C.1 and C.2 are be completed if only applicable if electrolyte level electrolyte level was was below the top of plates.

below the top of plates.

One 125 VDC electrical C.1 Restore electrolyte level to 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> power subsystem or one above top of plates.

250 VDC electrical power subsystem with one or AND more cells electrolyte level less than minimum established desiqn limits.

C.2 Verify no evidence of 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> leakaqe.

AND C.3 Restore electrolyte level to 31 days qreater than or equal to minimum established desiqn limits.

D. One 125 VDC electrical D.1 Restore battery pilot cell 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> power subsystem or one temperature to qreater than 250 VDC electrical power or equal to minimum subsystem with pilot cell established desiqn limits electrolyte temperature less than minimum established desiqn limits.

(continued)

SUSQUEHANNA - UNIT 1 TS / 3.8-33 Amendment 1/8,

PPL Rev. ,'

Battery Ge*l-Parameters 3.8.6 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME A. One 125 VDC electrical A.1 Perform SR 3.8.4.1 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> power subsystem or one 250 VDC electrical power AND subsystem with one or more battery cells float voltage A.2 Perform SR 3.8.6.1 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />

< 2.07 V.

AND A.3 Restore affected cell voltage 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />

>_ 2.07 V.

B. One 125 VDC electrical B.1 Perform SR 3.8.4.1 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> power subsystem or one 250 VDC electrical power AND subsystem with float current

> 2 amps. B.2 Restore battery float current to 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />

< 2 amps C. ------ NOTE ---- -------------------- NOTE ---------

Required Action C.2 shall be Required Actions C.1 and C.2 are completed if electrolyte level only applicable if electrolyte level was below the top of plates, was below the top of plates.

One 125 VDC electrical C.1 Restore electrolyte level to 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> power subsystem or one 250 above top of plates.

VDC electrical power subsystem with one or more AND cells electrolyte level less than minimum established design limits.

C.2 Verify no evidence of 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> leakage.

AND (continued)

SUSQUEHANNA - UNIT 2 TS / 3.8-40 Amendment 1

PPL Rev. 9' Battery GeUl-Parameters 3.8.6 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME C.3 Restore electrolyte level to 31 days greater than or equal to minimum established design limits.

D. One 125 VDC electrical D.1 Restore battery pilot cell 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> power subsystem or one temperature to greater 250 VDC electrical power than or equal to minimum subsystem with pilot cell established design limits.

electrolyte temperature less than minimum established design limits.

E. Two 125 VDC electrical E.1 Restore battery 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> power subsystems or both parameters for batteries in 250 VDC electrical power one 125 VDC electrical subsystems with battery power subsystem or one parameters not within limits. 250 VDC electrical power subsystem to within limits.

BF. Required Action and BF.1 Declare associated battery Immediately associated Completion inoperable.

Time of Condition A-A B, C D, or E not met.

OR On or moro batteries with ave'oago oloctrolyte-temperature of the reprocon~tativo colIc not One or more batteries with one or more batte; oý parametere no Within Categery G v.alucei.

SUSQUEHANNA - UNIT 2 TS / 3.8-41 Amendment 1